[{"data":1,"prerenderedAt":975},["ShallowReactive",2],{"blog-index-hu":3},[4,204,346,510,606,808],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fhu\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprintfüggőségek és láncolt pull requestek | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Fém lánc, planning poker kártyák és egy kávéscsésze az asztalon",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"A sprintek gyakran tartalmaznak függő munkatételeket, akár egy csapaton belül, akár több Scrum-csapat között. Egy tökéletes világban nem lennének függőségek; a gyakorlatban viszont az üzleti igények győznek, és a release-ciklus rövidítése érdekében függőségek kerülnek be. Ez a cikk egy módot mutat be a függő munkatételek kezelésére szoftveres csapatokban.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Függőségek a munkatételek között",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"a-régimódi-módszer","A régimódi módszer",[12,46,47,48,53],{},"Az egyszerű megközelítés, hogy a munkatétel akkor indul, amikor a függősége bekerül a main ágba. Ezzel a módszerrel néhány csapattag tétlenül ül, amíg egy munkatétel készen nem áll. Végül alig vagy egyáltalán nem marad idő a többi függő munkatételre. Az utolsó munkatételek áthúzódnak, és ",[49,50,52],"a",{"href":51},"\u002Fhu\u002Fblog\u002Fcomparison-metrics-for-agile-teams","a csapat elégedetlen",".",[12,55,56],{},"Miért történik ez meg akkor is, ha a kapacitás helyesen van becsülve? Leginkább azért, mert a kollégákra várva állásidő keletkezik. Még a kis késések is összeadódnak, különösen a rövid sprintekben.",[41,58,60],{"id":59},"függő-munkatételek-párhuzamos-kezelése","Függő munkatételek párhuzamos kezelése",[12,62,63],{},"Van rá mód, némi többletráfordítással. Ha a csapattagok párhuzamosan dolgoznak a munkatételeken, annak több előnye is van.",[65,66,68],"h3",{"id":67},"jobb-együttműködés","Jobb együttműködés",[12,70,71],{},"Ha a csapattagok párhuzamosan dolgoznak függő munkatételeken, az a páros programozásra emlékeztet. Az egyik embernek a megelőző munkatételt kell értenie, a másiknak a rákövetkezőt. A csapat szélesebb tudásra tesz szert a megoldandó problémákról.",[65,73,75],{"id":74},"az-állásidő-elkerülése","Az állásidő elkerülése",[12,77,78],{},"Ha a munkatételek egyidejűleg futnak, senki nem vár arra, hogy egy javítás megérkezzen. Mindenki egyszerre tud dolgozni, több alkalmi egyeztetéssel, ahogy a kérdések felmerülnek.",[65,80,82],{"id":81},"a-pull-requestek-korábban-készen-állnak-a-kódellenőrzésre","A pull requestek korábban készen állnak a kódellenőrzésre",[12,84,85],{},"Amikor az ága egy kolléga ágára épül, könnyebb az eredeti pull requestet jóváhagyni. Már érti, hogyan valósult meg a megelőző munkatétel, és az eredeti ágat a megvalósítás során végig tesztelték és ellenőrizték. Már nem ismeretlen terep.",[41,87,89],{"id":88},"láncolt-stacked-pull-requestek-használata","Láncolt (stacked) pull requestek használata",[12,91,92],{},"Az ilyen szintű párhuzamosság megfelelő eszközöket igényel. Git-alapú verziókezeléssel ez egyszerű. Az alábbi lépések mutatják a folyamatot.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Függőségi fa",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Függőségi fa (hat függő munkatételen dolgozunk párhuzamosan)",[65,107,109],{"id":108},"vázolja-fel-világosan-a-függőségeket","Vázolja fel világosan a függőségeket",[12,111,112],{},"A függőségi láncot a sprinttervezés során határozza meg. A pull requestek lánca aztán pontosan követi ezt a meghatározást. A lánc fejlesztés közbeni átalakítása drága a rebase miatt.",[65,114,116],{"id":115},"a-gyökér-munkatételekkel-kezdje","A gyökér munkatételekkel kezdje",[12,118,119],{},"Minden függőségi láncnak vannak gyökér munkatételei, amelyek semmitől nem függnek. Ezeken már az első napon el lehet kezdeni a munkát.",[65,121,123],{"id":122},"először-a-lényegi-megvalósítás","Először a lényegi megvalósítás",[12,125,126],{},"Ez ütközhet a tesztvezérelt fejlesztéssel, ahol a tesztek jönnek először. A pull requestek láncának kezelhetősége érdekében először a lényeget valósítsa meg. Így a függő csapattagok hamarabb hozzáférnek.",[65,128,130],{"id":129},"szervezés-és-kódellenőrzés-fifo-sorban","Szervezés és kódellenőrzés FIFO-sorban",[12,132,133],{},"Az elsőként létrehozott ágat kell először ellenőrizni és egyesíteni. Minden egyesítés CI-t indít; ha elrontja a main buildet, a problémát még kicsi korában javítják.",[41,135,137],{"id":136},"a-többletráfordítás","A többletráfordítás",[12,139,140],{},"A függő ágak láncának fenntartása előnyös, de van néhány hátránya is.",[65,142,144],{"id":143},"rebase-vagy-egyesítés","Rebase vagy egyesítés",[12,146,147],{},"A láncot szinkronban kell tartani, ami energiát igényel. A modern eszközök egy kattintással szinkronizálnak az alapággal, ha nincsenek konfliktusok. Használja igény szerint, amikor biztonságos behúzni a megelőző ágak változásait. Ha a build zöld, és a funkció működik, szinkronizáljon.",[65,149,151],{"id":150},"csapatmunka","Csapatmunka",[12,153,154],{},"A függőségi lánc együttműködő csapatot igényel, amelynek tagjai hajlandók beszélni egymással. Nem működik, ha mindenki elszigetelten dolgozik.",[12,156,157],{},"A függő munkatételeket a legjobb kihagyni az aktuális sprintből. Ha az üzleti igények mégis párhuzamos futást kívánnak, a származtatott ágak lánca gyakorlati megoldás a függőségek kezelésére.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","A függő munkatételek megbénítják a sprintet, miközben a csapat vár. Így tartják mozgásban a láncolt pull requestek a munkát, kevesebb állásidővel.","md","Sprintfüggőségek kezelése láncolt pull requestekkel","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"sprintfüggőségek","láncolt pull requestek","stacked pull requestek","kódellenőrzés","agilis szállítás","hu",{},true,"\u002Fblog\u002Fhu\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fhu\u002Fmanage-sprint-dependencies-with-chained-pull-requests","GWUpfsVkOABFMrusGkFxIlwDhgoHg4V2d9H2v3qFdeg",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":325,"description":326,"extension":182,"heading":327,"image":328,"imageAlt":213,"keywords":329,"locale":191,"meta":335,"navigation":193,"path":336,"reviewed":193,"seo":337,"sitemap":338,"slug":343,"stem":344,"translationKey":343,"__hash__":345},"blog\u002Fblog\u002Fhu\u002Fcomparison-metrics-for-agile-teams.md","Összehasonlító mutatók agilis csapatoknak | AELBOX",{"type":9,"value":208,"toc":316},[209,216,219,223,226,234,238,242,245,249,252,260,264,272,276,279,282,289,293,296,303,306,310,313],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Vonalzó, planning poker kártyák és egy kávéscsésze az asztalon",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Az agilis csapatok összehasonlítása nehéz, és érdemes elgondolkodni azon, miért hasonlítjuk össze őket egyáltalán. Miben segít valójában, ha különböző területek csapatait hasonlítjuk össze?",[41,220,222],{"id":221},"versenyhelyzet-teremtése","Versenyhelyzet teremtése",[12,224,225],{},"A csapatokat nem szabad önkényes mutatók alapján egymás ellen rangsorolni. Az csak demotiválja az embereket. A mutatóknak inkább egyenlő esélyt kell adniuk minden csapatnak a versenyhez. A teljesítmény így azért javul, mert a csapatok akarják, nem azért, mert valaki hajtja őket.",[12,227,228],{},[15,229],{"alt":230,"height":231,"loading":32,"src":232,"width":233,"decoding":34},"Teremtsen versenyhelyzetet",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,235,236],{},[38,237,230],{},[41,239,241],{"id":240},"az-egyenlő-esélyeket-teremtő-mutatók","Az egyenlő esélyeket teremtő mutatók",[12,243,244],{},"Íme négy alapvető mutató a csapatok összehasonlításához. Azt mérik, mennyire képesek az egyes csapatok egyenlő feltételek mellett versenyezni, és semmi többet. Az összehasonlítható mutatók egyenlő esélyeket teremtenek.",[65,246,248],{"id":247},"sikeres-sprintek","Sikeres sprintek",[12,250,251],{},"Ha egy sprint csak egy időkeret lenne, nem lenne semmi értelme. A sprint mérföldkő, és cél kell hozzá. A sprintcél (a legfontosabb történetek halmaza) a nagyobb mérföldkő; az összes történet teljesítése a kisebb. Minden sprint végén tartson csapatok közötti demót, ahol a csapatok bemutatják, mit szállítottak. Ez az egészséges verseny arra ösztönzi a csapatokat, hogy befejezzék a sprintcéljukat. Az embereknek látható cél kell a motivációhoz.",[12,253,254],{},[15,255],{"alt":256,"height":257,"loading":32,"src":258,"width":259,"decoding":34},"Sprint egy cél felé",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,261,262],{},[38,263,256],{},[12,265,266,267,271],{},"Nem válhat ebből túl- és alulvállalások játéka? Ha egy csapat alulvállal, a demó nyilvánvalóvá teszi: kevesebb mutatnivalója van. Ha túlvállal, a demó ",[268,269,270],"strong",{},"egy újabb elbukott sprintté"," válik. A vállalt munka leszállítása motivációt ad a többre. A csapatok elégedettek a munkájukkal.",[65,273,275],{"id":274},"a-sebesség-stabilitása-és-az-őszinte-becslés","A sebesség stabilitása és az őszinte becslés",[12,277,278],{},"Ez tudásmunka, nem futószalagos munka. Ha a csapatban senki nem érti eléggé a problémát ahhoz, hogy megbecsülje a megoldást, a problémát nem kutatták fel előre.",[12,280,281],{},"Ha az előző sprintben van egy időkorlátos spike, és a csapat közösen áttekinti az eredményeket, könnyebb a megvalósítást kisebb történetekre bontani és megfelelően megbecsülni. Összetett munka esetén írjon részletesebb technikai tervezési dokumentumot, amely felsorolja a megvalósítási történeteket.",[12,283,284,285,53],{},"A spike és a tervezés maga is olyan történet, amely becsülhető. A kulcs az, hogy meg kell határozni egy összetett megoldás munkájának szerkezetét és sorrendjét. Ahelyett, hogy olyan történetet vállalna, amelyet a csapat nem ért, hozzon létre egy kutatási feladatot a hiány pótlására. Így a becslés ",[49,286,288],{"href":287},"\u002Fhu\u002Fblog\u002Fsheepherding-story-points","bizonyítékokon alapul",[65,290,292],{"id":291},"a-kapacitás-kiszámíthatósága-a-váratlan-munka-elkerülése","A kapacitás kiszámíthatósága (a váratlan munka elkerülése)",[12,294,295],{},"A kutatás jön először; a megvalósítás utána. Ahogy a kutatás feltárja a problémákat, új munkatételek születnek, és ezeket meg kell becsülni. Így sokkal tisztább képe lesz a következő sprintről. Az ismert munkát meg lehet becsülni és meg lehet tervezni; az ismeretlen munka időkorlátos kutatási munkatételt kap, mielőtt becsülnék. A fegyelem abban rejlik, hogy a nagy munkát kicsi, becsülhető darabokra bontsuk fel.",[12,297,298,299,53],{},"Az összetett munka korán elkezdhető, akár csak azért is, hogy kiderüljön: saját történeteket igényel. Ez is csökkenti az ",[49,300,302],{"href":301},"\u002Fhu\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","ismeretlen kockázatát",[12,304,305],{},"A támogatás és az éles üzemeltetés tűzoltása általában a sprinten kívüli, időkorlátos Kanban-folyamatban zajlik. Ott az első válasz ideje és az SLA-megsértések számítanak összehasonlítási mutatónak.",[65,307,309],{"id":308},"a-csapat-rendelkezésre-állása-a-feladatokra-fordított-idő-osztva-a-sprint-teljes-idejével","A csapat rendelkezésre állása (a feladatokra fordított idő osztva a sprint teljes idejével)",[12,311,312],{},"A rendelkezésre állás az az időhányad, amelyet a csapattagok becsült munkára fordítanak. Ha az egyik csapatot gyakrabban vonják el képzésre, tudásmegosztásra vagy más belső munkára, mint a többieket, szüntesse meg az egyensúlytalanságot. A sebesség csak úgy tartható stabilan, ha a rendelkezésre állás stabil. Ha a rendelkezésre állás egyenlő a csapatok között, a többi összehasonlítási mutató is működni fog.",[12,314,315],{},"Az összehasonlítás nem a gyenge teljesítmény büntetése, hanem a motiváció és a versenyszellem erősítése annak érdekében, hogy a csapatok többet szállítsanak. Ezért nem szabad ezeket a mutatókat az egyes csapattagok számára láthatóvá tenni: ez a coaching eszköze, nem nyilvános ranglista. Ha figyeli ezeket a mutatókat, és közvetve irányítja a Scrum Mastereket, egyenlő esélyt ad a csapatoknak a versenyhez.",{"title":159,"searchDepth":160,"depth":160,"links":317},[318,319],{"id":221,"depth":160,"text":222},{"id":240,"depth":160,"text":241,"children":320},[321,322,323,324],{"id":247,"depth":166,"text":248},{"id":274,"depth":166,"text":275},{"id":291,"depth":166,"text":292},{"id":308,"depth":166,"text":309},"2018-05-04","A mutatók egyenlő esélyeket teremtsenek, ne ranglistát. Négy összehasonlító mutató, amely motiválja az agilis csapatokat, ahelyett hogy büntetné őket.","Összehasonlító mutatók agilis csapatoknak","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[330,331,332,333,334],"agilis mutatók","csapatsebesség","agilis csapatok","scrum","kapacitás",{},"\u002Fblog\u002Fhu\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":326},{"loc":336,"images":339,"lastmod":179},[340,341,342],{"loc":215},{"loc":232},{"loc":258},"comparison-metrics-for-agile-teams","blog\u002Fhu\u002Fcomparison-metrics-for-agile-teams","rpOjDlpkiBczlFuqPvGpw42-b4WShVDDC2Xvz-kvtcM",{"id":347,"title":348,"author":7,"body":349,"dateModified":179,"datePublished":487,"description":488,"extension":182,"heading":489,"image":490,"imageAlt":355,"keywords":491,"locale":191,"meta":496,"navigation":193,"path":497,"reviewed":193,"seo":498,"sitemap":499,"slug":507,"stem":508,"translationKey":507,"__hash__":509},"blog\u002Fblog\u002Fhu\u002Fsheepherding-story-points.md","Nyájeffektus: horgonyzás a planning pokerben | AELBOX",{"type":9,"value":350,"toc":478},[351,357,360,364,371,379,383,387,390,393,400,404,407,411,414,419,423,427,430,437,441,445,448,453,457,461,472,475],[12,352,353],{},[15,354],{"alt":355,"height":18,"loading":19,"src":356,"width":21,"fetchPriority":22},"Juhnyáj és planning poker kártyák a dohányzóasztalon","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,358,359],{},"A story pointokkal való becslést gyakran elhanyagolják, vagy olyan csevegésekben és nyílt megbeszéléseken végzik, ahol mindenki látja vagy hallja az összes szavazatot. Ha ismert, hogyan szavaztak mások, az torzítja az eredményt, és pontatlan becsléseket ad. Az ismétlődő pontatlan becslések hibás tervekhez, valamint késő vagy elmaradt szállításokhoz vezetnek. Íme, mi történik nyílt szavazásnál.",[41,361,363],{"id":362},"a-szavazás-szereplői","A szavazás szereplői",[12,365,366,367,370],{},"A nyílt becslési szavazáson többféle szereplő is feltűnik. A becslés attól függ, ki szavaz elsőként, és általában messze van az őszintétől. Miért számít ennyire a sorrend egy nyílt szavazáson? A ",[268,368,369],{},"nyájeffektus"," miatt: a horgonyzási torzítás miatt a többi csapattag az első becslést másolja.",[12,372,373],{},[15,374],{"alt":375,"height":376,"loading":32,"src":377,"width":378,"decoding":34},"A nyájeffektus",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,380,381],{},[38,382,375],{},[65,384,386],{"id":385},"a-túlzottan-magabiztos-szavazó","A túlzottan magabiztos szavazó",[12,388,389],{},"Minden csapatban van legalább egy tag, aki azt hiszi, ő ismeri legjobban a rendszert. Általában ő szavaz elsőként, mert számára kézenfekvőnek tűnnek a válaszok. Gyakran figyelmen kívül hagyja azokat a részleteket, amelyek kisiklatják a becslést. Ezekre a részletekre előre is fény derülhet, de csak akkor, ha valaki elindít egy beszélgetést. Nyílt szavazáson erre nincs mód.",[12,391,392],{},"Ez a személy általában alacsonyabbat szavaz meg az őszinte becslésnél. Talán csak ő tudná ilyen gyorsan befejezni a történetet, és akkor is csak szerencsével.",[12,394,395],{},[15,396],{"alt":386,"height":397,"loading":32,"src":398,"width":399,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,401,402],{},[38,403,386],{},[12,405,406],{},"A többiek követik, így a feladat könnyűnek és bárki számára megvalósíthatónak tűnik a rendelkezésre álló idő alatt. A gyakorlatban általában mégis valaki más végzi el.",[65,408,410],{"id":409},"a-csendes-szavazó","A csendes szavazó",[12,412,413],{},"Általában több csendes szavazó is van, és félnek elsőként szavazni. Megvárják, hogy valaki más szavazzon, hogy lemásolhassák. Ritkán vesznek részt a beszélgetésben, és csak akkor válaszolnak, ha kérdezik őket. Másodikként szavaznak, éppen az érdektelen szavazók előtt.",[12,415,416],{},[15,417],{"alt":410,"height":397,"loading":32,"src":418,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,420,421],{},[38,422,410],{},[65,424,426],{"id":425},"az-érdektelen-szavazó","Az érdektelen szavazó",[12,428,429],{},"Nehéz őket elérni a megvalósítás során, de a szavazáskor nyilvánvaló a viselkedésük. Mindig utolsóként szavaznak, és valaki más becslését másolják. Ha eltérnek a becslések, a leggyakoribbat választják. Nem akarják megmagyarázni, miért választottak alacsonyabb vagy magasabb számot, ezért kerülik az együttműködést a refinement során, és kitérnek a kérdések elől.",[12,431,432],{},[15,433],{"alt":426,"height":434,"loading":32,"src":435,"width":436,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,438,439],{},[38,440,426],{},[65,442,444],{"id":443},"a-fáradt-szavazó","A fáradt szavazó",[12,446,447],{},"Néhány csapattag nem tud sokáig összpontosítani, és lemarad a beszélgetés kulcspontjairól. Elveszítik a kontextust, és vagy tippelnek, vagy a leggyakoribb szavazatot keresik, hogy lemásolják.",[12,449,450],{},[15,451],{"alt":444,"height":397,"loading":32,"src":452,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,454,455],{},[38,456,444],{},[41,458,460],{"id":459},"hogyan-tartsuk-fenn-a-figyelmet-a-becslés-során","Hogyan tartsuk fenn a figyelmet a becslés során",[12,462,463,464,468,469,471],{},"A becslés azért fontos, mert csak az őszinte story pointok ",[49,465,467],{"href":466},"\u002Fhu\u002Fblog\u002Fcorrectly-estimating-release-deadline","tartják a projektet a release-dátum felé vezető úton",". Az őszinte becslés kulcsa a ",[268,470,369],{}," ellensúlyozása, akár papírkártyákat, akár szoftvert használ.",[12,473,474],{},"A csapattagok soha ne lássák egymás becslését, amíg a moderátor fel nem fedi őket. Így a csendes szavazó elkezd gondolkodni, az érdektelen szavazó érdeklődni kezd, a fáradt szavazó pedig felébred. A legjobb kérdés, különösen ha valaki nem ért egyet a csoporttal: „miért X story pointot szavaztál?” Ez elindít egy beszélgetést a valódi megvalósítási problémákról. A zárt kérdések, például hogy „egyetértene X story pointtal?”, csak egy értelmetlen „igent” hívnak elő.",[12,476,477],{},"Egy jó becslőeszköz izgalmasabbá teszi a refinementet, és mindenkit éberen, kész beszélgetni tart, így még az összetett történetek is jobb becslést kapnak.",{"title":159,"searchDepth":160,"depth":160,"links":479},[480,486],{"id":362,"depth":160,"text":363,"children":481},[482,483,484,485],{"id":385,"depth":166,"text":386},{"id":409,"depth":166,"text":410},{"id":425,"depth":166,"text":426},{"id":443,"depth":166,"text":444},{"id":459,"depth":160,"text":460},"2018-04-30","A nyílt szavazásnál az első becslés horgonyt vet a csapatnak. Így torzítja a nyájeffektus a story pointokat, és így vezessünk őszinte planning pokert.","Nyájeffektus a story pointoknál","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[492,493,494,369,495],"story pointok","planning poker","horgonyzási torzítás","agilis becslés",{},"\u002Fblog\u002Fhu\u002Fsheepherding-story-points",{"title":348,"description":488},{"loc":497,"images":500,"lastmod":179},[501,502,503,504,505,506],{"loc":356},{"loc":377},{"loc":398},{"loc":418},{"loc":435},{"loc":452},"sheepherding-story-points","blog\u002Fhu\u002Fsheepherding-story-points","VWKjkHclVIX-88mpQScxwFRmhfFO0czJh5sFLdrqbNM",{"id":511,"title":512,"author":7,"body":513,"dateModified":179,"datePublished":586,"description":587,"extension":182,"heading":588,"image":589,"imageAlt":519,"keywords":590,"locale":191,"meta":595,"navigation":193,"path":596,"reviewed":193,"seo":597,"sitemap":598,"slug":603,"stem":604,"translationKey":603,"__hash__":605},"blog\u002Fblog\u002Fhu\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","A 10%-os Scrumban-szabály minden sprintre | AELBOX",{"type":9,"value":514,"toc":581},[515,522,530,534,537,545,549,553,556,560,563,566,574,578],[12,516,517],{},[15,518],{"alt":519,"height":520,"loading":19,"src":521,"width":21,"fetchPriority":22},"Planning poker kártyák és egy Kanban-tábla a dohányzóasztalon",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,523,524,525,529],{},"Sok csapat pontosan akkora kapacitással tervez, amekkora a Jira-tervében szerepel. Ez gyakran hiba, és elbukott sprintekhez vezet. Miért történik ez meg, amikor a ",[49,526,528],{"href":527},"\u002Fhu\u002Fblog\u002Fthe-importance-of-predictable-velocity","kapacitásszámítások"," olyan pontosnak tűnnek?",[41,531,533],{"id":532},"a-hajsza-a-több-szállításért","A hajsza a több szállításért",[12,535,536],{},"A Product Ownerek hajlamosak minden sikeres sprint után nagyobb sebességet sürgetni, ami természetes reakció a legutóbbi eredményekre. Ha a csapat az előző sprintben bizonyos számú story pointot teljesített, a következő sprintben többet várnak el tőle. Ez addig ismétlődik, amíg egy sprint el nem bukik. A sürgetés a csapat határainak feszegetése. Tapasztalataink szerint kontraproduktív. Végül demotiválja a csapatot, amely minden következő sprintet eleve halálra ítéltnek lát.",[12,538,539],{},[15,540],{"alt":541,"height":542,"loading":32,"src":543,"width":544,"decoding":34},"A halálra ítélt sprint",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,546,547],{},[38,548,541],{},[41,550,552],{"id":551},"a-sprint-kapkodós-vége-szállítási-hajrában","A sprint kapkodós vége szállítási hajrában",[12,554,555],{},"Ha a kapacitást úgy tervezik, hogy pontosan kitöltse a sprintet, bármilyen késés vagy bekövetkezett kockázat arra kényszeríti a csapatot, hogy a végén őrült tempóban dolgozzon. A csapat így kevesebbet szállít a vállaltnál, mert a stressz veszi át az irányítást. Ezt a sprint végi rohanást meg kell szüntetni.",[41,557,559],{"id":558},"hagyja-hogy-a-csapat-a-saját-akaratából-szállítson-többet","Hagyja, hogy a csapat a saját akaratából szállítson többet",[12,561,562],{},"A csapat kapacitásának csak 90%-át tervezze meg, a maradék 10%-ot pedig tartsa fenn nem tervezett backlog-munkára. Ezeket a munkatételeket a sprint során, Scrumban módra húzza ki a backlogból. A puffer elnyeli a kockázatot, és a csapat néhány nappal korábban befejezheti a sprintet (vagy legalább a sprintcélt). Ha külső függőség fenyegeti a sprintet, egy pufferelt munkatétel helyettesítheti a problémásat.",[12,564,565],{},"Ez a 10% nem része a sprintvállalásnak. Ha a kockázat nem következik be, a csapat többletmunkaként szállítja; ha valami félresikerül, a puffer elhasználódik, de a sprintcél és a vállalás továbbra is teljesül. Figyelje, mennyi fogy el a pufferből: ha rendszeresen eléri a 20%-ot, ideje 10%-kal növelni a csapat sebességét, miközben megtartja a 10%-os puffert.",[12,567,568],{},[15,569],{"alt":570,"height":571,"loading":32,"src":572,"width":573,"decoding":34},"Szállítson korán, szállítson többet",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,575,576],{},[38,577,570],{},[12,579,580],{},"Tapasztalataink szerint ekkor dolgoznak az emberek nyomás nélkül, és ekkor járulnak hozzá a legtöbbet. A sebesség így a csapat saját tempójában nőhet, külső nyomás nélkül és kevesebb stresszel. A növekedés természetesnek és fenntarthatónak érződik.",{"title":159,"searchDepth":160,"depth":160,"links":582},[583,584,585],{"id":532,"depth":160,"text":533},{"id":551,"depth":160,"text":552},{"id":558,"depth":160,"text":559},"2018-04-28","Ha a teljes kapacitásra vállalunk, minden sprint törékennyé válik. A 10%-os Scrumban-puffer elnyeli a kockázatot, védi a sprintcélt, és hagyja nőni a sebességet.","A 10%-os Scrumban-szabály minden sprintre","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[591,592,593,594,333],"scrumban","sprintkapacitás","agilis puffer","sebesség",{},"\u002Fblog\u002Fhu\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":512,"description":587},{"loc":596,"images":599,"lastmod":179},[600,601,602],{"loc":521},{"loc":543},{"loc":572},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fhu\u002Fthe-10-percent-scrumban-rule-for-every-sprint","zrmNfCPk0VgGldZBGz0Y_ev8OS-mbqw67iSHr9ooM80",{"id":607,"title":608,"author":7,"body":609,"dateModified":179,"datePublished":786,"description":787,"extension":182,"heading":788,"image":789,"imageAlt":615,"keywords":790,"locale":191,"meta":794,"navigation":193,"path":795,"reviewed":193,"seo":796,"sitemap":797,"slug":805,"stem":806,"translationKey":805,"__hash__":807},"blog\u002Fblog\u002Fhu\u002Fcorrectly-estimating-release-deadline.md","Hogyan becsüljük meg a release-határidőt? | AELBOX",{"type":9,"value":610,"toc":772},[611,617,620,624,631,635,638,646,650,654,657,660,664,667,675,680,684,687,691,694,698,701,708,712,716,719,723,726,734,738,742,745,750,757,765,769],[12,612,613],{},[15,614],{"alt":615,"height":18,"loading":19,"src":616,"width":21,"fetchPriority":22},"Planning poker kártyák, Gantt-diagram és egy kávéscsésze az asztalon","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,618,619],{},"A projektmenedzsment fontos része a projekt release-dátumának megbecslése. De hogyan jósolható meg, mikor készül el egy nagy, összetett rendszer?",[41,621,623],{"id":622},"a-becslés-problémái","A becslés problémái",[12,625,626,627,630],{},"A határidő tartásához megbízható becslés kell a munkáról. ",[49,628,629],{"href":527},"A feladatok becslése általában nehéz",", különösen akkor, ha minden feladathoz időalapú becslést kell vállalnia. Pszichológiailag nehéz egy befejezési időpontra elköteleződni, és ezek a vállalások gyakran megbuknak.",[65,632,634],{"id":633},"az-idő-problémája","Az idő problémája",[12,636,637],{},"Az idő becslése egyszerű okból problémás: minél összetettebb egy feladat, annál nagyobb az esélye, hogy lecsúszik a határidő. Az is számít, ki veszi fel a feladatot. A csapattagok eltérő tempóban dolgoznak, és eltérő mennyiségű munkát végeznek el. Mivel a rendelkezésre állás a szabadságokkal és a képzésekkel változik, előfordulhat, hogy egy feladatot a leggyorsabb csapattag becsült meg, mégis a leglassabbhoz kerül. A szép Gantt-diagram összeomlik: a feladatok határideje lejár, a vezetők pedig állandóan azon aggódnak, hogy időben elkészül-e a projekt.",[12,639,640],{},[15,641],{"alt":642,"height":643,"loading":32,"src":644,"width":645,"decoding":34},"Felborult Gantt-diagram",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,647,648],{},[38,649,642],{},[65,651,653],{"id":652},"az-időbecsléssel-szembeni-ellenállás","Az időbecsléssel szembeni ellenállás",[12,655,656],{},"Amikor a megvalósítókat becslésre kérik, gyakran ellenállnak: ha nem jön be a becslés, ki a hibás? És ha az egyik ember által becsült feladat végül valaki máshoz kerül, kit hibáztatnak, amikor másképp alakul az idő?",[12,658,659],{},"Az eredmény: a csapat vonakodik egyáltalán becsülni, ami megnehezíti a vezetés számára a szállítási dátumok megfelelő becslését.",[41,661,663],{"id":662},"story-pointok-használata","Story pointok használata",[12,665,666],{},"A story pointok alternatívát kínálnak az időalapú becsléssel szemben. A story point nem fix munkaegység; relatív becslés, amely exponenciálisan nő. A teljes csapat közösen becsül a refinement során.",[12,668,669],{},[15,670],{"alt":671,"height":672,"loading":32,"src":673,"width":674,"decoding":34},"Példa story pointok",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,676,677],{},[38,678,679],{},"Példa becslések",[65,681,683],{"id":682},"a-felelősség-megosztása","A felelősség megosztása",[12,685,686],{},"A story pointokkal a teljes csapat becsül minden feladatot. A becslés akkor elfogadott, ha mindenki egyetért vele. Így később nincs vita arról, ki becsülte a feladatot, és mennyi ideig tartott valójában. A csapat előre egyetértett, tehát a felelősség közös.",[65,688,690],{"id":689},"a-komplexitás-becslése","A komplexitás becslése",[12,692,693],{},"A story pointok egy feladat komplexitását ragadják meg, beleértve a külső függőségeket és annak kockázatát, hogy valami félremehet. Mivel nem jelentenek elköteleződést egy fizikai mértékegység, például az idő mellett, könnyebb a csapatnak megadni őket.",[65,695,697],{"id":696},"a-legkisebb-becslés","A legkisebb becslés",[12,699,700],{},"Mivel a story pointok relatívak, kell egy viszonyítási pont, ahonnan indulni lehet. A viszonyítási pont az a legkisebb munkaegység, amely némi megvalósítási ráfordítást igényel. Ez a legkisebb munka, amelyet a csapat becsülni tud.",[12,702,703],{},[15,704],{"alt":697,"height":705,"loading":32,"src":706,"width":707,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,709,710],{},[38,711,697],{},[65,713,715],{"id":714},"a-legnagyobb-becslés","A legnagyobb becslés",[12,717,718],{},"A story pointok exponenciálisan nőnek, hogy mutassák: minél összetettebb egy feladat, annál nehezebb becsülni. A skála a végtelenig (∞) terjedhet, bár ezt a becslést ritkán használják. A legnagyobb becslés az a legnagyobb munka legyen, amelyet egy ember átlagosan egy sprintben el tud végezni. Maga a sprint hossza is illeszkedjen ahhoz a legnagyobb munkamennyiséghez, amelyet egy ember úgy tud kezelni, hogy ne veszítse el a feladat feletti kontrollt.",[65,720,722],{"id":721},"a-legnagyobb-becslésnél-is-nagyobb-történetek","A legnagyobb becslésnél is nagyobb történetek",[12,724,725],{},"Néhány feladat több story pointot kap, mint amennyit egy ember egy sprintben el tud végezni. Ha ilyen feladat bekerül a sprintbe, áthúzódás lesz belőle. Az áthúzódás miatt a sprint befejezetlennek, a munka félbemaradtnak tűnik. Az e határ felett becsült feladatokat kisebb egységekre kell bontani, és újra kell becsülni.",[12,727,728],{},[15,729],{"alt":730,"height":731,"loading":32,"src":732,"width":733,"decoding":34},"13 story point felbontása",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,735,736],{},[38,737,730],{},[41,739,741],{"id":740},"a-story-pointokon-alapuló-sebesség","A story pointokon alapuló sebesség",[12,743,744],{},"A sebesség az átlagos story pointszám, amelyet a csapat egy sprintben, teljes rendelkezésre állás mellett elér. A rendelkezésre állás a sprint azon része, amelyet a csapat a szabadságok, a képzések és a támogatás után ténylegesen projektmunkára fordíthat. A kapacitás a sebesség és a rendelkezésre állás szorzata.",[12,746,747],{},[38,748,749],{},"kapacitás = sebesség × rendelkezésre állás",[12,751,752,753,756],{},"Mivel a kapacitás story pointban van kifejezve, a csapat story point és idő közötti arányának segítségével időre váltható át. Ha ",[49,754,755],{"href":527},"a sebesség kiszámítható",", a release-dátum pontosan becsülhető. A story pointokra és sprintekre épülő Gantt-diagram stabil és kiszámítható:",[12,758,759],{},[15,760],{"alt":761,"height":762,"loading":32,"src":763,"width":764,"decoding":34},"Rendezett Gantt-diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,766,767],{},[38,768,761],{},[12,770,771],{},"Ez a fordulat: amint a sebesség stabil, a release-dátum számítás lesz, nem tippelés.",{"title":159,"searchDepth":160,"depth":160,"links":773},[774,778,785],{"id":622,"depth":160,"text":623,"children":775},[776,777],{"id":633,"depth":166,"text":634},{"id":652,"depth":166,"text":653},{"id":662,"depth":160,"text":663,"children":779},[780,781,782,783,784],{"id":682,"depth":166,"text":683},{"id":689,"depth":166,"text":690},{"id":696,"depth":166,"text":697},{"id":714,"depth":166,"text":715},{"id":721,"depth":166,"text":722},{"id":740,"depth":160,"text":741},"2018-04-14","Az időbecslés elbukik, ha a komplexitás és a rendelkezésre állás változik. A story pointok, a közös becslés és a sebesség kiszámíthatóvá teszi a release-dátumot.","Hogyan becsüljük meg a release-határidőt","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[791,492,495,792,793],"release-határidő","sprintsebesség","kapacitástervezés",{},"\u002Fblog\u002Fhu\u002Fcorrectly-estimating-release-deadline",{"title":608,"description":787},{"loc":795,"images":798,"lastmod":179},[799,800,801,802,803,804],{"loc":616},{"loc":644},{"loc":673},{"loc":706},{"loc":732},{"loc":763},"correctly-estimating-release-deadline","blog\u002Fhu\u002Fcorrectly-estimating-release-deadline","Jr9_xKcdJZQJHKz7R8WByjA6ybiY3uweBJCG7MOSRLM",{"id":809,"title":810,"author":7,"body":811,"dateModified":179,"datePublished":786,"description":957,"extension":182,"heading":958,"image":959,"imageAlt":817,"keywords":960,"locale":191,"meta":963,"navigation":193,"path":964,"reviewed":193,"seo":965,"sitemap":966,"slug":972,"stem":973,"translationKey":972,"__hash__":974},"blog\u002Fblog\u002Fhu\u002Fthe-importance-of-predictable-velocity.md","Kiszámítható sebesség: megbízható sprintvállalások | AELBOX",{"type":9,"value":812,"toc":947},[813,819,822,826,829,832,835,843,847,851,854,858,861,864,871,878,882,886,889,892,895,898,902,905,908,915,919,923,931,934,938,944],[12,814,815],{},[15,816],{"alt":817,"height":18,"loading":19,"src":818,"width":21,"fetchPriority":22},"Planning poker kártyák és egy stopperóra a dohányzóasztalon","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,820,821],{},"A kiszámítható sebesség azt jelenti, hogy előre tudható, mennyi munkát fog elvégezni egy csapat egy adott időszakban, a rendelkezésre állása alapján.",[41,823,825],{"id":824},"a-változó-sebesség-problémája","A változó sebesség problémája",[12,827,828],{},"Amikor a sebesség sprintek között ingadozik, a release tervezése nehézzé válik. Senki nem tudja, mikor készül el a munka, és az egész Scrum-folyamat felborul. A káosz veszi át az irányítást, ami a csapat hangulatának sem tesz jót.",[12,830,831],{},"A változó sebesség általában abból fakad, hogy a csapattagok a legjobbat akarják nyújtani, és többet vállalnak, mint amit teljesíteni tudnak. Egy jól felállított fejlesztési folyamattal rendelkező, együttműködő környezetben egy feladat többet jelent a kézenfekvő implementálásnál. Néhány csapattag szerencsés, és viszonylag egyszerűen megvalósítható feladatokat kap, mások viszont olyan problémába futnak, amelyre senki nem számított. Az egyik sprintben magasnak tűnik a sebesség, mert a csapat éppen az áthúzódó munkatételeket fejezi be; a következőben visszaesik, mert újabb áthúzódó munkatételek jelennek meg.",[12,833,834],{},"Az áthúzódó munkatételek azt a benyomást keltik, hogy a csapat alulteljesít: többet is tudna, de mindig közbejön valami kiszámíthatatlan. A vezetés észreveszi a problémát, látja a lecsúszott határidőket, és a feszültség nő a csapattagok között.",[12,836,837],{},[15,838],{"alt":839,"height":840,"loading":32,"src":841,"width":842,"decoding":34},"Egy tipikus sprint áthúzódó munkatételekkel",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,844,845],{},[38,846,839],{},[41,848,850],{"id":849},"a-kiszámíthatóság-fenntartásának-gyakori-problémái","A kiszámíthatóság fenntartásának gyakori problémái",[12,852,853],{},"A problémák projektenként változnak, de sok minden projekttípusban közös. Íme a szokásos esetek, gyakorlati megoldásokkal.",[65,855,857],{"id":856},"számítson-a-váratlanra","Számítson a váratlanra",[12,859,860],{},"Van, hogy egy feladat csak kutatás után indítható. Képzeljen el egy funkciót, amely egy harmadik fél cégtől függ, és az nem feltétlenül válaszol, amikor szükség lenne rá. Vagy egy funkciót, amely nem valósítható meg a tervek szerint, mert a csapat a feladat létrehozásakor félreértette a mögöttes technológiát.",[12,862,863],{},"Ha egy ilyen feladat a szükséges kutatás nélkül kerül be egy sprintbe, valószínűleg a vártnál tovább tart, és a becslést fogják hibáztatni. Sokan azt mondanák, hogy előbb egy spike kell a téma kutatásához. De honnan tudja, melyik feladathoz kell ilyen?",[12,865,866,867,870],{},"Az egyetlen út, ha ",[49,868,869],{"href":301},"előre elkezd dolgozni a feladaton",". Ha a tervezés előtt kezdi el, a problémákat még a felmerülésük előtt megtalálhatja. Ezzel a megközelítéssel egy feladat csak akkor kerül be a sprintbe, amikor már tiszta, és a munka egy része el is készült.",[12,872,873],{},[15,874],{"alt":875,"height":840,"loading":32,"src":876,"width":877,"decoding":34},"Sprintek előre elkezdett feladatokkal","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,879,880],{},[38,881,875],{},[65,883,885],{"id":884},"kerülje-a-homályos-feladatmeghatározásokat","Kerülje a homályos feladatmeghatározásokat",[12,887,888],{},"Egyes feladatok a létrehozójuknak elfogadhatónak tűnnek, de fontos részleteket hagynak ki. Bizonyos megvalósítási részletek komoly hatással lehetnek a szállításra.",[12,890,891],{},"Az üzleti érintettek érvelhetnek azzal, hogy a feladatmeghatározás ne tartalmazzon technikai részleteket, a megvalósítók viszont gyakran túl homályosnak találják az üzleti követelményeket ahhoz, hogy dolgozni tudjanak velük.",[12,893,894],{},"A megoldás egy technikai tervezési dokumentum, amelyre a megvalósítási feladat hivatkozik. Így világos, hogy pontosan mit kell megépíteni.",[12,896,897],{},"Az is segít, ha a feladatleírás technikai részleteket is tartalmaz, így a megvalósítók tudják, mi a teendő, és korán észrevehetik a lehetséges problémákat.",[65,899,901],{"id":900},"kapacitáscsökkentés-a-fibonacci-sorozattal","Kapacitáscsökkentés a Fibonacci-sorozattal",[12,903,904],{},"Előfordul, hogy a csapattagok szabadságra mennek, vagy munkaszüneti nap esik a sprintbe. A képzések és a belső események szintén csökkentik a rendelkezésre állást: azt az időt, amelyet a csapat a projektmunkára fordíthat. Ilyenkor a kapacitást a hiányzó emberekhez kell igazítani.",[12,906,907],{},"A sebességet állandónak vesszük, de a csapat minden tagjának átlagsebességéből számoljuk. Az egyszerűség kedvéért tegyük fel, hogy egy ember naponta egy story pointot teljesít. Ha egy ember egy napig hiányzik, csökkentse a sprint kapacitását egy story pointtal. Ha két ember két napig hiányzik (négy story point), a kapacitást öt story pointtal csökkentse (a következő Fibonacci-számmal), ne néggyel. Ha két ember három napig hiányzik, nyolc ponttal csökkentsen hat helyett, hogy a függőségi kockázatot is ellensúlyozza.",[12,909,910],{},[15,911],{"alt":912,"height":840,"loading":32,"src":913,"width":914,"decoding":34},"Kevesebb kapacitás vállalása a kiszámítottnál","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,916,917],{},[38,918,912],{},[65,920,922],{"id":921},"kerülje-a-függő-feladatokat","Kerülje a függő feladatokat",[12,924,925,926,930],{},"Gyakori, hogy az egyik ember olyan feladatot végez el, amelytől egy másik csapattag feladata függ. Így alakulnak ki a ",[49,927,929],{"href":928},"\u002Fhu\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","csapaton belüli vagy csapatok közötti függőségek",". Ha az első feladat késik, minden függő feladat csúszik. A csapattagok tétlenül várnak, majd rohanni kezdenek, amikor a függőség megszűnik, és értékes időt veszítenek.",[12,932,933],{},"A függő feladatokat korábban is el lehet kezdeni, így a következő sprintre a kritikus, megelőző feladatok szinte elkészülnek. Ez csökkenti a függőség hatását a sebességre az aktuális sprintben.",[65,935,937],{"id":936},"becsüljön-őszintén","Becsüljön őszintén",[12,939,940,943],{},[49,941,942],{"href":287},"A feladatok őszinte becslése"," nehéz, és az egész csapat figyelmét igényli. Mindenkinek anélkül kell becsülnie, hogy a többiek becslése befolyásolná. Csak az őszinte becslések mutatják meg, mennyi ideig tart valójában egy epic, és tartják reális keretek között a release-dátumot.",[12,945,946],{},"A kiszámítható sebesség nem olyan eszköz vagy mutató, amelyet ráerőltetünk a csapatra; a meglepetések egyenkénti felszámolásából születik. Kezdje az öt fenti megoldással, és a release-dátum többé nem tippelés lesz.",{"title":159,"searchDepth":160,"depth":160,"links":948},[949,950],{"id":824,"depth":160,"text":825},{"id":849,"depth":160,"text":850,"children":951},[952,953,954,955,956],{"id":856,"depth":166,"text":857},{"id":884,"depth":166,"text":885},{"id":900,"depth":166,"text":901},{"id":921,"depth":166,"text":922},{"id":936,"depth":166,"text":937},"Miért ingadozik a sebesség a sprintek között, és hogyan lesznek a vállalások kiszámíthatók: öt gyakorlati megoldás tervezésre, kapacitásra és függőségekre.","A kiszámítható sebesség fontossága","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[961,792,495,492,962],"kiszámítható sebesség","release-tervezés",{},"\u002Fblog\u002Fhu\u002Fthe-importance-of-predictable-velocity",{"title":810,"description":957},{"loc":964,"images":967,"lastmod":179},[968,969,970,971],{"loc":818},{"loc":841},{"loc":876},{"loc":913},"the-importance-of-predictable-velocity","blog\u002Fhu\u002Fthe-importance-of-predictable-velocity","fUDi4grZHsBpvPDvIbyxWptdNG7hdqli4E6YSFJ3WrI",1795345549030]