[{"data":1,"prerenderedAt":975},["ShallowReactive",2],{"blog-index-it":3},[4,204,345,509,605,808],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fit\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Dipendenze nello sprint e pull request a catena | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Una catena di metallo, carte da planning poker e una tazza di caffè su un tavolo",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Gli sprint contengono spesso elementi di lavoro dipendenti, all'interno di un team o tra più team Scrum. In un mondo perfetto le dipendenze non esisterebbero; in pratica vincono le esigenze di business e le dipendenze si aggiungono per accorciare il ciclo di rilascio. Questo articolo descrive un modo per gestire le attività dipendenti nei team software.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Dipendenze tra attività",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"il-modo-tradizionale","Il modo tradizionale",[12,46,47,48,53],{},"L'approccio diretto è iniziare un'attività non appena la sua dipendenza è unita al branch principale. Con questo approccio alcuni membri del team restano fermi finché un'attività non è pronta. Alla fine resta poco o nessun tempo per le attività dipendenti rimanenti. Le ultime attività vengono riportate allo sprint successivo e ",[49,50,52],"a",{"href":51},"\u002Fit\u002Fblog\u002Fcomparison-metrics-for-agile-teams","il team non è contento",".",[12,55,56],{},"Perché succede anche se la capacità è stimata correttamente? Succede soprattutto a causa dei tempi morti in attesa che i colleghi finiscano. Anche piccoli ritardi si accumulano, soprattutto negli sprint brevi.",[41,58,60],{"id":59},"lavorare-insieme-sulle-attività-dipendenti","Lavorare insieme sulle attività dipendenti",[12,62,63],{},"C'è un modo per farlo con un piccolo costo aggiuntivo. Quando i membri del team lavorano alle attività contemporaneamente, ci sono diversi vantaggi.",[65,66,68],"h3",{"id":67},"collaborazione-migliore","Collaborazione migliore",[12,70,71],{},"Quando i membri del team lavorano contemporaneamente su attività dipendenti, la situazione assomiglia al pair programming. Una persona deve capire l'attività a monte, l'altra quella a valle. Il team acquisisce conoscenze più ampie sui problemi da risolvere.",[65,73,75],{"id":74},"evitare-i-tempi-morti","Evitare i tempi morti",[12,77,78],{},"Quando le attività procedono in parallelo, nessuno aspetta che arrivi una correzione. Tutti possono lavorare subito, con più discussioni estemporanee man mano che emergono domande.",[65,80,82],{"id":81},"pull-request-pronte-prima-per-la-revisione","Pull request pronte prima per la revisione",[12,84,85],{},"Quando il tuo branch si basa sul branch di un collega, approvare la pull request originale è più facile. Hai già capito come è stato implementato l'elemento a monte, e il branch originale è stato testato e revisionato durante tutta l'implementazione. Non è più terreno sconosciuto.",[41,87,89],{"id":88},"usare-pull-request-a-catena-impilate","Usare pull request a catena (impilate)",[12,91,92],{},"Questo livello di concorrenza richiede gli strumenti giusti. Con un controllo di versione basato su Git è semplice. I passaggi seguenti descrivono il processo.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Albero delle dipendenze",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Albero delle dipendenze (lavoro su 6 attività dipendenti contemporaneamente)",[65,107,109],{"id":108},"definire-le-dipendenze-con-chiarezza","Definire le dipendenze con chiarezza",[12,111,112],{},"Definisci la catena di dipendenze durante la pianificazione dello sprint. La catena di pull request segue poi esattamente quella definizione. Cambiare la catena a sviluppo iniziato costa caro per via del rebase.",[65,114,116],{"id":115},"partire-dalle-attività-radice","Partire dalle attività radice",[12,118,119],{},"Ogni catena di dipendenze ha attività radice che non dipendono da nient'altro. Il lavoro su di esse può iniziare dal primo giorno.",[65,121,123],{"id":122},"fare-prima-limplementazione-principale","Fare prima l'implementazione principale",[12,125,126],{},"Questo può entrare in conflitto con lo sviluppo guidato dai test, dove i test vengono prima. Per mantenere gestibile la catena di pull request, implementa prima il nucleo. Così gli altri membri del team hanno accesso prima.",[65,128,130],{"id":129},"organizzare-e-revisionare-in-una-coda-fifo","Organizzare e revisionare in una coda FIFO",[12,132,133],{},"Il primo branch creato dovrebbe essere revisionato e unito per primo. Ogni merge attiva la CI; se rompe la build principale, il problema viene corretto quando è ancora piccolo.",[41,135,137],{"id":136},"il-costo-aggiuntivo","Il costo aggiuntivo",[12,139,140],{},"Mantenere una catena di branch dipendenti ha vantaggi, ma anche qualche svantaggio.",[65,142,144],{"id":143},"rebase-o-merge","Rebase o merge",[12,146,147],{},"La catena va tenuta sincronizzata, e questo richiede impegno. Gli strumenti moderni offrono la sincronizzazione con un clic al branch di base quando non ci sono conflitti. Usala quando serve, quando è sicuro integrare le modifiche a monte. Quando la build è verde e la funzionalità funziona, sincronizza.",[65,149,151],{"id":150},"lavoro-di-squadra","Lavoro di squadra",[12,153,154],{},"Una catena di dipendenze richiede un team collaborativo i cui membri siano disposti a parlarsi. Non può funzionare se ognuno lavora in isolamento.",[12,156,157],{},"È meglio tenere gli elementi di lavoro dipendenti fuori dallo sprint in corso. Quando le esigenze di business richiedono di eseguirli in parallelo, una catena di branch derivati è un modo pratico per gestire il costo aggiuntivo delle dipendenze.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Gli elementi dipendenti bloccano lo sprint mentre il team aspetta. Ecco come le pull request impilate mantengono il lavoro in movimento e riducono i tempi morti.","md","Gestire le dipendenze dello sprint con pull request a catena","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"dipendenze nello sprint","pull request impilate","pull request a catena","revisione del codice","consegna agile","it",{},true,"\u002Fblog\u002Fit\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fit\u002Fmanage-sprint-dependencies-with-chained-pull-requests","TY0y64UuLIcuzfgkT2VlU36581djoS_6WeIY-pDTxdU",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":324,"description":325,"extension":182,"heading":326,"image":327,"imageAlt":213,"keywords":328,"locale":191,"meta":334,"navigation":193,"path":335,"reviewed":193,"seo":336,"sitemap":337,"slug":342,"stem":343,"translationKey":342,"__hash__":344},"blog\u002Fblog\u002Fit\u002Fcomparison-metrics-for-agile-teams.md","Metriche di confronto per team agile | AELBOX",{"type":9,"value":208,"toc":315},[209,216,219,223,226,233,237,241,244,248,251,259,263,271,275,278,281,288,292,295,302,305,309,312],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Un righello, carte da planning poker e una tazza di caffè su un tavolo",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Confrontare i team agile è difficile, e vale la pena chiedersi perché li confrontiamo affatto. In che modo confrontare team di domini diversi aiuta davvero?",[41,220,222],{"id":221},"creare-una-competizione","Creare una competizione",[12,224,225],{},"I team non dovrebbero essere classificati l'uno contro l'altro su metriche arbitrarie. Questo demotiva soltanto. Le metriche dovrebbero invece dare a ogni team pari opportunità di competere. Così la performance migliora perché i team lo vogliono, non perché qualcuno li spinge.",[12,227,228],{},[15,229],{"alt":222,"height":230,"loading":32,"src":231,"width":232,"decoding":34},487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,234,235],{},[38,236,222],{},[41,238,240],{"id":239},"le-metriche-per-creare-pari-opportunità","Le metriche per creare pari opportunità",[12,242,243],{},"Ecco quattro metriche di base per confrontare i team. Misurano la capacità di ogni team di competere a pari condizioni, niente di più. Metriche confrontabili creano pari opportunità.",[65,245,247],{"id":246},"sprint-riusciti","Sprint riusciti",[12,249,250],{},"Se uno sprint fosse solo un intervallo di tempo, non servirebbe a nulla. Uno sprint è una tappa e ha bisogno di un obiettivo. L'obiettivo dello sprint (l'insieme di storie più importante) è la tappa più grande; completare ogni storia è quella più piccola. Tieni una demo tra team alla fine di ogni sprint, dove i team presentano ciò che hanno consegnato. Quella competizione sana incoraggia i team a completare i propri obiettivi di sprint. Le persone hanno bisogno di un obiettivo visibile per essere motivate.",[12,252,253],{},[15,254],{"alt":255,"height":256,"loading":32,"src":257,"width":258,"decoding":34},"Sprint verso un obiettivo",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,260,261],{},[38,262,255],{},[12,264,265,266,270],{},"Potrebbe trasformarsi in una gara di impegni eccessivi o insufficienti? Se un team si impegna troppo poco, la demo lo rende evidente: c'è meno da mostrare. Se si impegna troppo, la demo diventa ",[267,268,269],"strong",{},"l'ennesimo sprint fallito",". Consegnare ciò su cui il team si è impegnato costruisce la motivazione a fare di più. I team si sentono soddisfatti del lavoro.",[65,272,274],{"id":273},"stabilità-della-velocità-e-stima-onesta","Stabilità della velocità e stima onesta",[12,276,277],{},"Questo è lavoro di conoscenza, non lavoro in catena di montaggio. Se nessuno nel team capisce un problema abbastanza bene da stimarne la soluzione, il problema non è stato studiato in anticipo.",[12,279,280],{},"Uno spike a tempo nello sprint precedente, seguito da una revisione dei risultati da parte del team, rende facile dividere l'implementazione in storie più piccole e stimarle adeguatamente. Per il lavoro complesso, scrivi un documento di progettazione tecnica più completo che elenchi le storie di implementazione.",[12,282,283,284,53],{},"Lo spike e il lavoro di progettazione sono essi stessi delle storie che si possono stimare. La chiave è definire la struttura e la sequenza del lavoro per una soluzione complessa. Invece di impegnarsi su una storia che il team non capisce, crea un'attività di ricerca per colmare il vuoto. Così la stima è ",[49,285,287],{"href":286},"\u002Fit\u002Fblog\u002Fsheepherding-story-points","fondata su elementi concreti",[65,289,291],{"id":290},"prevedibilità-della-capacità-evitare-il-lavoro-imprevisto","Prevedibilità della capacità (evitare il lavoro imprevisto)",[12,293,294],{},"La ricerca viene prima, l'implementazione dopo. Man mano che la ricerca scopre problemi, vengono creati e stimati nuovi elementi di lavoro. A quel punto hai un quadro molto più chiaro del prossimo sprint. Il lavoro noto si può stimare e pianificare; quello sconosciuto riceve un elemento di ricerca a tempo prima di essere stimato. La disciplina sta nel dividere il lavoro grande in parti piccole e stimabili.",[12,296,297,298,53],{},"Il lavoro complesso può iniziare presto, anche solo per scoprire che richiede il proprio insieme di storie. Anche così si riduce il ",[49,299,301],{"href":300},"\u002Fit\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","rischio dell'ignoto",[12,303,304],{},"Supporto e interventi urgenti in produzione di solito seguono un flusso Kanban a tempo, fuori dallo sprint. Lì il tempo di prima risposta e le violazioni degli SLA diventano le metriche di confronto.",[65,306,308],{"id":307},"disponibilità-del-team-tempo-dedicato-alle-attività-diviso-tempo-totale-nello-sprint","Disponibilità del team (tempo dedicato alle attività diviso tempo totale nello sprint)",[12,310,311],{},"La disponibilità è la quota di tempo che i membri del team dedicano al lavoro stimato. Se un team viene coinvolto in formazione, condivisione di conoscenze o altro lavoro interno più spesso degli altri, correggi lo squilibrio. L'unico modo per mantenere stabile la velocità è mantenere stabile la disponibilità. Quando la disponibilità tra i team è uguale, le altre metriche di confronto funzionano.",[12,313,314],{},"Confrontare i team non serve a punire una performance bassa, ma ad aumentare la motivazione e lo spirito di competere e consegnare di più. Ecco perché quelle metriche non dovrebbero essere visibili ai singoli membri del team: sono uno strumento di coaching, non una classifica pubblica. Monitorando queste metriche e guidando indirettamente gli Scrum Master, dai ai team le stesse possibilità di competere.",{"title":159,"searchDepth":160,"depth":160,"links":316},[317,318],{"id":221,"depth":160,"text":222},{"id":239,"depth":160,"text":240,"children":319},[320,321,322,323],{"id":246,"depth":166,"text":247},{"id":273,"depth":166,"text":274},{"id":290,"depth":166,"text":291},{"id":307,"depth":166,"text":308},"2018-05-04","Le metriche dovrebbero creare pari condizioni, non una classifica. Quattro metriche di confronto che motivano i team agile senza penalizzarli.","Metriche di confronto per team agile","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[329,330,331,332,333],"metriche agile","velocità del team","team agile","scrum","capacità",{},"\u002Fblog\u002Fit\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":325},{"loc":335,"images":338,"lastmod":179},[339,340,341],{"loc":215},{"loc":231},{"loc":257},"comparison-metrics-for-agile-teams","blog\u002Fit\u002Fcomparison-metrics-for-agile-teams","oXJFtvWHtZCDMAlnO25I7X0Vjdkl_KdoHGzKluM1K2g",{"id":346,"title":347,"author":7,"body":348,"dateModified":179,"datePublished":486,"description":487,"extension":182,"heading":488,"image":489,"imageAlt":354,"keywords":490,"locale":191,"meta":495,"navigation":193,"path":496,"reviewed":193,"seo":497,"sitemap":498,"slug":506,"stem":507,"translationKey":506,"__hash__":508},"blog\u002Fblog\u002Fit\u002Fsheepherding-story-points.md","Story point ed effetto gregge: ancoraggio | AELBOX",{"type":9,"value":349,"toc":477},[350,356,359,363,370,378,382,386,389,392,399,403,406,410,413,418,422,426,429,436,440,444,447,452,456,460,471,474],[12,351,352],{},[15,353],{"alt":354,"height":18,"loading":19,"src":355,"width":21,"fetchPriority":22},"Un gregge di pecore e carte da planning poker su un tavolino","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,357,358],{},"La stima con story point spesso viene trascurata oppure fatta in chat e riunioni aperte dove tutti possono vedere o sentire ogni voto. Sapere come hanno votato gli altri distorce il risultato e produce stime imprecise. Stime imprecise ripetute portano a piani difettosi e a consegne in ritardo o annullate. Ecco cosa succede in un voto aperto.",[41,360,362],{"id":361},"i-personaggi-del-voto","I personaggi del voto",[12,364,365,366,369],{},"In un voto di stima aperto compaiono diversi personaggi. La stima dipende da chi vota per primo e di solito è tutt'altro che onesta. Perché l'ordine conta così tanto in un voto aperto? Per l'",[267,367,368],{},"effetto gregge",": il bias di ancoraggio che porta gli altri membri del team a copiare la prima stima.",[12,371,372],{},[15,373],{"alt":374,"height":375,"loading":32,"src":376,"width":377,"decoding":34},"L'effetto gregge",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,379,380],{},[38,381,374],{},[65,383,385],{"id":384},"chi-vota-con-troppa-sicurezza","Chi vota con troppa sicurezza",[12,387,388],{},"Ogni team ha almeno un membro convinto di conoscere il sistema meglio di tutti. Di solito vota per primo, perché le risposte gli sembrano ovvie. Spesso trascura dettagli che possono far deragliare la stima. Quei dettagli si potrebbero scoprire in anticipo, ma solo se qualcuno avvia una discussione. In un voto aperto non può succedere.",[12,390,391],{},"Questa persona di solito vota meno della stima onesta. Forse solo lei riuscirebbe a completare la storia così in fretta, e solo con un po' di fortuna.",[12,393,394],{},[15,395],{"alt":385,"height":396,"loading":32,"src":397,"width":398,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,400,401],{},[38,402,385],{},[12,404,405],{},"Tutti gli altri seguono, così l'attività sembra facile e alla portata di chiunque nel tempo previsto. In pratica, di solito finisce per farla qualcun altro.",[65,407,409],{"id":408},"chi-vota-in-silenzio","Chi vota in silenzio",[12,411,412],{},"Di solito sono più d'uno, e hanno paura di votare per primi. Aspettano che voti qualcun altro per copiare il suo voto. Raramente partecipano alla discussione e rispondono solo se interrogati. Votano in seconda battuta, subito prima di chi vota senza interesse.",[12,414,415],{},[15,416],{"alt":409,"height":396,"loading":32,"src":417,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,419,420],{},[38,421,409],{},[65,423,425],{"id":424},"chi-vota-senza-interesse","Chi vota senza interesse",[12,427,428],{},"È difficile da individuare durante l'implementazione, ma il suo comportamento è evidente al momento del voto. Vota sempre per ultimo e copia la stima di qualcun altro. Se le stime differiscono, sceglie quella più comune. Non vuole spiegare perché ha scelto un numero più basso o più alto, quindi evita di collaborare al raffinamento e schiva le domande.",[12,430,431],{},[15,432],{"alt":425,"height":433,"loading":32,"src":434,"width":435,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,437,438],{},[38,439,425],{},[65,441,443],{"id":442},"chi-vota-stanco","Chi vota stanco",[12,445,446],{},"Alcuni membri del team non riescono a restare concentrati a lungo e perdono parti chiave della discussione. Perdono il contesto e tirano a indovinare oppure cercano il voto più diffuso da copiare.",[12,448,449],{},[15,450],{"alt":443,"height":396,"loading":32,"src":451,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,453,454],{},[38,455,443],{},[41,457,459],{"id":458},"come-mantenere-lattenzione-durante-la-stima","Come mantenere l'attenzione durante la stima",[12,461,462,463,467,468,470],{},"La stima conta perché solo story point onesti possono ",[49,464,466],{"href":465},"\u002Fit\u002Fblog\u002Fcorrectly-estimating-release-deadline","mantenere un progetto sulla rotta della sua data di rilascio",". La chiave per una stima onesta è contrastare l'",[267,469,368],{},", sia che tu usi carte di carta sia un software.",[12,472,473],{},"I membri del team non dovrebbero mai vedere le stime degli altri prima che il moderatore le riveli. Così chi vota in silenzio inizia a pensare, chi vota senza interesse si incuriosisce e chi vota stanco si sveglia. La domanda migliore da fare, soprattutto quando qualcuno non è d'accordo con il gruppo, è «perché hai votato X story point?». Questo apre una conversazione sui problemi reali di implementazione. Le domande chiuse come «saresti d'accordo con X story point?» invitano a un «sì» senza significato.",[12,475,476],{},"Uno strumento di stima adeguato rende il raffinamento più coinvolgente e tiene tutti attenti e pronti a discutere, così anche le storie complesse ricevono stime migliori.",{"title":159,"searchDepth":160,"depth":160,"links":478},[479,485],{"id":361,"depth":160,"text":362,"children":480},[481,482,483,484],{"id":384,"depth":166,"text":385},{"id":408,"depth":166,"text":409},{"id":424,"depth":166,"text":425},{"id":442,"depth":166,"text":443},{"id":458,"depth":160,"text":459},"2018-04-30","I voti aperti lasciano che la prima stima faccia da ancora al gruppo. Scopri come l'effetto gregge distorce gli story point e come condurre un planning poker onesto.","Story point ed effetto gregge","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[491,492,493,368,494],"story point","planning poker","bias di ancoraggio","stima agile",{},"\u002Fblog\u002Fit\u002Fsheepherding-story-points",{"title":347,"description":487},{"loc":496,"images":499,"lastmod":179},[500,501,502,503,504,505],{"loc":355},{"loc":376},{"loc":397},{"loc":417},{"loc":434},{"loc":451},"sheepherding-story-points","blog\u002Fit\u002Fsheepherding-story-points","QzyhCb4GburbLqjRW67xCYy5S8ijB5_2EBkGdNUq2N4",{"id":510,"title":511,"author":7,"body":512,"dateModified":179,"datePublished":585,"description":586,"extension":182,"heading":587,"image":588,"imageAlt":518,"keywords":589,"locale":191,"meta":594,"navigation":193,"path":595,"reviewed":193,"seo":596,"sitemap":597,"slug":602,"stem":603,"translationKey":602,"__hash__":604},"blog\u002Fblog\u002Fit\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","La regola Scrumban del 10% per ogni sprint | AELBOX",{"type":9,"value":513,"toc":580},[514,521,529,533,536,544,548,552,555,559,562,565,573,577],[12,515,516],{},[15,517],{"alt":518,"height":519,"loading":19,"src":520,"width":21,"fetchPriority":22},"Carte da planning poker e una board Kanban su un tavolino",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,522,523,524,528],{},"Molti team pianificano di usare esattamente la capacità indicata nel loro piano Jira. Spesso è un errore e porta a sprint falliti. Perché succede, quando i ",[49,525,527],{"href":526},"\u002Fit\u002Fblog\u002Fthe-importance-of-predictable-velocity","calcoli della capacità"," sembrano così precisi?",[41,530,532],{"id":531},"la-corsa-a-consegnare-di-più","La corsa a consegnare di più",[12,534,535],{},"I Product Owner tendono a spingere per una velocità più alta dopo ogni sprint riuscito, una reazione naturale ai risultati più recenti. Se il team ha completato un certo numero di story point nello sprint precedente, ci si aspetta che ne completi di più in quello successivo. Questo si ripete finché uno sprint non fallisce. La spinta è un tentativo di testare i limiti del team. Nella nostra esperienza è controproducente. Alla fine demotiva il team, che arriva a vedere ogni sprint futuro come condannato.",[12,537,538],{},[15,539],{"alt":540,"height":541,"loading":32,"src":542,"width":543,"decoding":34},"Lo sprint condannato",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,545,546],{},[38,547,540],{},[41,549,551],{"id":550},"la-fine-convulsa-di-uno-sprint-durante-una-corsa-alla-consegna","La fine convulsa di uno sprint durante una corsa alla consegna",[12,553,554],{},"Quando la capacità è pianificata per riempire esattamente lo sprint, qualsiasi ritardo o rischio concretizzato crea la pressione di lavorare a ritmi frenetici alla fine. Il team consegna quindi meno del promesso, perché lo stress prende il sopravvento. Quella corsa di fine sprint va eliminata.",[41,556,558],{"id":557},"lascia-che-il-team-consegni-di-più-per-volontà-propria","Lascia che il team consegni di più per volontà propria",[12,560,561],{},"Pianifica solo il 90% della capacità del team e riserva il restante 10% al lavoro non pianificato del backlog. Quelle attività vengono prese dal backlog in stile Scrumban durante lo sprint. Il buffer assorbe il rischio e permette al team di chiudere lo sprint (o almeno l'obiettivo dello sprint) qualche giorno prima. Se una dipendenza esterna minaccia lo sprint, un'attività del buffer può sostituire quella problematica.",[12,563,564],{},"Quel 10% non fa parte dell'impegno dello sprint. Se il rischio non si concretizza, il team lo consegna come lavoro extra; se qualcosa va storto, il buffer si consuma ma l'obiettivo e l'impegno dello sprint vengono comunque rispettati. Monitora quanto buffer viene usato: se arriva regolarmente al 20%, per esempio, è il momento di aumentare la velocità del team del 10% mantenendo il buffer del 10%.",[12,566,567],{},[15,568],{"alt":569,"height":570,"loading":32,"src":571,"width":572,"decoding":34},"Consegnare prima, consegnare di più",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,574,575],{},[38,576,569],{},[12,578,579],{},"La nostra esperienza mostra che è qui che le persone lavorano senza pressione e contribuiscono di più. La velocità può allora crescere al ritmo del team, senza pressioni esterne e con meno stress. La crescita sembra naturale e sostenibile.",{"title":159,"searchDepth":160,"depth":160,"links":581},[582,583,584],{"id":531,"depth":160,"text":532},{"id":550,"depth":160,"text":551},{"id":557,"depth":160,"text":558},"2018-04-28","Impegnarsi su tutta la capacità rende fragile ogni sprint. Un buffer Scrumban del 10% assorbe il rischio, protegge l'obiettivo e lascia crescere la velocità.","La regola Scrumban del 10% per ogni sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[590,591,592,593,332],"scrumban","capacità dello sprint","buffer agile","velocità",{},"\u002Fblog\u002Fit\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":511,"description":586},{"loc":595,"images":598,"lastmod":179},[599,600,601],{"loc":520},{"loc":542},{"loc":571},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fit\u002Fthe-10-percent-scrumban-rule-for-every-sprint","TQNCLrDQd_OysUM7Q72G6CQXtWnO_p_YRwna-Ys8UHY",{"id":606,"title":607,"author":7,"body":608,"dateModified":179,"datePublished":786,"description":787,"extension":182,"heading":788,"image":789,"imageAlt":614,"keywords":790,"locale":191,"meta":794,"navigation":193,"path":795,"reviewed":193,"seo":796,"sitemap":797,"slug":805,"stem":806,"translationKey":805,"__hash__":807},"blog\u002Fblog\u002Fit\u002Fcorrectly-estimating-release-deadline.md","Come stimare la scadenza con gli story point | AELBOX",{"type":9,"value":609,"toc":772},[610,616,619,623,630,634,637,645,649,653,656,659,663,666,674,679,683,686,690,693,697,700,707,712,716,719,723,726,734,738,742,745,750,757,765,769],[12,611,612],{},[15,613],{"alt":614,"height":18,"loading":19,"src":615,"width":21,"fetchPriority":22},"Carte da planning poker, un diagramma di Gantt e una tazza di caffè su un tavolo","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,617,618],{},"Una parte importante della gestione di progetto è stimare la data di rilascio di un progetto. Ma come si prevede quando sarà consegnato un sistema grande e complesso?",[41,620,622],{"id":621},"i-problemi-della-stima","I problemi della stima",[12,624,625,626,629],{},"Per consegnare in tempo serve una stima affidabile del lavoro. ",[49,627,628],{"href":526},"Stimare le attività è di solito difficile",", soprattutto quando devi impegnarti su stime basate sul tempo per ogni attività. Psicologicamente, impegnarsi su un tempo di completamento è difficile, e quegli impegni spesso falliscono.",[65,631,633],{"id":632},"il-problema-del-tempo","Il problema del tempo",[12,635,636],{},"Stimare il tempo è problematico per un motivo semplice: più l'attività è complessa, maggiore è la probabilità di mancare la scadenza. Dipende anche da chi prende in carico l'attività. I membri del team lavorano a velocità diverse e consegnano quantità di lavoro diverse. Poiché la disponibilità cambia con ferie e formazione, un'attività stimata dal membro più veloce può finire nelle mani del più lento. L'ordinato diagramma di Gantt diventa un disastro: le attività vanno in ritardo e i manager si preoccupano costantemente che il progetto finisca in tempo.",[12,638,639],{},[15,640],{"alt":641,"height":642,"loading":32,"src":643,"width":644,"decoding":34},"Diagramma di Gantt che salta",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,646,647],{},[38,648,641],{},[65,650,652],{"id":651},"la-resistenza-alle-stime-basate-sul-tempo","La resistenza alle stime basate sul tempo",[12,654,655],{},"Quando si chiede una stima a chi implementa, spesso c'è resistenza: se la stima non viene rispettata, di chi è la colpa? E se un'attività stimata da una persona finisce a un'altra, di chi è la colpa quando il tempo effettivo è diverso?",[12,657,658],{},"Il risultato è la riluttanza a stimare del tutto, il che rende difficile per il management stimare correttamente le date di consegna.",[41,660,662],{"id":661},"usare-gli-story-point","Usare gli story point",[12,664,665],{},"Gli story point offrono un'alternativa alle stime basate sul tempo. Uno story point non è un'unità fissa di lavoro; è una stima relativa che cresce in modo esponenziale. Tutto il team stima insieme durante il raffinamento.",[12,667,668],{},[15,669],{"alt":670,"height":671,"loading":32,"src":672,"width":673,"decoding":34},"Esempio di story point",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,675,676],{},[38,677,678],{},"Esempio di stime",[65,680,682],{"id":681},"condividere-la-responsabilità","Condividere la responsabilità",[12,684,685],{},"Con gli story point, tutto il team stima ogni attività. La stima è accettata quando tutti sono d'accordo. Così si evitano discussioni successive su chi ha stimato l'attività e quanto tempo ha richiesto davvero. Il team si è accordato in anticipo, quindi la responsabilità è condivisa.",[65,687,689],{"id":688},"stimare-la-complessità","Stimare la complessità",[12,691,692],{},"Gli story point catturano la complessità di un'attività, comprese le dipendenze esterne e il rischio che qualcosa vada storto. Poiché non sono un impegno su una metrica fisica come il tempo, sono più facili da fornire per il team.",[65,694,696],{"id":695},"la-stima-più-piccola","La stima più piccola",[12,698,699],{},"Poiché gli story point sono relativi, serve un'ancora da cui partire. L'ancora è la più piccola unità di lavoro che richiede un po' di implementazione. È la quantità minima di lavoro che il team può stimare.",[12,701,702],{},[15,703],{"alt":696,"height":704,"loading":32,"src":705,"width":706,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,708,709],{},[38,710,711],{},"La stima più bassa",[65,713,715],{"id":714},"la-stima-più-grande","La stima più grande",[12,717,718],{},"Gli story point crescono in modo esponenziale per mostrare che più un'attività è complessa, più è difficile stimarla. La scala può estendersi all'infinito (∞), anche se quella stima si usa raramente. La stima più grande dovrebbe corrispondere al massimo lavoro che una persona riesce a completare in uno sprint in media. La durata stessa dello sprint dovrebbe corrispondere alla quantità massima di lavoro che una persona può gestire senza perdere il controllo dell'attività.",[65,720,722],{"id":721},"le-storie-più-grandi-della-stima-più-grande","Le storie più grandi della stima più grande",[12,724,725],{},"Alcune attività ricevono più story point di quanti una persona possa completarne in uno sprint. Metterle in uno sprint causa lavoro riportato. Il lavoro riportato fa sembrare lo sprint incompleto e il lavoro non finito. Le attività stimate oltre quel limite vanno divise in unità più piccole e stimate di nuovo.",[12,727,728],{},[15,729],{"alt":730,"height":731,"loading":32,"src":732,"width":733,"decoding":34},"Dividere 13 story point",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,735,736],{},[38,737,730],{},[41,739,741],{"id":740},"la-velocità-in-story-point","La velocità in story point",[12,743,744],{},"La velocità è il numero medio di story point che un team completa in uno sprint a piena disponibilità. La disponibilità è la quota dello sprint che il team può dedicare davvero al lavoro di progetto dopo ferie, formazione e supporto. La capacità è la velocità moltiplicata per la disponibilità.",[12,746,747],{},[38,748,749],{},"capacità = velocità × disponibilità",[12,751,752,753,756],{},"Poiché la capacità è espressa in story point, si può convertire in tempo usando il rapporto tra story point e tempo del team. Quando ",[49,754,755],{"href":526},"la velocità è prevedibile",", la data di rilascio si può stimare con precisione. Sulla base di story point e sprint, il diagramma di Gantt che ne risulta è stabile e prevedibile:",[12,758,759],{},[15,760],{"alt":761,"height":762,"loading":32,"src":763,"width":764,"decoding":34},"Diagramma di Gantt corretto",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,766,767],{},[38,768,761],{},[12,770,771],{},"Il punto di svolta è questo: quando la velocità è stabile, la data di rilascio diventa un calcolo, non una supposizione.",{"title":159,"searchDepth":160,"depth":160,"links":773},[774,778,785],{"id":621,"depth":160,"text":622,"children":775},[776,777],{"id":632,"depth":166,"text":633},{"id":651,"depth":166,"text":652},{"id":661,"depth":160,"text":662,"children":779},[780,781,782,783,784],{"id":681,"depth":166,"text":682},{"id":688,"depth":166,"text":689},{"id":695,"depth":166,"text":696},{"id":714,"depth":166,"text":715},{"id":721,"depth":166,"text":722},{"id":740,"depth":160,"text":741},"2018-04-14","Le stime basate sul tempo falliscono quando cambiano complessità e disponibilità. Story point, stime condivise e velocità rendono prevedibile la data di rilascio.","Come stimare la scadenza di un rilascio","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[791,491,494,792,793],"scadenza di rilascio","velocità dello sprint","pianificazione della capacità",{},"\u002Fblog\u002Fit\u002Fcorrectly-estimating-release-deadline",{"title":607,"description":787},{"loc":795,"images":798,"lastmod":179},[799,800,801,802,803,804],{"loc":615},{"loc":643},{"loc":672},{"loc":705},{"loc":732},{"loc":763},"correctly-estimating-release-deadline","blog\u002Fit\u002Fcorrectly-estimating-release-deadline","7jxEQMLkTQG49enUl6rvaGsE50Z_tSw0Nisq7_9egKs",{"id":809,"title":810,"author":7,"body":811,"dateModified":179,"datePublished":786,"description":957,"extension":182,"heading":958,"image":959,"imageAlt":817,"keywords":960,"locale":191,"meta":963,"navigation":193,"path":964,"reviewed":193,"seo":965,"sitemap":966,"slug":972,"stem":973,"translationKey":972,"__hash__":974},"blog\u002Fblog\u002Fit\u002Fthe-importance-of-predictable-velocity.md","Velocità prevedibile: impegni di sprint affidabili | AELBOX",{"type":9,"value":812,"toc":947},[813,819,822,826,829,832,835,843,847,851,854,858,861,864,871,878,882,886,889,892,895,898,902,905,908,915,919,923,931,934,938,944],[12,814,815],{},[15,816],{"alt":817,"height":18,"loading":19,"src":818,"width":21,"fetchPriority":22},"Carte da planning poker e un cronometro su un tavolino","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,820,821],{},"La velocità prevedibile è la capacità di sapere in anticipo quanto lavoro completerà un team in un dato periodo, in base alla sua disponibilità.",[41,823,825],{"id":824},"il-problema-di-una-velocità-variabile","Il problema di una velocità variabile",[12,827,828],{},"Quando la velocità varia tra uno sprint e l'altro, pianificare un rilascio diventa difficile. Nessuno sa quando il lavoro sarà consegnato e l'intero processo Scrum si inceppa. Prende il sopravvento il caos, che non aiuta certo il morale del team.",[12,830,831],{},"Una velocità variabile di solito nasce perché i membri del team cercano di dare il massimo e si impegnano su più di quanto riescano a consegnare. In un ambiente collaborativo con un processo di sviluppo ben impostato, un'attività è più della semplice implementazione. Alcuni membri del team sono fortunati e trovano attività relativamente semplici da implementare, mentre altri incappano in un problema che nessuno aveva previsto. In uno sprint la velocità sembra alta perché il team sta chiudendo il lavoro riportato dagli sprint precedenti; in quello successivo cala perché compare nuovo lavoro riportato.",[12,833,834],{},"Il lavoro riportato dà l'impressione che il team stia rendendo meno: potrebbe fare di più, ma qualcosa di imprevedibile si mette sempre in mezzo. Il management nota il problema, vede le scadenze mancate e la tensione tra i membri del team cresce.",[12,836,837],{},[15,838],{"alt":839,"height":840,"loading":32,"src":841,"width":842,"decoding":34},"Sprint regolare con lavoro riportato",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,844,845],{},[38,846,839],{},[41,848,850],{"id":849},"i-problemi-più-comuni-nel-mantenere-la-prevedibilità","I problemi più comuni nel mantenere la prevedibilità",[12,852,853],{},"I problemi variano da progetto a progetto, ma molti sono comuni a tutti i tipi di progetto. Ecco quelli più frequenti, con correzioni pratiche.",[65,855,857],{"id":856},"aspettarsi-limprevisto","Aspettarsi l'imprevisto",[12,859,860],{},"Alcune attività richiedono ricerca prima di poter iniziare. Immagina una funzionalità che dipende da un'azienda terza che potrebbe non rispondere quando ti serve. Oppure una funzionalità che non si può implementare come previsto perché il team ha frainteso la tecnologia di base quando ha creato l'attività.",[12,862,863],{},"Se un'attività del genere viene aggiunta a uno sprint senza la ricerca necessaria, è probabile che richieda più tempo del previsto e la colpa ricadrà sulla stima. C'è chi sostiene che serva uno spike per studiare prima l'argomento. Ma come fai a sapere quali attività ne hanno bisogno?",[12,865,866,867,870],{},"L'unico modo è ",[49,868,869],{"href":300},"iniziare a lavorare su un'attività in anticipo",". Iniziare prima che un'attività sia pianificata permette di scoprire i problemi prima che si presentino. Con questo approccio, un'attività entra in uno sprint solo quando è chiara e parte del lavoro è già stata fatta.",[12,872,873],{},[15,874],{"alt":875,"height":840,"loading":32,"src":876,"width":877,"decoding":34},"Sprint con attività iniziate in anticipo","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,879,880],{},[38,881,875],{},[65,883,885],{"id":884},"evitare-definizioni-vaghe-delle-attività","Evitare definizioni vaghe delle attività",[12,887,888],{},"Alcune attività sembrano accettabili a chi le crea, ma omettono dettagli importanti. Alcuni dettagli di implementazione possono influire seriamente sulla consegna.",[12,890,891],{},"Gli stakeholder di business possono sostenere che le definizioni delle attività non debbano contenere dettagli tecnici, eppure chi implementa trova spesso i requisiti di business troppo vaghi per agire.",[12,893,894],{},"La soluzione è un documento di progettazione tecnica a cui l'attività di implementazione fa riferimento. Così è chiaro che cosa va costruito esattamente.",[12,896,897],{},"Aiuta anche includere i dettagli tecnici nella descrizione dell'attività, così chi implementa sa cosa deve fare e può individuare subito i potenziali problemi.",[65,899,901],{"id":900},"ridurre-la-capacità-con-la-sequenza-di-fibonacci","Ridurre la capacità con la sequenza di Fibonacci",[12,903,904],{},"A volte i membri del team vanno in ferie, oppure un giorno festivo cade durante lo sprint. Anche formazione ed eventi interni riducono la disponibilità: il tempo che il team può dedicare al lavoro di progetto. In questi casi la capacità va ridotta per riflettere le persone mancanti.",[12,906,907],{},"Si presume che la velocità sia costante, ma si calcola dalla velocità media di tutti i membri del team. Per semplicità, supponi che una persona completi uno story point al giorno. Se una persona manca per un giorno, riduci la capacità dello sprint di uno story point. Se due persone mancano per due giorni (quattro story point), riduci la capacità di cinque story point (il numero di Fibonacci successivo) invece di quattro. Se due persone mancano per tre giorni, riduci la capacità di otto punti invece di sei, per tenere conto del rischio legato alle dipendenze.",[12,909,910],{},[15,911],{"alt":912,"height":840,"loading":32,"src":913,"width":914,"decoding":34},"Impegnare meno capacità del calcolato","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,916,917],{},[38,918,912],{},[65,920,922],{"id":921},"evitare-attività-dipendenti","Evitare attività dipendenti",[12,924,925,926,930],{},"Spesso una persona completa un'attività da cui dipende l'attività di un altro membro del team. Così nascono ",[49,927,929],{"href":928},"\u002Fit\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","dipendenze interne al team o tra team",". Se la prima attività è in ritardo, ogni attività dipendente slitta. I membri del team restano fermi e poi corrono quando la dipendenza si sblocca, sprecando tempo prezioso.",[12,932,933],{},"Le attività dipendenti possono iniziare prima, così al successivo sprint le attività a monte critiche sono quasi completate. Questo riduce l'impatto della dipendenza sulla velocità dello sprint in corso.",[65,935,937],{"id":936},"stimare-con-onestà","Stimare con onestà",[12,939,940,943],{},[49,941,942],{"href":286},"Stimare le attività con onestà"," è difficile e richiede l'attenzione di tutto il team. Ognuno dovrebbe stimare senza farsi influenzare dalle stime degli altri. Solo stime oneste mostrano quanto tempo richiederà davvero un'epica e mantengono realistiche le date di rilascio.",[12,945,946],{},"La velocità prevedibile non è uno strumento o una metrica da imporre a un team; è il risultato di eliminare le sorprese una alla volta. Parti dalle cinque correzioni qui sopra e la data di rilascio smette di essere una supposizione.",{"title":159,"searchDepth":160,"depth":160,"links":948},[949,950],{"id":824,"depth":160,"text":825},{"id":849,"depth":160,"text":850,"children":951},[952,953,954,955,956],{"id":856,"depth":166,"text":857},{"id":884,"depth":166,"text":885},{"id":900,"depth":166,"text":901},{"id":921,"depth":166,"text":922},{"id":936,"depth":166,"text":937},"Perché la velocità oscilla tra uno sprint e l'altro e come rendere prevedibili gli impegni: cinque correzioni pratiche per pianificazione, capacità e dipendenze.","L'importanza di una velocità prevedibile","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[961,792,494,491,962],"velocità prevedibile","pianificazione del rilascio",{},"\u002Fblog\u002Fit\u002Fthe-importance-of-predictable-velocity",{"title":810,"description":957},{"loc":964,"images":967,"lastmod":179},[968,969,970,971],{"loc":818},{"loc":841},{"loc":876},{"loc":913},"the-importance-of-predictable-velocity","blog\u002Fit\u002Fthe-importance-of-predictable-velocity","l7fhcUV_WGTDxRihWrBMDJb1Q0DlluyHfe----dju1w",1795345550061]