[{"data":1,"prerenderedAt":1971},["ShallowReactive",2],{"blog-zh-CN-manage-sprint-dependencies-with-chained-pull-requests":3,"blog-related-zh-CN-manage-sprint-dependencies-with-chained-pull-requests":190,"blog-chapter-zh-CN-manage-sprint-dependencies-with-chained-pull-requests":578},{"id":4,"title":5,"author":6,"body":7,"dateModified":165,"datePublished":166,"description":167,"extension":168,"heading":169,"image":170,"imageAlt":16,"keywords":171,"locale":177,"meta":178,"navigation":179,"path":180,"reviewed":179,"seo":181,"sitemap":182,"slug":187,"stem":188,"translationKey":187,"__hash__":189},"blog\u002Fblog\u002Fzh-CN\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","冲刺依赖与链式拉取请求 | AELBOX","AELBOX",{"type":8,"value":9,"toc":144},"minimark",[10,22,25,34,39,43,52,55,58,61,65,68,71,74,77,80,84,87,95,99,102,105,108,111,114,117,120,123,126,129,132,135,138,141],[11,12,13],"p",{},[14,15],"img",{"alt":16,"height":17,"loading":18,"src":19,"width":20,"fetchPriority":21},"桌上的金属链条、Planning Poker 卡片和咖啡杯",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[11,23,24],{},"冲刺中经常包含相互依赖的工作项，可能出现在一个团队内部，也可能跨多个 Scrum 团队。理想情况下，依赖本不该存在；但在现实中，业务需求优先，为了缩短发布周期，依赖被加了进来。本文介绍软件团队管理依赖任务的一种方法。",[11,26,27],{},[14,28],{"alt":29,"height":30,"loading":31,"src":32,"width":30,"decoding":33},"任务之间的依赖",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[11,35,36],{},[37,38,29],"em",{},[40,41,42],"h2",{"id":42},"传统做法",[11,44,45,46,51],{},"最直接的做法是：等依赖项合并进主分支后，立刻开始任务。这样一来，一些成员会在任务就绪之前一直闲着。最终，剩下的依赖任务几乎没有时间可用。最后几个任务被遗留到下一个冲刺，",[47,48,50],"a",{"href":49},"\u002Fzh-CN\u002Fblog\u002Fcomparison-metrics-for-agile-teams","团队自然不高兴","。",[11,53,54],{},"为什么容量估算正确，却还是会发生这种情况？主要原因是等待同事完成工作时的空闲时间。即便是很小的延误也会累积，在短冲刺中尤其明显。",[40,56,57],{"id":57},"同时处理有依赖的任务",[11,59,60],{},"有一种方法可以做到这一点，只需付出很小的额外成本。当团队成员同时处理任务时，有几项好处。",[62,63,64],"h3",{"id":64},"更好的协作",[11,66,67],{},"当成员同时处理有依赖的任务时，这种方式类似结对编程。一个人必须理解上游任务，另一个人必须理解下游任务。团队对所解决的问题因此有了更广的了解。",[62,69,70],{"id":70},"避免空闲时间",[11,72,73],{},"任务并行推进时，没有人需要等某个修复落地。大家可以同时工作，遇到问题时也能随时讨论。",[62,75,76],{"id":76},"拉取请求更早进入代码评审",[11,78,79],{},"当你的分支基于同事的分支时，批准最初的拉取请求会更容易。你已经了解上游工作项是如何实现的，而原分支在整个实现过程中经过了测试和评审。它不再是陌生的领域。",[40,81,83],{"id":82},"使用链式堆叠式拉取请求","使用链式（堆叠式）拉取请求",[11,85,86],{},"这种程度的并行需要合适的工具。基于 Git 的版本控制就能直接做到。下面的步骤描述了这一过程。",[11,88,89],{},[14,90],{"alt":91,"height":92,"loading":31,"src":93,"width":94,"decoding":33},"依赖树（同时处理 6 个有依赖的任务）",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[11,96,97],{},[37,98,91],{},[62,100,101],{"id":101},"清晰勾勒依赖关系",[11,103,104],{},"在冲刺规划期间定义依赖链。之后，拉取请求链严格遵循这个定义。开发中途修改链条的代价很高，因为需要变基。",[62,106,107],{"id":107},"先从根任务开始",[11,109,110],{},"每条依赖链都有不依赖任何其他任务的根任务。它们的工作可以从第一天就开始。",[62,112,113],{"id":113},"先完成核心实现",[11,115,116],{},"这可能与测试驱动开发相冲突，因为后者要求先写测试。为了让拉取请求链保持可控，先实现核心部分。这样，依赖它的成员能更早拿到可用的代码。",[62,118,119],{"id":119},"按先进先出队列组织代码评审",[11,121,122],{},"最先创建的分支应最先评审和合并。每次合并都会触发 CI；如果它破坏了主构建，问题还能在影响尚小时就被修复。",[40,124,125],{"id":125},"额外成本",[11,127,128],{},"维护一条依赖分支链有好处，也有一些代价。",[62,130,131],{"id":131},"变基与合并",[11,133,134],{},"链条必须保持同步，这需要付出精力。现代工具在没有冲突时提供与基础分支的一键同步。在安全的情况下按需使用，把上游变更拉进来。构建通过、功能正常时，就同步。",[62,136,137],{"id":137},"团队协作",[11,139,140],{},"依赖链需要一个愿意彼此沟通、善于协作的团队。如果大家各自为战，这套方法就行不通。",[11,142,143],{},"有依赖的工作项最好放在当前冲刺之外。当业务需求要求它们并行推进时，用一条派生分支组成的链来管理依赖带来的额外成本，是一种切实可行的办法。",{"title":145,"searchDepth":146,"depth":146,"links":147},"",2,[148,149,155,161],{"id":42,"depth":146,"text":42},{"id":57,"depth":146,"text":57,"children":150},[151,153,154],{"id":64,"depth":152,"text":64},3,{"id":70,"depth":152,"text":70},{"id":76,"depth":152,"text":76},{"id":82,"depth":146,"text":83,"children":156},[157,158,159,160],{"id":101,"depth":152,"text":101},{"id":107,"depth":152,"text":107},{"id":113,"depth":152,"text":113},{"id":119,"depth":152,"text":119},{"id":125,"depth":146,"text":125,"children":162},[163,164],{"id":131,"depth":152,"text":131},{"id":137,"depth":152,"text":137},"2026-11-21","2018-05-27","有依赖的工作项会让冲刺停滞，大家都在等待。了解堆叠式拉取请求如何让工作持续流动，并减少空闲时间。","md","用链式拉取请求管理冲刺依赖","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[172,173,174,175,176],"冲刺依赖","堆叠式拉取请求","链式拉取请求","代码评审","敏捷交付","zh-CN",{},true,"\u002Fblog\u002Fzh-cn\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":5,"description":167},{"loc":180,"images":183,"lastmod":165},[184,185,186],{"loc":19},{"loc":32},{"loc":93},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fzh-CN\u002Fmanage-sprint-dependencies-with-chained-pull-requests","9HWk5FBczoQcum_xZW8g0Ulmu7K8ofCsJ-pKr0hIWkw",[191,329,485],{"id":192,"title":193,"author":6,"body":194,"dateModified":165,"datePublished":308,"description":309,"extension":168,"heading":310,"image":311,"imageAlt":200,"keywords":312,"locale":177,"meta":318,"navigation":179,"path":319,"reviewed":179,"seo":320,"sitemap":321,"slug":326,"stem":327,"translationKey":326,"__hash__":328},"blog\u002Fblog\u002Fzh-CN\u002Fcomparison-metrics-for-agile-teams.md","敏捷团队的对比指标 | AELBOX",{"type":8,"value":195,"toc":299},[196,203,206,209,212,220,224,227,230,233,236,244,248,256,259,262,265,272,276,279,286,289,293,296],[11,197,198],{},[14,199],{"alt":200,"height":201,"loading":18,"src":202,"width":20,"fetchPriority":21},"桌上的直尺、Planning Poker 卡片和咖啡杯",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[11,204,205],{},"比较敏捷团队并不容易，也值得问一问：我们究竟为什么要比较？把不同领域的团队放在一起对比，到底有什么帮助？",[40,207,208],{"id":208},"营造良性竞争",[11,210,211],{},"不应该用随意挑选的指标给团队排名，那只会打击士气。相反，指标应当让每个团队都有平等竞争的机会。这样，绩效的提升源自团队自身的意愿，而不是有人在一旁催促。",[11,213,214],{},[14,215],{"alt":216,"height":217,"loading":31,"src":218,"width":219,"decoding":33},"营造竞争氛围",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[11,221,222],{},[37,223,216],{},[40,225,226],{"id":226},"创造平等机会的指标",[11,228,229],{},"以下是四项用于比较团队的基础指标。它们只衡量每个团队在公平条件下竞争的能力，仅此而已。可比的指标创造平等的机会。",[62,231,232],{"id":232},"成功的冲刺",[11,234,235],{},"如果冲刺只是一个时间区间，那它毫无意义。冲刺是一个里程碑，需要有一个目标。冲刺目标（最重要的一组故事）是较大的里程碑，完成每一个故事则是较小的里程碑。在每个冲刺结束时举行跨团队演示，让各团队展示自己交付的成果。这种良性竞争会鼓励团队完成冲刺目标。人需要一个看得见的目标才有动力。",[11,237,238],{},[14,239],{"alt":240,"height":241,"loading":31,"src":242,"width":243,"decoding":33},"朝着目标冲刺",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[11,245,246],{},[37,247,240],{},[11,249,250,251,255],{},"这会不会变成一场过度承诺与刻意少承诺的游戏？如果团队承诺不足，演示会暴露一切：能展示的东西更少。如果承诺过多，演示就成了",[252,253,254],"strong",{},"又一次失败的冲刺","。交付自己所承诺的内容，会积累做得更多的动力，团队也会对工作感到满意。",[62,257,258],{"id":258},"速度的稳定性与诚实估算",[11,260,261],{},"这是知识工作，不是流水线作业。如果团队里没有人足够理解某个问题、能够估算它的解决方案，那就说明这个问题事先没有得到充分调研。",[11,263,264],{},"在上一个冲刺中安排一次限时调研，然后由团队一起评审调研结果，就能轻松地把实现拆成更小的故事并妥善估算。对于复杂的工作，可以写一份更完整的技术设计文档，列出各个实现故事。",[11,266,267,268,51],{},"调研和设计工作本身就是可以被估算的故事。关键在于为复杂的解决方案定义工作的结构和顺序。与其承诺一个团队并不理解的故事，不如创建一个调研任务来填补空白。这样，估算才",[47,269,271],{"href":270},"\u002Fzh-CN\u002Fblog\u002Fsheepherding-story-points","有据可依",[62,273,275],{"id":274},"容量的可预测性避免意外工作","容量的可预测性（避免意外工作）",[11,277,278],{},"先调研，后实现。随着调研暴露出问题，新的工作项被创建并估算。这样，你对下一个冲刺的把握就清晰得多。已知的工作可以被估算和规划；未知的工作先获得一个限时的调研工作项，然后再估算。这里的关键纪律，是把大块工作拆成小块、可估算的部分。",[11,280,281,282,51],{},"复杂的工作可以提前启动，哪怕只是为了发现它需要自己的一套故事。这仍然降低了",[47,283,285],{"href":284},"\u002Fzh-CN\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","未知带来的风险",[11,287,288],{},"支持和生产环境救火通常以限时的看板流程在冲刺之外运行。在那里，首次响应时间和 SLA 违规次数就成了对比指标。",[62,290,292],{"id":291},"团队可用率任务时间除以冲刺总时间","团队可用率（任务时间除以冲刺总时间）",[11,294,295],{},"可用率是指团队成员花在已估算工作上的时间占比。如果某个团队比其他团队更频繁地被拉去参加培训、知识分享或其他内部工作，就要纠正这种失衡。保持速度稳定的唯一办法，是保持可用率稳定。当各团队之间的可用率相当时，其他对比指标才能发挥作用。",[11,297,298],{},"比较团队不是为了惩罚表现不佳者，而是为了提升动力，以及竞争和交付更多的意愿。正因如此，这些指标不应让团队成员个人看到：它们是辅导工具，而不是公开排行榜。通过跟踪这些指标并间接引导 Scrum Master，你能让各团队站在同一起跑线上竞争。",{"title":145,"searchDepth":146,"depth":146,"links":300},[301,302],{"id":208,"depth":146,"text":208},{"id":226,"depth":146,"text":226,"children":303},[304,305,306,307],{"id":232,"depth":152,"text":232},{"id":258,"depth":152,"text":258},{"id":274,"depth":152,"text":275},{"id":291,"depth":152,"text":292},"2018-05-04","指标应当创造公平的起点，而不是排行榜。四项对比指标，既能激励敏捷团队，又不会惩罚他们。","敏捷团队的对比指标","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[313,314,315,316,317],"敏捷指标","团队速度","敏捷团队","Scrum","容量",{},"\u002Fblog\u002Fzh-cn\u002Fcomparison-metrics-for-agile-teams",{"title":193,"description":309},{"loc":319,"images":322,"lastmod":165},[323,324,325],{"loc":202},{"loc":218},{"loc":242},"comparison-metrics-for-agile-teams","blog\u002Fzh-CN\u002Fcomparison-metrics-for-agile-teams","QZbrcKPUFp3IzMTSASesw2G1BOOvVyYLtbpROgZjQW8",{"id":330,"title":331,"author":6,"body":332,"dateModified":165,"datePublished":462,"description":463,"extension":168,"heading":464,"image":465,"imageAlt":338,"keywords":466,"locale":177,"meta":471,"navigation":179,"path":472,"reviewed":179,"seo":473,"sitemap":474,"slug":482,"stem":483,"translationKey":482,"__hash__":484},"blog\u002Fblog\u002Fzh-CN\u002Fsheepherding-story-points.md","羊群效应与故事点：Planning Poker 中的锚定 | AELBOX",{"type":8,"value":333,"toc":453},[334,340,343,346,353,360,364,367,370,373,380,384,387,390,393,398,402,405,408,415,419,422,425,430,434,437,447,450],[11,335,336],{},[14,337],{"alt":338,"height":17,"loading":18,"src":339,"width":20,"fetchPriority":21},"茶几上的一群绵羊和 Planning Poker 卡片","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[11,341,342],{},"故事点估算常常被忽视，或者在聊天室和公开会议中进行，每个人的投票都能被看到或听到。知道别人如何投票会扭曲结果，产生不准确的估算。一再失准的估算会导致计划有缺陷，交付延期甚至取消。下面就是公开投票中发生的事情。",[40,344,345],{"id":345},"投票中的几类角色",[11,347,348,349,352],{},"在一场公开的估算投票中，会出现几类典型角色。估算结果取决于谁先出牌，而且通常离诚实相去甚远。为什么在公开投票中顺序如此重要？因为",[252,350,351],{},"羊群效应","：这种锚定偏差会让其他成员照搬第一个估算。",[11,354,355],{},[14,356],{"alt":351,"height":357,"loading":31,"src":358,"width":359,"decoding":33},746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[11,361,362],{},[37,363,351],{},[62,365,366],{"id":366},"过度自信的投票者",[11,368,369],{},"每个团队至少有一名成员认为自己最了解系统。他们通常第一个投票，因为答案在他们看来显而易见。他们常常忽略那些可能让估算偏离正轨的细节。这些细节本可以提前发现，但前提是有人发起讨论。而在公开投票中，这不可能发生。",[11,371,372],{},"这个人给出的估算通常低于诚实的水平。也许只有他们能这么快完成这个故事，而且还得靠运气。",[11,374,375],{},[14,376],{"alt":366,"height":377,"loading":31,"src":378,"width":379,"decoding":33},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[11,381,382],{},[37,383,366],{},[11,385,386],{},"其他人纷纷跟随，于是任务看起来很简单，仿佛在规定时间内谁都能完成。实际上，最后通常由别人来做。",[62,388,389],{"id":389},"沉默的投票者",[11,391,392],{},"沉默的投票者通常不止一个，他们不敢先投票，会等别人先出牌，然后照着抄。他们很少参与讨论，只在被问到时才回答。他们第二个投票，正好排在心不在焉的投票者之前。",[11,394,395],{},[14,396],{"alt":389,"height":377,"loading":31,"src":397,"width":379,"decoding":33},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[11,399,400],{},[37,401,389],{},[62,403,404],{"id":404},"心不在焉的投票者",[11,406,407],{},"在实现阶段很难抓住他们，但在投票时他们的表现一目了然。他们总是最后投票，并照抄别人的估算。如果几个估算不一致，他们就挑最常见的那一个。他们不愿解释为什么选了更低或更高的数字，因此在梳理中回避协作，也躲闪问题。",[11,409,410],{},[14,411],{"alt":404,"height":412,"loading":31,"src":413,"width":414,"decoding":33},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[11,416,417],{},[37,418,404],{},[62,420,421],{"id":421},"疲惫的投票者",[11,423,424],{},"有些成员无法长时间保持专注，会错过讨论中的关键部分。他们失去上下文，于是要么随口猜一个，要么找出最常见的投票抄下来。",[11,426,427],{},[14,428],{"alt":421,"height":377,"loading":31,"src":429,"width":379,"decoding":33},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[11,431,432],{},[37,433,421],{},[40,435,436],{"id":436},"如何在估算过程中保持专注",[11,438,439,440,444,445,51],{},"估算之所以重要，是因为只有诚实的故事点才能",[47,441,443],{"href":442},"\u002Fzh-CN\u002Fblog\u002Fcorrectly-estimating-release-deadline","让项目按计划走向发布日期","。无论使用纸质卡片还是软件，诚实估算的关键都在于对抗",[252,446,351],{},[11,448,449],{},"在主持人揭晓之前，团队成员绝不应该看到彼此的估算。这样，沉默的投票者开始思考，心不在焉的投票者产生兴趣，疲惫的投票者也清醒过来。最值得问的问题，尤其是当有人与团队意见不同时，是“你为什么投了 X 个故事点？”这会开启一场关于真实实现问题的对话。而“你同意 X 个故事点吗？”这类封闭式问题，只会换来一句毫无意义的“同意”。",[11,451,452],{},"好的估算工具能让梳理更有参与感，让每个人保持警觉、随时愿意讨论，即使是复杂的故事也能得到更好的估算。",{"title":145,"searchDepth":146,"depth":146,"links":454},[455,461],{"id":345,"depth":146,"text":345,"children":456},[457,458,459,460],{"id":366,"depth":152,"text":366},{"id":389,"depth":152,"text":389},{"id":404,"depth":152,"text":404},{"id":421,"depth":152,"text":421},{"id":436,"depth":146,"text":436},"2018-04-30","公开投票会让第一个估算锚定全场。看看羊群效应如何扭曲故事点，以及如何诚实地开展 Planning Poker。","羊群效应与故事点","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[467,468,469,351,470],"故事点","Planning Poker","锚定偏差","敏捷估算",{},"\u002Fblog\u002Fzh-cn\u002Fsheepherding-story-points",{"title":331,"description":463},{"loc":472,"images":475,"lastmod":165},[476,477,478,479,480,481],{"loc":339},{"loc":358},{"loc":378},{"loc":397},{"loc":413},{"loc":429},"sheepherding-story-points","blog\u002Fzh-CN\u002Fsheepherding-story-points","NSDqMFV96McI3KuKdQwrAbF7S9efeahz8eMEuTExyxw",{"id":486,"title":487,"author":6,"body":488,"dateModified":165,"datePublished":558,"description":559,"extension":168,"heading":560,"image":561,"imageAlt":494,"keywords":562,"locale":177,"meta":567,"navigation":179,"path":568,"reviewed":179,"seo":569,"sitemap":570,"slug":575,"stem":576,"translationKey":575,"__hash__":577},"blog\u002Fblog\u002Fzh-CN\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","每个冲刺都适用的 10% Scrumban 规则 | AELBOX",{"type":8,"value":489,"toc":553},[490,497,505,508,511,519,523,526,529,532,535,538,546,550],[11,491,492],{},[14,493],{"alt":494,"height":495,"loading":18,"src":496,"width":20,"fetchPriority":21},"茶几上的 Planning Poker 卡片和看板",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[11,498,499,500,504],{},"许多团队在规划时，会恰好用满 Jira 计划中显示的容量。这往往是错误的，并且会导致冲刺失败。既然",[47,501,503],{"href":502},"\u002Fzh-CN\u002Fblog\u002Fthe-importance-of-predictable-velocity","容量计算","看起来如此精确，为什么还会出问题？",[40,506,507],{"id":507},"急于交付更多",[11,509,510],{},"每成功完成一个冲刺，产品负责人往往就会推动更高的速度，这是对最新结果的自然反应。如果团队上个冲刺完成了若干故事点，下个冲刺就被期望完成更多。如此循环，直到某个冲刺失败。这种推动意在试探团队的极限。根据我们的经验，它适得其反，最终会让团队失去动力，把之后每一个冲刺都看作注定失败。",[11,512,513],{},[14,514],{"alt":515,"height":516,"loading":31,"src":517,"width":518,"decoding":33},"注定失败的冲刺",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[11,520,521],{},[37,522,515],{},[40,524,525],{"id":525},"赶交付时的冲刺尾声",[11,527,528],{},"当容量被安排得恰好填满冲刺时，任何延误或已经发生的风险，都会在尾声造成拼命赶工的压力。压力之下，团队交付的反而少于承诺。这种冲刺末尾的赶工应当被消除。",[40,530,531],{"id":531},"让团队自愿交付更多",[11,533,534],{},"只规划团队容量的 90%，把剩下的 10% 留给待办事项中未规划的工作。这些任务会在冲刺期间以 Scrumban 的方式从待办事项中拉取。缓冲吸收风险，让团队提前几天完成冲刺（至少完成冲刺目标）。如果外部依赖威胁到冲刺，缓冲中的任务可以替换出问题的那一个。",[11,536,537],{},"这 10% 不属于冲刺承诺。如果风险没有发生，团队把它作为额外工作交付；如果出了问题，缓冲被消耗，但冲刺目标和承诺仍然达成。要留意缓冲的使用比例：如果它经常达到 20%，就该在保留 10% 缓冲的同时，把团队的速度提高 10%。",[11,539,540],{},[14,541],{"alt":542,"height":543,"loading":31,"src":544,"width":545,"decoding":33},"提前交付，额外交付",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[11,547,548],{},[37,549,542],{},[11,551,552],{},"我们的经验表明，正是在没有压力的时候，员工贡献得最多。速度便能按团队自己的节奏提升，没有外部施压，压力也更小。这种增长显得自然且可持续。",{"title":145,"searchDepth":146,"depth":146,"links":554},[555,556,557],{"id":507,"depth":146,"text":507},{"id":525,"depth":146,"text":525},{"id":531,"depth":146,"text":531},"2018-04-28","按满容量承诺会让每个冲刺都变得脆弱。10% 的 Scrumban 缓冲可以吸收风险、保护冲刺目标，并让速度自然增长。","每个冲刺都适用的 10% Scrumban 规则","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[563,564,565,566,316],"Scrumban","冲刺容量","敏捷缓冲","速度",{},"\u002Fblog\u002Fzh-cn\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":487,"description":559},{"loc":568,"images":571,"lastmod":165},[572,573,574],{"loc":496},{"loc":517},{"loc":544},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fzh-CN\u002Fthe-10-percent-scrumban-rule-for-every-sprint","p0-rghNVJvC4Txj3fyeUtSb67VhM9W4HVae02T8dXEs",{"id":579,"title":580,"body":581,"dateModified":165,"datePublished":1956,"description":1957,"extension":168,"heading":1958,"image":1959,"imageAlt":1958,"keywords":1960,"locale":177,"meta":1961,"navigation":179,"order":1962,"path":1963,"section":1964,"seo":1965,"sitemap":1966,"slug":1967,"stem":1968,"translationKey":1969,"__hash__":1970},"guide\u002Fguide\u002Fzh-CN\u002Fplanning-sessions.md","计划会话 | Scrumpy Planning Poker",{"type":8,"value":582,"toc":1928},[583,586,593,596,603,609,669,672,687,690,693,700,722,732,746,757,760,763,766,793,797,823,838,841,844,856,863,866,894,897,900,918,930,933,943,949,952,955,962,968,974,993,1022,1025,1028,1031,1041,1143,1170,1173,1176,1178,1193,1196,1221,1224,1230,1247,1250,1253,1277,1280,1283,1286,1306,1312,1329,1332,1335,1337,1358,1372,1375,1378,1441,1449,1452,1455,1470,1483,1490,1493,1498,1500,1517,1523,1530,1533,1536,1539,1563,1566,1569,1572,1583,1586,1588,1598,1617,1635,1641,1652,1670,1673,1692,1695,1698,1701,1712,1718,1721,1736,1751,1764,1768,1785,1788,1791,1826,1829,1836,1838,1844,1851,1871,1880,1883,1890,1893,1899],[11,584,585],{},"计划会话将相关工作项分组，以便有条理地估算。它们通过收集工作项并跟踪各视角的估算进度，帮助你准备冲刺规划。",[11,587,588,589,592],{},"计划会话位于空间估算页面上。如果空间管理员在空间设置中隐藏该页面，工作项上的",[252,590,591],{},"添加到计划","操作也会随之隐藏。",[40,594,595],{"id":595},"创建计划会话",[11,597,598,599,602],{},"在空间估算页面的",[252,600,601],{},"需求梳理\u002F细化","标签页中：",[604,605],"docs-figure",{"alt":606,"caption":607,"stem":608},"包含标题、描述和计划的创建规划会话对话框","创建规划会话","guide-planning-create",[610,611,612,619,622,640,664],"ol",{},[613,614,615,616,51],"li",{},"点击",[252,617,618],{},"创建",[613,620,621],{},"输入标题，例如“Sprint 42”。每个标题在每个空间中必须唯一。标题是必填项：如果字段为空或只包含空格，会被标记为错误，并提示计划会话的名称是必填项。",[613,623,624,625,628,629,632,633,636,637,639],{},"可选地添加描述和日程。",[252,626,627],{},"显示计时器","复选框默认已选中。清除它可隐藏日程并在没有计时器的情况下创建计划会话。选中时，选择",[252,630,631],{},"常规","标签页，在左侧设置开始日期和时间，在右侧设置 15、30、45、60、90 或 120 分钟的时长，全部位于一行，结束时间显示在时长下方。对话框会显示会话结束时间；当时长跨过午夜时，结束时间会移到第二天。选择",[252,634,635],{},"长时间","标签页，自行设置开始和结束日期及时间；开始位于一行左侧，结束位于右侧。你可以选择日期并输入任意时间；时间列表每 15 分钟提供一个建议，输入的时间始终会保留。允许过去日期和时间。对话框打开时已填好下一个半小时和 30 分钟。清除开始日期会恢复今天，清除结束日期会恢复开始日期之后的一天，清除时间会恢复下一个半小时，因此这些字段不会保持为空。结束时间必须晚于开始时间。标题为空或只包含空格时，",[252,638,618],{},"也会保持禁用。",[613,641,642,643,646,647,651,652,655,656,659,660,663],{},"可选地添加",[252,644,645],{},"视频\u002F屏幕共享","链接，例如 ",[648,649,650],"code",{},"https:\u002F\u002Fmeet.example.com\u002Fsprint-42","。链接必须是完整的地址，以 ",[648,653,654],{},"http:\u002F\u002F"," 或 ",[648,657,658],{},"https:\u002F\u002F"," 开头。当字段包含有效链接时，字段内会显示视频图标；点击图标即可在新标签页中打开链接。",[648,661,662],{},"meet.example.com\u002Fsprint-42"," 这类不完整的地址会被标记为错误，在你修正地址或清空字段之前不会保存。",[613,665,615,666,668],{},[252,667,618],{},"。对话框会立即关闭，新计划会话会立即出现在列表中。如果无法保存，它会被再次移除。",[11,670,671],{},"只有主持人可以创建计划会话。还没有会话时，主持人会看到创建第一个会话的提示，而非主持人会看到一条信息消息，说明空间管理员如何从空间设置权限标签页分配角色。每个计划会话显示为自己的标签页，新创建的会话会自动获得焦点。你最后打开的计划会话标签页会在当前浏览器标签页中记住，因此刷新后会回到该标签页。",[11,673,674,675,678,679,682,683,686],{},"相同的计划会话也会作为标签页显示在",[252,676,677],{},"容量规划","、",[252,680,681],{},"站会","和",[252,684,685],{},"回顾","标签页中。你选择的计划会话在这些标签页之间共享，因此切换标签页时仍会打开同一个会话。请参阅站会和冲刺回顾指南。",[11,688,689],{},"计划会话在最后一次更改后保留三个月（90 天），之后会自动移除。",[40,691,692],{"id":692},"编辑和删除",[11,694,695,696,699],{},"点击计划会话上的",[252,697,698],{},"编辑","以更改其标题、描述或日期范围。更改会无需刷新显示给查看空间估算页面的所有人。确认后对话框会立即关闭，更改会立即显示在列表中。如果更改无法保存，之前的值会恢复。 并显示一条消息说明无法保存计划会话。",[11,701,702,703,706,707,709,710,712,713,715,716,718,719,721],{},"标题是必填项：如果清除它，字段会被标记为错误，并提示计划会话的名称是必填项，且",[252,704,705],{},"应用","不会保存更改。日程与创建对话框有两个相同的标签页：",[252,708,631],{},"接受开始和时长，",[252,711,635],{},"接受开始和结束。以某个提供的时长保存的会话会在",[252,714,631],{},"标签页打开并选中该时长；其他长度会在",[252,717,635],{},"标签页打开。",[252,720,627],{},"复选框控制日程：清除它可移除计时器，而没有计时器的会话打开时该复选框处于清除状态。选中时，清除开始日期会恢复今天，清除结束日期会恢复开始日期之后的一天，清除时间会恢复下一个半小时，因此这些字段不会保持为空。结束时间必须晚于开始时间。时间列表每 15 分钟提供一个建议，你也可以输入任意时间。",[11,723,724,726,727,655,729,731],{},[252,725,645],{},"链接是可选项，规则与创建对话框相同：必须是完整的地址，以 ",[648,728,654],{},[648,730,658],{}," 开头；不符合的值会被标记为错误，对话框不会保存。清空字段即可移除链接。当计划会话有链接时，每个参与者标题栏都会在角色徽章之前显示一个红色的小视频图标。点击图标即可在新标签页中加入视频或屏幕共享会话。保存链接后图标会立即出现，无需刷新；清空链接后图标消失。",[11,733,734,735,737,738,741,742,745],{},"主持人也可以就地修改说明。在",[252,736,601],{},"标签页中，点击计划表格上方的说明，输入新文本，然后点击别处。没有",[252,739,740],{},"确定","或",[252,743,744],{},"取消","按钮：字段失去焦点时会保存，立即向所有人显示，如果保存失败则恢复为已保存的文本。没有说明的会话会显示可点击添加说明的占位文本。",[11,747,748,749,752,753,51],{},"没有单独的删除操作。要移除计划会话，请使用",[252,750,751],{},"删除","，它会在确认后永久移除该会话及其所有工作项。请参阅",[47,754,756],{"href":755},"#deleting-a-planning-session","删除计划会话",[40,758,759],{"id":759},"添加工作项",[11,761,762],{},"你可以通过两种方式向计划会话添加工作项。",[62,764,765],{"id":765},"从工作项视图",[11,767,768,769,772,773,775,776,779,780,783,784,786,787,789,790,792],{},"打开一个 Jira 工作项，打开 ",[252,770,771],{},"Scrumpy"," 面板，然后点击",[252,774,591],{},"。你也可以从工作项的",[252,777,778],{},"更多操作","（",[252,781,782],{},"...","）菜单中选择",[252,785,591],{},"来打开同一对话框。对话框会预选你在该空间上次使用的计划会话；当空间没有计划会话时，会改为选中",[252,788,618],{},"。选择另一个现有会话，或选择",[252,791,618],{},"以内联创建带标题和描述的会话；在添加工作项之前必须提供标题。一个工作项只能属于空间中的一个计划会话。如果它已在所选会话中，系统会告知你它已在那里。如果它在另一个会话中，系统会告知你是哪个会话，并且不会添加；请先从该会话中移除它。添加工作项后对话框会关闭。你打开的每个计划会话都会加载其工作项。切换到另一个会话会加载该会话一次，返回已打开的会话会立即显示其工作项。",[62,794,796],{"id":795},"从-jira-筛选器添加","从 Jira 筛选器添加",[11,798,615,799,802,803,805,806,809,810,813,814,816,817,819,820,822],{},[252,800,801],{},"从筛选器添加","，从已保存的 Jira 筛选器、冲刺或容量规划会话导入工作项。选择器以一个",[252,804,677],{},"分组开头，列出容量计划中至少有一个已计划工作项的计划会话。选择一个即可预览该容量会话各冲刺中的所有已计划工作项。如果空间有 Scrum 面板，选择器随后会显示一个列出活动和未来冲刺的",[252,807,808],{},"活跃冲刺","分组，以及一个每个 Scrum 面板一个条目的",[252,811,812],{},"待办事项","分组。",[252,815,808],{},"分组仅在空间至少有一个活动或未来冲刺时出现。",[252,818,812],{},"分组在空间有 Scrum 面板时始终出现，即使没有活动或计划中的冲刺；Kanban 空间不会显示这两个分组。选择一个冲刺即可预览其工作项，或在",[252,821,812],{},"下选择一个 Scrum 面板，以预览该面板中不在任何冲刺中的工作项。仅显示来自此空间的工作项。",[11,824,825,826,829,830,833,834,837],{},"在待办事项下方，选择器会在",[252,827,828],{},"面板","下列出空间的 Kanban 面板；选择一个即可预览该面板上的工作项。Scrum 面板不会列在那里，因为冲刺和待办事项条目已经覆盖了它们。 在冲刺下方，选择器将收藏的筛选器分组到",[252,831,832],{},"收藏","，你自己的筛选器分组到",[252,835,836],{},"我的筛选器","，共享筛选器分组到其所有者名称下；收藏的筛选器会显示星标。选择一个筛选器以预览其工作项，勾选你想要的工作项，然后添加它们。你可以在 Jira 筛选器页面上创建筛选器。计划会话只能包含来自其自身空间的工作项，因此来自另一个空间的任何工作项都无法添加。你也只能添加能在 Jira 中打开的工作项：对你隐藏的工作项不会进入会话，即使你知道它的键。",[11,839,840],{},"只有你能在 Jira 中打开的工作项才能添加。如果某个工作项被 Jira 问题级安全隐藏，Scrumpy 会拒绝添加，并且该工作项会从你的计划表格中省略。",[11,842,843],{},"在预览中你可以：",[845,846,847,850,853],"ul",{},[613,848,849],{},"勾选单个工作项，或使用标题复选框选择所有可选工作项。",[613,851,852],{},"通过拖动重新排列行。勾选的工作项会按预览显示的顺序添加。",[613,854,855],{},"查看类型、工作项、状态和摘要列。类型列显示工作项类型的图标，包括较新的类型和自定义类型。类型和工作项列标题及其所有单元格居中对齐。状态列中警告色的状态图标标记无法添加的工作项。将鼠标悬停在该图标上可查看原因：它不属于此空间、它已在此计划会话中，或它已在空间中的另一个计划会话中，工具提示会指出该会话。",[11,857,858,859,862],{},"在你至少选择一个工作项之前，",[252,860,861],{},"添加","会保持禁用。",[40,864,865],{"id":865},"管理工作项",[845,867,868,874,880],{},[613,869,870,873],{},[252,871,872],{},"拖放","：通过拖动行重新排列工作项（仅主持人）。所有人都会立即看到新顺序，无需刷新，视角行会保持在工作项下方。",[613,875,876,879],{},[252,877,878],{},"选择","：勾选复选框以选择工作项进行批量操作。",[613,881,882,885,886,889,890,893],{},[252,883,884],{},"高亮","：使用单选按钮选择一个工作项进行估算。它会加载到右侧的投票面板中，因此你可以直接从计划表格进行估算。未选择工作项时，右侧面板会显示计划会话侧边面板，其中包含用于未选择消息的",[252,887,888],{},"详情","标签页和用于计划会话聊天的",[252,891,892],{},"聊天","标签页。",[11,895,896],{},"计划表格中的类型和工作项列居中对齐。亲和度和圆点排名列出现时也居中对齐。",[62,898,899],{"id":899},"编辑模式",[11,901,902,903,905,906,909,910,913,914,917],{},"会话描述右侧的",[252,904,899],{},"下拉列表选择投票的驱动方式：",[252,907,908],{},"单个投票","（默认）或",[252,911,912],{},"批量投票","。主持人更改共享模式，它会立即对所有人显示，因此每位参与者都遵循相同模式。投票者也可以更改模式。该更改仅适用于该投票者，会取消勾选",[252,915,916],{},"锁定到主持人","，并在当前浏览器标签页中记住。再次勾选锁定会将下拉列表恢复为主持人的当前模式。主持人的模式会随计划会话保存。投票者的本地模式不会共享，也不会更改主持人看到的内容。",[11,919,920,921,923,924,926,927,51],{},"在",[252,922,899],{},"下拉列表右侧，应用切换按钮会在同一计划会话标签页中打开",[252,925,677],{},"。其工具提示显示",[252,928,929],{},"切换到容量规划",[62,931,932],{"id":932},"可见视角",[11,934,935,936,938,939,942],{},"视角下拉列表位于",[252,937,899],{},"下拉列表之前。它选择计划表格以列和批量投票中的行显示哪些视角，以及右侧投票面板中显示哪些视角标签页。仅当空间有多个视角时才显示。下拉列表为空时显示",[252,940,941],{},"所有视角","，这也是每个计划会话的默认值。",[11,944,945,946,948],{},"主持人会为所有人更改列表，且无需刷新即可更新。投票者可以为自己缩小列表。该更改会取消勾选",[252,947,916],{},"，并保留在当前浏览器标签页中。再次勾选锁定会恢复主持人的列表。访客始终跟随主持人的列表。",[11,950,951],{},"批量开始、暂停、继续、完成、重新开始、取消和接受操作只提供列表中的视角。如果主持人隐藏了右侧面板当前打开的视角，面板会回到高亮的工作项。你之后添加的视角会自动出现，直到有人缩小列表。",[62,953,954],{"id":954},"谁被高亮",[11,956,957,958,961],{},"主持人会为所有人选择高亮的工作项，所选行会显示黄色 ",[252,959,960],{},"M","，工具提示为“主持人当前选择的工作项”。",[11,963,964,965,967],{},"在批量模式下，主持人也可以选择某个视角行，这会为其打开替代投票。该选择也会共享，并替换任何所选工作项。其他参与者会在该视角行的第一列看到相同的黄色 ",[252,966,960],{},"，工具提示为“主持人当前选择的视角”。",[11,969,970,971,973],{},"所选视角也是内联投票面板的视角标签页，因此高亮工作项会打开该标签页。锁定到主持人的参与者会跟随主持人的标签页，并用黄色 ",[252,972,960],{}," 徽章标记，即使它与他们当前所在的标签页相同。徽章仅在主持人选择的工作项正是当前显示的工作项时显示；当未锁定的参与者聚焦另一个工作项时，它会隐藏。取消锁定时徽章仍然可见，因此你始终能看到主持人的位置。",[11,975,976,978,979,981,982,984,985,987,988,990,991,51],{},[252,977,960],{}," 也是主持人视图的指引。跟随主持人期间，你高亮的行和 ",[252,980,960],{}," 所在的行是同一行。当你自己选择一行时，高亮会移到那一行，而 ",[252,983,960],{}," 留在主持人的行上，因此你能看到自己偏离了多远。内联面板也是如此：你打开另一个标签页后，",[252,986,960],{}," 仍留在主持人的标签页上。跟随主持人也意味着主持人会替你切换标签页：",[252,989,916],{},"开启时，主持人打开的每个工作项和标签页都会为你打开。脱离只需一次点击：选择另一行、另一个标签页或另一种编辑模式，或者自己取消勾选",[252,992,916],{},[11,994,995,996,998,999,678,1001,678,1003,1005,1006,1008,1009,678,1012,678,1015,655,1018,1021],{},"默认情况下，其他参与者会跟随主持人的工作项选择、编辑模式和替代投票标签页。",[252,997,916],{},"复选框（默认开启）控制此行为。它是计划会话的一个设置，因此只要你留在计划标签页上就有效：",[252,1000,601],{},[252,1002,677],{},[252,1004,681],{}," 和 ",[252,1007,685],{},"。它还控制空间页面标签页：当主持人在这些标签页之间切换时，正在查看同一计划会话的已锁定参与者会转到同一标签页并保持锁定。当你自己切换这些标签页时，复选框会被清除，因此你在新标签页中处于脱离状态。切换到 ",[252,1010,1011],{},"入门指南",[252,1013,1014],{},"教程",[252,1016,1017],{},"投票会话",[252,1019,1020],{},"仪表板"," 再返回不会清除它。",[11,1023,1024],{},"如果你自己选择一行、切换编辑模式或打开另一个替代投票标签页，锁定会关闭。锁定会在此浏览器标签页中记住，只要你留在该标签页上。你的本地选择会保留在你做出选择时所处的标签页中。清除锁定会让右侧面板停留在你跟随的标签页上；它不会跳回你先前打开的标签页。你的本地选择会在刷新后保留，但不会与任何人共享，也不会更改主持人看到的内容。",[11,1026,1027],{},"再次打开锁定即可重新跟随主持人；编辑模式下拉列表和替代投票标签页随后会回到主持人的当前选择。",[62,1029,1030],{"id":1030},"批量操作",[11,1032,1033,1034,1037,1038,1040],{},"表格下方，一个",[252,1035,1036],{},"视角","选择器（在你至少勾选一个工作项之前禁用）选择会话操作应用于哪个视角，后面是仅图标操作。打开的列表以一个无法选择的",[252,1039,1036],{},"标题开头。每个操作都有一个工具提示，说明它应用于所选工作项。所选视角和勾选的工作项会在当前浏览器标签页中记住，因此刷新后会恢复它们。",[1042,1043,1044,1057],"table",{},[1045,1046,1047],"thead",{},[1048,1049,1050,1054],"tr",{},[1051,1052,1053],"th",{},"操作",[1051,1055,1056],{},"作用",[1058,1059,1060,1071,1081,1091,1104,1114,1123,1133],"tbody",{},[1048,1061,1062,1068],{},[1063,1064,1065],"td",{},[252,1066,1067],{},"开始",[1063,1069,1070],{},"为所选视角中勾选的工作项打开投票会话",[1048,1072,1073,1078],{},[1063,1074,1075],{},[252,1076,1077],{},"暂停",[1063,1079,1080],{},"暂停它们已开始的会话。已暂停的会话会被跳过，启用异步投票的视角也会被跳过，因为其会话无法暂停",[1048,1082,1083,1088],{},[1063,1084,1085],{},[252,1086,1087],{},"继续",[1063,1089,1090],{},"继续它们已暂停的会话。启用异步投票的视角会被跳过，因为其会话无法继续",[1048,1092,1093,1098],{},[1063,1094,1095],{},[252,1096,1097],{},"完成",[1063,1099,1100,1101,1103],{},"完成它们已开始的会话。没有投票（没有真实估算）的会话会被取消，与投票面板的",[252,1102,1097],{},"按钮一致。仅使用额外表情卡片投出的票会被视为没有投票",[1048,1105,1106,1111],{},[1063,1107,1108],{},[252,1109,1110],{},"重新开始",[1063,1112,1113],{},"就地重新开始它们已完成的会话。新一轮会立即使用已配置的必需投票者开始，已完成的结果及其投票会被丢弃。工作项会在该视角的排名中保留其位置",[1048,1115,1116,1120],{},[1063,1117,1118],{},[252,1119,744],{},[1063,1121,1122],{},"取消它们的投票会话，包括已完成的会话",[1048,1124,1125,1130],{},[1063,1126,1127],{},[252,1128,1129],{},"接受",[1063,1131,1132],{},"接受它们已完成的会话，并将估算写入 Jira。估算会立即出现在视角列中。如果 Jira 写入失败，会话和列会回到之前的状态，错误对话框会解释原因",[1048,1134,1135,1140],{},[1063,1136,1137],{},[252,1138,1139],{},"移除",[1063,1141,1142],{},"从计划会话中移除勾选的工作项",[11,1144,1145,1146,1148,1149,1151,1152,1154,1155,1157,1158,1160,1161,1163,1164,1166,1167,1169],{},"当没有勾选的工作项适用时，操作会禁用：所有会话都已开始时禁用",[252,1147,1067],{},"；没有活动会话或视角使用异步投票时禁用",[252,1150,1077],{},"；没有已暂停的会话或视角使用异步投票时禁用",[252,1153,1087],{},"；没有已开始的会话时禁用",[252,1156,1097],{},"；没有已完成的会话时禁用",[252,1159,1110],{},"；没有勾选项有会话时禁用",[252,1162,744],{},"；没有已完成会话时禁用",[252,1165,1129],{},"；在勾选任何内容之前禁用",[252,1168,1139],{},"。移除高亮的工作项会清除高亮。",[11,1171,1172],{},"每个操作都会立即在表格中生效。行会立即被添加、暂停、继续、完成、重新开始或移除，按钮会根据这些更新后的行启用或禁用，因此同一操作不能执行两次。没有加载指示器。右侧的内联投票面板会在同一时刻变化，在面板中进行的投票或会话操作也会在同一时刻更新表格行。你无需等待刷新即可看到另一侧追上进度。如果更改无法保存，表格和面板都会回到之前的状态。",[11,1174,1175],{},"拖动或批量移除后，表格会立即更新。更改会在后台确认，如果写入失败，之前的顺序会恢复。",[40,1177,912],{"id":912},[11,1179,1180,1181,1183,1184,1186,1187,1189,1190,1192],{},"任何人都可以将",[252,1182,899],{},"从",[252,1185,908],{},"切换为",[252,1188,912],{},"。主持人更改共享模式，投票者在本地切换。在批量模式下，计划表格保留所有行和按钮，其视角单元格变为投票控件，因此描述、",[252,1191,899],{},"下拉列表、按钮、进度条和估算面板都会保持在原位。",[11,1194,1195],{},"仅当工作项在该视角中有已开始的会话时，视角单元格才会显示投票控件：",[845,1197,1198,1205,1208],{},[613,1199,1200,1201,1204],{},"卡组卡片的可清除下拉列表（例如“2 sp”或“XXL”），额外卡片分组在",[252,1202,1203],{},"额外卡片","标题下，并预选你的当前投票。",[613,1206,1207],{},"自由标度视角使用受视角最小值和最大值限制的数字字段。该字段始终在数字后显示“sp”后缀。当视角将故事点转换为时长时，它还会在后缀旁显示短时长，例如“1d 4h”。清除字段会移除投票，将工作项的原始估算恢复为字段值，并将字段标记为需要投票。清除控件始终可见，并且在字段有值之前处于禁用状态。",[613,1209,1210,1211,1214,1215,1217,1218,1220],{},"Parametric 结果显示在带“sp”后缀的只读数字字段中，并带有紧凑的撤回控件，以及后缀区域内一个紧凑的编辑投票控件。当你尚未投票时，如果工作项的当前估算是数字，字段会显示该估算，并标记为需要投票。打开编辑控件会计算当前结果，并使用视角公式和弹出窗口中的参数值立即将其显示在字段中。弹出窗口为每个参数提供一个紧凑数字字段，以参数名称标注，并受其最小值和最大值限制，参数下方有一个居中的主要",[252,1212,1213],{},"投票","按钮。更改参数会立即更新字段中的值。弹出窗口打开时编辑控件隐藏，关闭后恢复。",[252,1216,1213],{},"会关闭弹出窗口并投出结果。点击弹出窗口外部会在不保存的情况下关闭它，并恢复之前的投票；如果之前没有投票，则回到空的错误字段。当已有投票且你未更改参数时，",[252,1219,1213],{},"保持禁用。按撤回控件可立即移除当前 Parametric 投票。字段会再次显示工作项的原始估算并标记为需要投票，撤回控件和“sp”后缀在撤回控件禁用时仍保持可见。仅当估算目标写入时间值时（时间面板或时间字段），才会显示转换后的时长和更宽的字段。数字字段针对故事点和时长的每种组合具有固定宽度，因此列会对齐，输入时字段大小不会变化。数字面板或故事点字段只显示故事点，视角设置会说明不会写入时长。Scrumpy 会记住你在当前投票会话中最后使用的参数值，并在你重新打开编辑器时恢复它们。它还会根据投票记录的参数位置打开，即使你是在投票面板中投的票，因此两个位置始终显示相同位置。新的投票会话会再次从每个滑块的中间开始。你尚未用于投票的位置只保存在浏览器中的当前打开页面里，不会随投票保存。",[11,1222,1223],{},"当会话处于活动状态且未暂停时，投票控件旁边会有一个紧凑的暂停控件，高度相同。按下它会暂停该工作项的投票会话，并立即隐藏该控件。如果暂停失败，控件会恢复。已暂停的会话或异步投票不会显示暂停控件。",[11,1225,1226,1227,1229],{},"更改控件会为该工作项和视角投出你的票。值会立即显示，并在保存期间保持原位，包括公开投票关闭时。如果保存失败，控件会回到你之前的投票。在自由标度字段中，输入数字后点击别处即可保存。清除下拉列表（或清空数字字段）会移除你的投票，与再次点击同一张投票卡片完全相同。Parametric 不同：打开编辑器会在单元格中显示计算结果，编辑字段只会更新该预览，而弹出窗口中的",[252,1228,1213],{},"按钮会投出结果。当会话完成或取消时，其投票控件会消失，单元格会回到通常状态或估算。",[11,1231,1232,1233,1235,1236,1238,1239,1242,1243,1246],{},"在你于某个单元格中投票之前，控件会将工作项的当前估算显示为占位符，没有估算时显示",[252,1234,1213],{},"，并且控件标记为需要投票。选择值会清除该提示。自由标度和 Parametric 单元格会在你投票之前于字段中显示原始数字估算。在 Parametric 单元格中，打开编辑器会用计算结果替换该估算，即使在你第一次投票之前也是如此；未按",[252,1237,1213],{},"就关闭会恢复之前的投票或原始估算及其红色错误状态。当当前估算以时间值存储时（时间面板或时间字段），批量编辑器会使用",[252,1240,1241],{},"故事点转小时","系数将其转换回故事点，因此 20 小时的估算会在编辑故事点的字段中显示为 ",[252,1244,1245],{},"2.5","；Parametric 编辑器还会在值旁保留 20 小时的时长。",[62,1248,1249],{"id":1249},"视角行和排名列",[11,1251,1252],{},"在批量模式下，表格还会在工作项下方为每个视角列出一个可选行。自由标度视角显示亲和度、圆点和分桶标签页：分桶标签页按估算值从小到大列出工作项，不同估算之间有一个间隔行，因为没有卡片可供工作项拖放。Parametric 视角也显示亲和度、圆点和分桶标签页：其分桶标签页列出相同的估算，但投票通过滑块而不是字段编辑。每一行都有一个复选框、一个用于选择该行进行替代投票的单选按钮，以及视角名称。这些行始终保持在底部：不能拖动，也不能将工作项拖放到它们上面或下方。",[11,1254,1255,1256,1259,1260,1263,1264,682,1266,1268,1269,1272,1273,1276],{},"当视角有排名时，其行会向所有人显示常规的",[252,1257,1258],{},"亲和度","徽章和常规的",[252,1261,1262],{},"圆点","徽章，每个已有排名各显示一个。没有排名的视角不显示徽章。排名从",[252,1265,1258],{},[252,1267,1262],{},"面板中清除：亲和度的",[252,1270,1271],{},"清除排名","删除图标只清除亲和度，圆点的图标只清除圆点。如果清除的排名是分桶表格的强制排名，分桶排名模式也会回到",[252,1274,1275],{},"无排名","。排名会立即消失；如果清除无法保存，它们会恢复。",[11,1278,1279],{},"具有亲和度排名的视角后面会跟一个亲和度排名列，具有圆点排名的视角后面会跟一个圆点排名列，每个列在该排名存在时显示。每个工作项的值是一个徽章：其亲和度位置，或其圆点数量（没有圆点时显示 0）。排名列标题和徽章居中对齐。",[40,1281,1282],{"id":1282},"替代投票",[11,1284,1285],{},"选择视角行会在工作项投票面板的位置打开该视角的替代投票。视角行和工作项行不能同时选中：选择视角行会清除所选工作项。",[11,1287,1288,1289,741,1291,1294,1295,1297,1298,678,1300,741,1302,1305],{},"你最后在替代投票中打开的视角以及",[252,1290,1213],{},[252,1292,1293],{},"结果","子标签页会在当前浏览器标签页中记住。",[252,1296,916],{},"开启时，外部标签页（",[252,1299,1258],{},[252,1301,1262],{},[252,1303,1304],{},"分桶","）会跟随主持人的当前标签页。主持人的标签页会随计划会话保存，并立即对所有人显示。",[11,1307,1308,1309,1311],{},"当主持人打开同一视角时，黄色 ",[252,1310,960],{}," 徽章会标记主持人正在查看的标签页，即使它就是你当前所在的标签页。当主持人选择了某个工作项或另一个视角时，它会隐藏。如果你点击另一个标签页，锁定会关闭。再次点击主持人的标签页不会更改锁定。勾选锁定会回到主持人的标签页。",[11,1313,1314,1315,678,1317,682,1319,1321,1322,1325,1326,1328],{},"面板有三个标签页：",[252,1316,1258],{},[252,1318,1262],{},[252,1320,1304],{},"。每个标签页都会以粗体显示视角标题、其描述，以及表格上方的设置齿轮链接。三个标签页都会列出适用于该视角且具有活动、已暂停或已完成投票会话的工作项。当工作项的会话被取消或接受时，它会离开这些面板。每个表格在",[252,1323,1324],{},"工作项","列之后都有一个锁定列。其标题显示锁定的挂锁。完全锁定的面板会在每个工作项上显示锁定图标。无法移动的单个工作项（例如分桶表格中的已完成会话）会显示锁定的挂锁图标。在",[252,1327,1304],{},"标签页右侧，面板显示与投票面板相同的角色徽章和声音铃铛：徽章链接到权限设置，铃铛切换声音通知。",[11,1330,1331],{},"在每个标签页中，将鼠标悬停在工作项键上会显示其 Jira 摘要，与计划表格使用的工具提示相同。摘要来自计划表格已加载的内容，因此切换标签页不会再次读取 Jira。如果摘要不可用，键会显示但没有工具提示。",[11,1333,1334],{},"取消或接受工作项的投票会话会将其从该视角的两个排名以及亲和度、圆点和分桶面板中移除。为工作项启动新会话会将其重新添加为未排名，位于亲和度顺序的末尾且没有圆点。",[62,1336,1258],{"id":1258},[11,1338,1339,1340,682,1342,1344,1345,1347,1348,1350,1351,1353,1354,1357],{},"亲和度对工作项进行排名。它有两个子标签页：",[252,1341,1213],{},[252,1343,1293],{},"：",[252,1346,1213],{},"包含表格和所有控件，",[252,1349,1293],{},"显示排名的条形图。每位参与者都能看到",[252,1352,1293],{},"，无论",[252,1355,1356],{},"公开投票","是否开启。",[11,1359,1360,1361,1364,1365,1368,1369,1371],{},"在视角标题右侧，主持人设置排名算法：",[252,1362,1363],{},"平均排名","（对参与者的排名取平均）或",[252,1366,1367],{},"中位数排名","（使用其位置的中间值）。只有主持人可以更改，且选择会实时共享。如果更改被拒绝，选择器会回到最后保存的算法。如果强制排名为",[252,1370,1258],{},"且分桶面板有投票或已完成会话，亲和度表格会锁定：你不能重新排名、撤回或更改算法，锁定列会在每个工作项上显示锁定图标。另一个排名保持可编辑。",[11,1373,1374],{},"在投票标签页中，只有投票者可以拖动，表格对其他所有人只读。拖动行以更改其位置。表格上方的简短提示会提醒投票者拖动工作项；一旦你移动一行，它就会为你消失，无需等待保存。计划表格中的亲和度排名列会立即跟随你的移动，因此那里的排名绝不会落后于你正在拖动的表格。",[11,1376,1377],{},"表格显示以下列：",[1042,1379,1380,1390],{},[1045,1381,1382],{},[1048,1383,1384,1387],{},[1051,1385,1386],{},"列",[1051,1388,1389],{},"含义",[1058,1391,1392,1402,1411,1421,1431],{},[1048,1393,1394,1399],{},[1063,1395,1396],{},[252,1397,1398],{},"类型",[1063,1400,1401],{},"工作项类型的图标，包括较新的类型和自定义类型",[1048,1403,1404,1408],{},[1063,1405,1406],{},[252,1407,1324],{},[1063,1409,1410],{},"工作项键",[1048,1412,1413,1418],{},[1063,1414,1415],{},[252,1416,1417],{},"我的排名",[1063,1419,1420],{},"你自己的位置（顶行为 1），以普通徽章显示",[1048,1422,1423,1428],{},[1063,1424,1425],{},[252,1426,1427],{},"偏差",[1063,1429,1430],{},"你的排名与组排名之间的差距（你的排名减组排名），以带符号数字显示。低于 1 为普通徽章，低于 2 为黄色，其他情况为红色",[1048,1432,1433,1438],{},[1063,1434,1435],{},[252,1436,1437],{},"排名",[1063,1439,1440],{},"工作项的共享位置（1 为最佳），使用所选算法计算。标题和单元格右对齐",[11,1442,1443,1444,682,1446,1448],{},"在你提交排名之前，",[252,1445,1417],{},[252,1447,1427],{},"单元格保持为空。它们会在你排名时填入，并在撤回时再次清除。",[11,1450,1451],{},"类型、工作项、我的排名和偏差列标题及其所有单元格居中对齐。每个显示的工作项都会参与，即使没有人重新排列它。",[11,1453,1454],{},"你的排名会在拖动时保存并实时共享，因此其他参与者会看到新顺序。你自己的顺序会按计划会话和视角记住，因此刷新后会恢复，并且也会跟随你进入其他打开的窗口。",[11,1456,1457,1458,1461,1462,1464,1465,1467,1468,51],{},"表格下方，你会看到已提交排名的参与者。参与者分组会在你排名或撤回时立即更新，无需等待服务器。投票者可以使用",[252,1459,1460],{},"撤回","撤回自己的排名，这会将表格恢复为工作项顺序，并立即从共识中移除其排名。主持人可以使用",[252,1463,1271],{},"删除图标清除所有亲和度排名，该图标对主持人显示，并在存在排名之前禁用。参与者行在有人排名后出现，而",[252,1466,1271],{},"图标保持可见并变为启用。图标上的工具提示说明它会删除所有用户的排名。如果亲和度是强制排名，清除它还会将分桶排名模式恢复为",[252,1469,1275],{},[11,1471,1472,1473,1476,1477,1479,1480,1482],{},"主持人还可以将共享排名发送到 Jira。",[252,1474,1475],{},"同步到 Jira"," 转换图标位于",[252,1478,1460],{},"之后、",[252,1481,1271],{},"之前，只有主持人能看到它。",[845,1484,1485],{},[613,1486,1487,1489],{},[252,1488,1475],{}," 会按共享排名顺序对列出的工作项在 Jira 中排名。Scrumpy 使用你打开空间页面时所从面板上配置的排名字段。如果 Jira 未报告面板，或面板未配置排名字段，则使用 Jira 的默认排名字段。排名为 1 的工作项在 Jira 中保持原位，其他列出的工作项按排名顺序跟随它，因此列出的工作项形成一个排名块，而空间中的其他工作保持其位置。",[11,1491,1492],{},"图标在运行时显示加载指示器。将鼠标悬停在图标上会看到一条说明，按下它会将亲和度排名与 Jira 排名同步。如果 Jira 拒绝更改，控件下方会显示错误，你可以重试。要使其工作，Jira 必须允许你对工作项排名。",[11,1494,1495,1497],{},[252,1496,1293],{},"标签页显示每个工作项位置的条形图，最佳在顶部。它是只读的。",[62,1499,1262],{"id":1262},[11,1501,1502,1503,682,1505,1344,1507,1509,1510,1512,1513,1353,1515,1357],{},"圆点按圆点对工作项进行排名。它有两个子标签页：",[252,1504,1213],{},[252,1506,1293],{},[252,1508,1213],{},"包含表格和控件，",[252,1511,1293],{},"显示每个工作项总圆点数的水平条形图，最低在顶部，没有控件。每位参与者都能看到",[252,1514,1293],{},[252,1516,1356],{},[11,1518,1519,1520,1522],{},"主持人在表格下方设置圆点预算。每位参与者的预算在 1 到工作项数量之间，因为每位参与者只能给一个工作项一个圆点。共享预算没有上限：它可以是任何至少等于已放置圆点数的数字。如果强制排名为",[252,1521,1262],{},"且分桶面板有投票或已完成会话，圆点表格会锁定：你不能放置或移除圆点，也不能撤回，锁定列会在每个工作项上显示锁定图标。另一个排名保持可编辑。",[11,1524,1525,1526,1529],{},"勾选",[252,1527,1528],{},"在参与者之间共享此预算","可使其成为一个共享池，先到先得。预算默认不共享，因此每位参与者获得完整预算。所有人看到相同的预算；非主持人只能看到剩余多少圆点。",[11,1531,1532],{},"你自己的预算更改会立即显示；如果服务器拒绝，数字字段和共享复选框会回到最后保存的值。如果你快速更改数字，字段会保留你的最新值，而不会闪回到较早的值。延迟更新绝不会替换更新的预算，预算更改和排名更改也不会互相覆盖。如果你切换到低于已给出圆点数的共享预算，所有圆点排名都会重置，并会出现一条可忽略的消息说明原因。",[11,1534,1535],{},"每个工作项每位参与者最多只能有一个圆点。点击未投票行的圆点会消耗你的一个圆点，点击已有圆点的行会归还该圆点。",[11,1537,1538],{},"表格显示类型、工作项、圆点和排名列。没有列可排序，行也不能拖动。类型、工作项和圆点列标题及单元格居中对齐，圆点标题显示中等笔画粗细的圆点图标而不是文字。排名标题和单元格右对齐。类型、工作项和排名列使用计划表格的最小宽度：",[845,1540,1541,1546,1551,1556],{},[613,1542,1543,1545],{},[252,1544,1262],{},"包含一个带圆点图标的小按钮。点击它放置你的圆点，再次点击将其移除并将圆点归还预算。当你的预算为空且工作项没有圆点时，它会被禁用。",[613,1547,1548,1550],{},[252,1549,1437],{},"是工作项在所有参与者中获得的总圆点数。",[613,1552,1553,1555],{},[252,1554,1460],{},"会清除你的圆点并归还你的全部预算。",[613,1557,1558,1476,1560,1562],{},[252,1559,1475],{},[252,1561,1460],{},"旁边，对每位参与者（包括非主持人）可用，并且只要至少列出一个工作项就保持启用。它会将你的 Jira 投票添加到你在本面板中给过圆点的每个工作项，并从你没有给过圆点的每个工作项中移除你的 Jira 投票。按钮在运行时显示加载指示器。将鼠标悬停在按钮上会看到一条说明，按下它会将你的圆点投票与 Jira 投票同步。如果 Jira 拒绝投票，控件下方会显示错误，你可以重试。要使其工作，Jira 必须允许用户对问题投票。",[11,1564,1565],{},"表格上方的简短提示会提醒投票者放置圆点；一旦你放置第一个圆点，它就会为你消失，无需等待保存。计划表格中的圆点排名列会立即跟随每个圆点，因此那里的计数绝不会落后于你放置的圆点。如果在你的圆点到达服务器时共享池已被其他参与者用完，该圆点不会被保留：它会从表格中消失，你的圆点会回到最后保存的选择，并会出现一条说明共享圆点预算已用尽的可忽略信息消息来取代提示。",[11,1567,1568],{},"数字字段不能设置低于已给出的圆点数：其最小值是圆点最多的参与者已给出的圆点数，或在预算共享时为整个已放置池。切换到低于已放置圆点数的共享预算会改为重置所有圆点排名。",[11,1570,1571],{},"剩余圆点显示在一个按剩余数量着色的徽章中：超过一半为灰色，超过四分之一为黄色，其他情况为红色。",[11,1573,1574,1575,1577,1578,1580,1581,1276],{},"主持人可以使用",[252,1576,1460],{},"旁边的",[252,1579,1271],{},"删除图标清除所有圆点排名，该图标对主持人显示，在没有可见圆点排名时禁用。图标上的工具提示说明它会删除所有用户的排名。图标会立即跟随你的本地圆点：放置圆点后就会启用，移除最后一个圆点后会再次禁用，早于保存到达服务器。如果圆点是强制排名，清除圆点排名（包括切换到共享预算时的重置）也会将分桶排名模式恢复为",[252,1582,1275],{},[11,1584,1585],{},"给某个工作项放过圆点的参与者会显示在表格下方，该行在有人放置圆点之前也会保留位置，因此第一个圆点出现时预算控件和描述不会移动。分组会在你放置或撤回圆点时立即更新，无需等待服务器。",[62,1587,1304],{"id":1304},[11,1589,1590,1591,1594,1595,1597],{},"分桶将工作项作为桶分组到卡片下方。仅显示视角启用的卡片：其序列的活动卡片加上已启用的额外卡片。顶部的",[252,1592,1593],{},"无估算","行包含你在本会话中尚未投票的工作项。",[252,1596,1213],{},"标签页中表格上方的简短提示会提醒投票者将工作项拖到卡片下方；在你第一次拖放后，它会为你消失。",[11,1599,1600,1601,682,1603,51,1605,1607,1608,1610,1611,1613,1614,1616],{},"分桶面板在视角描述下方有两个标签页：",[252,1602,1213],{},[252,1604,1293],{},[252,1606,1213],{},"包含表格及其提示。",[252,1609,1293],{},"显示投票热图，每位参与者都能看到该标签页，无论",[252,1612,1356],{},"是否开启。投票者分组、",[252,1615,1460],{},"按钮和描述保持在标签页下方，因此切换标签页时它们不会移动。",[11,1618,1619,1620,1622,1623,1625,1626,1628,1629,1631,1632,1634],{},"已完成的会话会在表格中保留你记录的投票，因此其工作项会留在其卡片下方，直到会话被取消或接受。当视角有强制排名且分桶面板中至少有一个投票会话已完成时，分桶投票会锁定：你不能拖动工作项或使用",[252,1621,1460],{},"，排名选择器只允许",[252,1624,1275],{},"。消息会解释锁定原因。当分桶面板未完全锁定时，已完成的会话也不能移动或重新估算。取消或接受已完成的会话以解锁它们。你在本会话中投过票的工作项会从匹配你投票的卡片下方开始；会话之前存储的投票不会影响它开始的位置。当你的投票到达时，工作项会无需拖动移动到其卡片下方，移除投票会将其回到“无估算”。将工作项拖到卡片行下方即可为该卡片投票，将其拖放到",[252,1627,1593],{},"下方即可清除投票。移动会立即显示并在后台保存。如果保存失败，工作项会回到拖放前所在的卡片。投票者可以使用投票者分组下方的",[252,1630,1460],{},"撤回其在本面板中为工作项投出的所有投票。工作项会立即回到",[252,1633,1593],{},"，当投票者在面板中没有剩余投票时，按钮会被禁用。",[11,1636,1637,1638,1640],{},"每个卡片行在类型列中显示高 32 像素的卡片图像，在工作项列中以粗体显示其标签（故事点带“ sp”后缀，T恤尺码显示其尺码），并在参与者列中以左对齐的常规文本显示卡片名称（配置的标题，或内置趣味标题，例如 1 sp 的“举手之劳”）。类型和工作项列标题以及这些列中的每个单元格居中对齐。当视角写入时间值时，卡片标签下方会有一小行居中的时长。T恤卡片还会在那里显示其映射的故事点，例如“3 sp · 2 天”；它只显示视角写入的单位。两者都不写入时，不显示小字。",[252,1639,1593],{},"行在类型列中显示待办事项图标，居中对齐，且没有文本标签。卡片行和无估算行会高亮，不能拖动。参与者列还显示每个工作项的投票进度，例如“33% 或 3 票中的 1 票。”。表格下方的参与者行在有人投票之前也会保留位置，因此第一个投票出现时其下方的描述不会移动。投票者分组会在你投票或撤回时立即更新，无需等待服务器。",[11,1642,1643,1645,1646,1648,1649,1651],{},[252,1644,1293],{},"标签页显示每个工作项和估算的投票热图。每一列是一张已启用的卡片，每一行是一个工作项，当更多参与者为同一工作项的同一卡片投票时，单元格颜色会从警告色变为错误色。单元格中的数字是投票数。热图会拉伸到分桶面板的完整宽度。",[252,1647,1356],{},"开启时，它会统计每位参与者的投票。",[252,1650,1356],{},"关闭时，它会统计你自己的投票以及已完成会话的所有投票；其余投票会保持隐藏，直到其会话完成。主持人看到与其他所有人相同的范围。",[11,1653,1654,1655,1657,1658,741,1661,1664,1665,682,1667,1669],{},"主持人从视角标题旁的控制项设置分桶表格的排名模式：",[252,1656,1275],{},"（默认，普通表格）、",[252,1659,1660],{},"亲和度排名",[252,1662,1663],{},"圆点排名","。只有主持人可以更改，且当有人提交该排名后，排名选项才可用。普通表格没有排名列。",[252,1666,1660],{},[252,1668,1663],{},"会在右侧添加一个排名列，其中每个工作项以常规标签显示其排名，而卡片行会在该单元格留空。",[11,1671,1672],{},"选择会保存在计划会话上，并适用于所有人。如果更改被拒绝，选择器会回到最后保存的模式。",[11,1674,1183,1675,1677,1678,741,1680,1682,1683,1685,1686,1688,1689,1691],{},[252,1676,1275],{},"切换到",[252,1679,1660],{},[252,1681,1663],{},"，或在两种排名模式之间切换，会在服务器响应之前立即将每个列出的工作项移动到",[252,1684,1593],{},"。如果更改被拒绝，之前的模式和投票会恢复。切换回",[252,1687,1275],{},"会保留投票。如果强制排名的最后一个会话被取消或接受，分桶排名模式会自动回到",[252,1690,1275],{},"。已完成的会话会保持强制排名并锁定它，直到该会话被取消或接受。",[11,1693,1694],{},"当强制应用排名时，计划会话标签页会在单个投票和批量投票中的表格上方显示一条可忽略的信息消息。问题视图中的单个投票面板会在卡片上方显示相同的消息。在这两个位置，投票都会移动必须遵循排名顺序的工作项，因此顺序永远不会被破坏。与已投票项排名相同的工作项永远不会被拉动或推挤；只有排名不同的工作项会移动。",[11,1696,1697],{},"如果投票更改了多个投票会话，消息会被一条警告样式的可忽略消息取代，列出受影响的工作项。每个工作项都会打开其 Jira 问题视图。投票面板和批量投票控件各自保留自己的消息。",[11,1699,1700],{},"当强制排名已有记录的排名时，信息消息会在两个位置保持可见，并在排名清除后消失。受影响工作项消息仍会在投票更改多个会话时出现，即使排名已清除。",[11,1702,1703,1704,1706,1707,1709,1710,51],{},"一旦强制排名在分桶表格中至少有一个投票或已完成会话，该排名就会锁定，因此投票及其顺序不会被扰乱。亲和度强制排名会锁定亲和度表格中的拖放，并使其算法选择器只读；圆点强制排名会禁用圆点列和",[252,1705,1460],{},"按钮。已完成的会话还会锁定分桶投票，并只允许排名选择器切换到",[252,1708,1275],{},"。受影响的标签页会出现提示，另一个排名标签页保持可编辑。切换到强制排名或在强制排名之间切换会清除投票；对于已完成的会话，只允许切换到",[252,1711,1275],{},[11,1713,1714,1715,1717],{},"在排名视图中，工作项从最佳到最差列出，每一行显示",[252,1716,1437],{},"列。排名相同的工作项可以在同一卡片或“无估算”组内自由重新排序，但卡片行永远不会移动，并保持其配置顺序。“无估算”工作项保持在顶部的“无估算”组中。在同一卡片或“无估算”内重新排序不能跨越排名边界：你不能将工作项拖到排名更好的工作项下方，或拖到排名更差的工作项上方。被拒绝的重新排序会弹回，并且不会投出任何票。将工作项拖到不同卡片下方是卡片分配：同样的推动和拉动适用，因此最终工作项顺序保持按排名排序，其他一串工作项也可以移动到该卡片下方。与拖动项排名相同的工作项永远不会被拉动或推挤；只有拖动项会在其排名同侪中更改卡片。排名标题和单元格右对齐。Scrumpy 会一起估算落到卡片下方的每个工作项，而不仅是你拖动的那个，因此它们都会获得该卡片的估算。自由标度视角遵循相同规则，只是用估算值代替卡片：强制应用排名时，更改估算也会将从估算字段、单个投票面板和计划表格批量字段中经过更改的工作项移动到新估算，因此排名顺序保持完整。即使视角还启用了额外卡片也是如此，因为数字估算始终遵循估算规则。",[62,1719,1720],{"id":1720},"自由标度分桶",[11,1722,1723,1724,1726,1727,1729,1730,1732,1733,1735],{},"自由标度视角没有卡片，因此其分桶标签页用间隔行代替卡片行。已完成的会话会保留你记录的投票，因此其工作项会保持在其估算值处，而不会移动到",[252,1725,1593],{},"，直到会话被取消或接受。已完成的会话不能移动或重新估算。当强制应用排名且存在已完成会话时，每个自由标度估算字段都会禁用，锁定列会在每个工作项上显示锁定图标。",[252,1728,1213],{},"标签页按估算值从小到大列出工作项。估算相同的工作项放在一起，它们之间没有间隔行。两个不同估算之间的高亮间隔行显示距离，例如“3 sp 间隔”。其高度相对于表格中的其他间隔行：存在的最小间隔高 21 像素，存在的最大间隔高 90 像素，中间的任何间隔按比例缩放，因此间隔为 4 sp、5 sp 和 6 sp 的表格仍会显示 21 像素、56 像素和 90 像素。只有一个间隔或间隔大小相同的表格中的每个间隔行都保持 21 像素高度。没有故事点投票的工作项位于顶部高亮的",[252,1731,1593],{},"组中。一个窄的第一列绘制故事点时间线。它没有标签：一条 4 像素线从第一个工作项的圆点开始，到最后一个工作项的圆点结束，每个有估算的工作项行上有一个 12 像素圆点，第一个和最后一个已估算工作项有一个 16 像素圆点，中心有 4 像素空心，用来闭合时间线。当视角写入时间值时，每个估算字段会在故事点下方以小字居中显示人性化时长。",[252,1734,1593],{},"组没有圆点也没有线，因此没有估算的工作项永远不会在时间线上显示圆圈。间隔行没有圆点、没有垂直内边距或外边距，它们的时间线段绘制为 4 像素方块、4 像素间隙的点线，并保持其高度以显示估算之间的距离。",[11,1737,1738,1739,1741,1742,1744,1745,1747,1748,1750],{},"每个工作项行显示其 Jira 键、一个紧凑的故事点字段，以及所选排名模式中的",[252,1740,1437],{},"列。在字段中输入并点击别处即可保存精确估算。强制应用排名时，更改估算会保持升序排名顺序：经过更改的工作项会采用新估算并加入该估算组，排名相同的工作项保持原位，撤回估算还会清除其上排名更好的已估算工作项，就像将卡片拖入“无估算”一样。字段内的叉圆",[252,1743,1460],{},"按钮可清除该投票而无需编辑数字。将工作项拖入间隔可将其估算设置为两个相邻估算的舍入中点，拖到另一个工作项上可赋予相同估算，或拖入",[252,1746,1593],{},"以撤回投票。移动会立即显示并在后台保存；如果保存失败，行会回到之前的估算。投票者可以使用投票者分组下方的",[252,1749,1460],{},"撤回面板中的所有投票。描述保持在标签页下方。",[11,1752,1753,1755,1756,51,1758,1760,1761,1763],{},[252,1754,1293],{},"标签页在图表中显示记录的投票：横轴是故事点，每个工作项有自己的行，每张投票都是该工作项颜色中的一个圆点。同一故事点上的投票会展开，以便保持可见。轴标签是整数故事点。虚线十字标记每个工作项行上视角的平均故事点，舍入为整数。仅当超过一位参与者对该工作项投票时才会显示十字；只有一张投票时它会落在圆点上，因此会隐藏。与卡片分桶一样，每位参与者都能看到",[252,1757,1293],{},[252,1759,1356],{},"开启时，图表绘制每位参与者的投票。",[252,1762,1356],{},"关闭时，它绘制你自己的投票以及已完成会话的所有投票，主持人遵循相同范围。",[62,1765,1767],{"id":1766},"parametric-分桶","Parametric 分桶",[11,1769,1770,1771,1774,1775,1777,1778,1781,1782,1784],{},"Parametric 视角有一个分桶标签页，其布局、排序、间隔行和时间线与自由标度相同，但有两个差异。任何内容都不能拖动：表格只读，每张投票都从其行或投票面板投出。每一行在只读、紧凑、淡化的数字字段中显示计算结果，并带 ",[252,1772,1773],{},"sp"," 后缀，字段内还有一个叉圆",[252,1776,1460],{},"按钮和一个",[252,1779,1780],{},"编辑投票","按钮。编辑按钮会打开与计划表格相同的滑块弹出窗口，按下其中的",[252,1783,1213],{},"会保存该工作项的投票及其滑块位置。当视角写入时间值时，结果的人性化时长会在字段下方以小字居中显示。强制应用排名时，从此标签页、投票面板或计划表格批量字段进行的投票会像自由标度投票一样保持升序排名顺序，经过的工作项会采用相同结果和滑块位置。已投票的工作项在弹出窗口打开时会显示其记录的滑块，因此数字始终与保存的结果匹配。",[40,1786,1787],{"id":1787},"视角列",[11,1789,1790],{},"表格为适用于工作项类型的每个视角显示一列；不适用的视角单元格留空。每个单元格显示：",[845,1792,1793,1799,1805],{},[613,1794,1795,1798],{},[252,1796,1797],{},"参与百分比","：已投票投票者的比例，以颜色编码徽章显示（低于 25% 为红色，低于 50% 为黄色，低于 75% 为灰色，低于 100% 为蓝色，100% 为绿色）。仅当设置了必需投票者时显示。",[613,1800,1801,1804],{},[252,1802,1803],{},"投票会话状态","：进行中、已暂停或已完成，以徽章显示。",[613,1806,1807,1810,1811,1814,1815,1814,1818,1821,1822,1825],{},[252,1808,1809],{},"当前估算","：来自 Jira 的最新估算值，在没有活动会话时显示。每个已配置的估算字段都会按故事点、时间、T恤尺码的顺序显示为独立徽章，并用间隔点分隔；未配置的字段会省略。故事点显示“sp”后缀，时间值显示工作日时长，T恤尺码显示尺码标签。字段目标徽章与所选字段匹配，因此具有故事点、时间和 T恤字段的视角可以显示 ",[648,1812,1813],{},"10 sp"," · ",[648,1816,1817],{},"1 天",[648,1819,1820],{},"S","。使用",[252,1823,1824],{},"默认","目标时，T恤视角会将映射的故事点写入面板，并将尺码标签写入 T恤字段；单元格显示故事点和尺码标签。时间面板显示时长和尺码标签。数字面板永远不会显示时长。仅当估算目标写入时间值时才会显示时长：时间面板或时间字段，或同时具有故事点字段和时间字段的字段目标。批量投票单元格和内联投票面板使用相同单位，因此时间面板会在编辑器预览和公开投票徽章中显示时长，而数字面板保留故事点。如果你在计划表格打开时更改视角的估算目标、序列、故事点字段、时间字段、T恤字段、故事点转小时或估算面板，视角列会再次从 Jira 加载其值，因此显示的估算会匹配新配置而无需刷新页面。",[40,1827,1828],{"id":1828},"进度和状态",[11,1830,1831,1832,1835],{},"当计划会话有日期范围时，其面板会在底部按钮下方显示进度条和状态：结束日期过后显示",[252,1833,1834],{},"已完成","，开始日期之前显示倒计时，进行中显示剩余时间。",[40,1837,756],{"id":756},[11,1839,1840,1841,1843],{},"当计划会话中的所有估算工作完成时，点击",[252,1842,751],{},"。会先显示确认提示，因为完成计划会话会永久移除它及其所有工作项，因此它会从标签页列表中消失。完成它还会删除属于该计划会话的每一条记录：其聊天、其工作项的工作项聊天和反应、排名、容量规划数据、站会数据和回顾数据，以及关联的投票会话。",[11,1845,1846,1847,1850],{},"如果仍有活动投票会话，确认会变成",[252,1848,1849],{},"待处理的估算会话","警告，提供三个选择：",[845,1852,1853,1859,1865],{},[613,1854,1855,1858],{},[252,1856,1857],{},"不做任何操作","（默认）：完成计划会话，但不先接受或取消其投票会话。关联的投票会话和计划会话的所有其他数据都会被删除。",[613,1860,1861,1864],{},[252,1862,1863],{},"全部取消","：在完成计划会话之前取消每个投票会话，包括已完成的会话。",[613,1866,1867,1870],{},[252,1868,1869],{},"接受已完成","：在完成计划会话之前接受每个已完成投票会话的估算，包括主持人设置的任何值。",[11,1872,878,1873,1876,1877,1879],{},[252,1874,1875],{},"返回","以保留计划会话。确认后对话框会立即关闭，计划会话会立即从标签页列表中消失。如果无法完成，它会恢复。如果在",[252,1878,1869],{},"期间 Jira 写入失败，写入成功的工作项会被接受，失败的会话保持已完成以便重试，完成后的错误对话框会列出失败的工作项和原因。",[40,1881,1882],{"id":1882},"内联估算",[11,1884,1885,1886,1889],{},"需求梳理\u002F细化标签页在右侧固定列中保留一个内联投票面板。高亮工作项以将其加载到面板中；在你选择之前，它会显示",[252,1887,1888],{},"未选择工作项","空状态。",[11,1891,1892],{},"在你工作时，面板和计划表格会保持同步。在一个位置进行的投票、暂停、继续、完成、取消或更改必需投票者列表会立即出现在另一个位置。已接受的估算会在写入后立即更新两个位置。如果保存失败，两个位置会一起回到之前的状态。",[11,1894,1895,1896,1898],{},"表格中的工作项键会在工具提示中显示摘要。当主持人在面板的",[252,1897,888],{},"标签页中编辑摘要时，工具提示会无需刷新更新。在视角使用面板进行估算时，当前估算来自 Jira 的面板估算，因此即使估算字段在工作项界面中被隐藏，它也会显示。",[11,1900,1901,1902,682,1904,1906,1907,1909,1910,1912,1913,682,1916,1919,1920,1922,1923,1925,1926,893],{},"会话运行期间，内联面板包含",[252,1903,1213],{},[252,1905,888],{},"；公开投票开启时还包含",[252,1908,1293],{},"，当视角为 Parametric 时还包含该视角的图表标签页。",[252,1911,888],{},"在顶部显示当前 Jira 摘要，下方以富文本显示工作项描述，带有",[252,1914,1915],{},"摘要",[252,1917,1918],{},"描述","标签；不是主持人的参与者会看到不带头像的描述。它按工作项读取一次，并在页面保持打开期间复用；在详情标签页中进行的摘要或描述更改会无需刷新显示给其他参与者；主持人可以在那里编辑摘要和描述，每位参与者都能看到当前 Jira 内容。编辑会在你点击别处、切换到另一个标签页或关闭面板时保存，即使简短的描述暂停尚未结束。完成后，内联面板保留",[252,1921,1293],{},"、Parametric 视角的图表标签页以及",[252,1924,888],{},"，最终结果位于标签页下方。 在一个视角中的编辑也会在无需重新加载的情况下更新同一面板中其他所有视角的",[252,1927,888],{},{"title":145,"searchDepth":146,"depth":146,"links":1929},[1930,1931,1932,1936,1942,1945,1952,1953,1954,1955],{"id":595,"depth":146,"text":595},{"id":692,"depth":146,"text":692},{"id":759,"depth":146,"text":759,"children":1933},[1934,1935],{"id":765,"depth":152,"text":765},{"id":795,"depth":152,"text":796},{"id":865,"depth":146,"text":865,"children":1937},[1938,1939,1940,1941],{"id":899,"depth":152,"text":899},{"id":932,"depth":152,"text":932},{"id":954,"depth":152,"text":954},{"id":1030,"depth":152,"text":1030},{"id":912,"depth":146,"text":912,"children":1943},[1944],{"id":1249,"depth":152,"text":1249},{"id":1282,"depth":146,"text":1282,"children":1946},[1947,1948,1949,1950,1951],{"id":1258,"depth":152,"text":1258},{"id":1262,"depth":152,"text":1262},{"id":1304,"depth":152,"text":1304},{"id":1720,"depth":152,"text":1720},{"id":1766,"depth":152,"text":1767},{"id":1787,"depth":146,"text":1787},{"id":1828,"depth":146,"text":1828},{"id":756,"depth":146,"text":756},{"id":1882,"depth":146,"text":1882},"2026-11-10","计划会话将相关工作项分组，以便有条理地估算。 它们通过收集工作项并跟踪各视角的估算进度，帮助你准备冲刺规划。 计划会话位于空间估算页面上。 如果空间管理员在空间设置中隐藏该页面，工作项上的添加到计划操作也会随之隐藏。 在空间估算页面的需求梳理\u002F细化标签页中： 只有主持人可以创建计划会话。","计划会话","\u002Fog\u002Fguide-planning-sessions.jpg",[],{},8,"\u002Fgetting-started\u002Fplanning-sessions","guide",{"title":580,"description":1957},{"loc":1963,"lastmod":165},"planning-sessions","guide\u002Fzh-CN\u002Fplanning-sessions","guide\u002Fplanning-sessions","5aO0qWn2dIBdqm81LC-G3c0BPvW5hHPHMltvAcoKFOw",1795345554009]