[{"data":1,"prerenderedAt":2127},["ShallowReactive",2],{"guide-en-capacity-planning":3},{"doc":4,"prev":997,"next":1347,"related":1970,"reading":2118},{"id":5,"title":6,"body":7,"dateModified":976,"datePublished":977,"description":978,"extension":979,"heading":49,"image":980,"imageAlt":49,"keywords":981,"locale":985,"meta":986,"navigation":987,"order":988,"path":989,"section":990,"seo":991,"sitemap":992,"slug":993,"stem":994,"translationKey":995,"__hash__":996},"guide\u002Fguide\u002Fen\u002Fcapacity-planning.md","Capacity planning | Scrumpy Planning Poker",{"type":8,"value":9,"toc":959},"minimark",[10,14,22,25,44,78,83,88,101,104,118,125,131,138,142,145,149,206,218,221,224,227,235,249,252,259,266,294,307,310,315,326,335,341,347,367,371,377,397,400,416,420,426,429,432,458,461,471,474,480,483,487,523,529,532,535,570,573,586,593,596,600,605,637,640,644,647,667,673,677,705,761,767,771,780,786,790,798,802,810,830,833,837,840,866,872,888,891,917,920,923,927,956],[11,12,13],"p",{},"Capacity planning helps a Scrum team decide how much work fits into the next sprints. Scrumpy looks at the estimates your team completed in recent sprints. That average per team member is your velocity. A board that estimates in story points uses story points, and a board that estimates in time uses the original time estimates and shows them as durations such as 2 days, 4 hours. Capacity uses the estimation field configured on the selected board. If the space also has another story point field, the board's field is the one that counts.",[11,15,16,17,21],{},"Scrumpy then compares the work already planned for the next sprints with the capacity your team really has. The target capacity for a current or future sprint is that per-member velocity multiplied by the sprint's team size and adjusted by the team's utilization and time off. The ",[18,19,20],"strong",{},"Deviation"," dropdown sets how far the plan may differ from the target before a badge turns green or red. The working week settings decide which days count as working days and how many hours a full working day counts for.",[11,23,24],{},"In the Capacity planning tab you can:",[26,27,28,32,35,38,41],"ul",{},[29,30,31],"li",{},"Add the closed sprints that set your velocity and the active or future sprints you want to plan.",[29,33,34],{},"See every sprint and its work items in one table, with the estimated total and the target range.",[29,36,37],{},"Adjust each team member's utilization and working hours for the sprint.",[29,39,40],{},"Rank the work items, or open a perspective tab and vote on them.",[29,42,43],{},"Apply the plan to Jira, or archive a sprint to Confluence.",[11,45,46,47,50,51,54,55,58,59,62,63,66,67,70,71,73,74,77],{},"Capacity belongs to a planning session. Open the ",[18,48,49],{},"Capacity planning"," tab on the space page and choose a planning session tab. When the session you last opened is no longer available, the first planning session opens instead. The ",[18,52,53],{},"Create"," button creates a planning session without leaving the tab. The planning session description, when one is set, appears at the top of the left side above the board selector and spans only the left side, so the right side starts higher and the tables line up. A moderator can click the description to change it in place, and it saves when the field loses focus with no ",[18,56,57],{},"OK"," or ",[18,60,61],{},"Cancel"," buttons. The same planning sessions also appear on the ",[18,64,65],{},"Standup"," and ",[18,68,69],{},"Retrospective"," tabs, where you can run a sprint standup or retrospective. See the Sprint standups and Sprint retrospectives guides. When no description is set, a moderator sees a placeholder they can click to add one. Each board in the planning session keeps its own planned sprints, selected sprint, selected work item, selected team member, and open right-side tab. Switching boards does not clear another board's choices, and switching back restores them. The switch happens at once: the board's saved sprint, work item, and team member selection and its estimation unit change immediately, and the previous board's sprints are hidden while the new board loads. A board you already opened in this tab shows its sprints immediately and refreshes in the background. When the space page opens on the ",[18,72,49],{}," tab, the tab loads its boards and sprints together with the planning session tabs, so the table appears in one step. If you open the tab later, it loads its boards and sprints when you select it. If the space has no Scrum board, the tab tells you that a Scrum board is needed. A new planning session starts with no sprints, so add the sprints you want to plan with ",[18,75,76],{},"Plan sprint",".",[11,79,80],{},[18,81,82],{},"Everything you change on this screen is virtual: the sprints, the order, the team capacity, and the work item moves stay in Scrumpy. Jira changes only when you select Apply.",[84,85,87],"h2",{"id":86},"plan-the-sprints","Plan the sprints",[11,89,90,91,93,94,97,98,77],{},"Only the sprints you add to the selected board's view appear in the table. Select ",[18,92,76],{},", next to ",[18,95,96],{},"Add from filter"," in the toolbar, to open the sprint picker. The picker shows only sprints whose origin board is the board selected in the action bar. Sprints that originated on another board are not listed and cannot be added. Each sprint's estimate appears in a regular lozenge, for example ",[18,99,100],{},"3 sp",[11,102,103],{},"The picker has two tabs:",[26,105,106,112],{},[29,107,108,111],{},[18,109,110],{},"Past sprints"," lists closed sprints. Past sprints with a saved team are needed to calculate the velocity. Select at least 3 past sprints for a proper velocity calculation. If you select fewer, the velocity is calculated from the ones you selected. A past sprint with no team yet shows 0% in the Team column and does not count; select it and populate its team first.",[29,113,114,117],{},[18,115,116],{},"Sprints"," lists active and future sprints. Select at least one of them before you can add the selection.",[11,119,120,121,124],{},"Both tabs list their sprints by start date, oldest first. Each row has a checkbox, the sprint name with its goal below it, its status, its start and end dates, and its estimate. The sprint column is headed ",[18,122,123],{},"Sprint",", because each row is one sprint. The estimate is the completed estimate for a past sprint and the currently allocated estimate for an active or future sprint. On a time board the estimate appears as a badge. The start and end dates are read only.",[11,126,127,128,130],{},"Use the checkbox in the header to select every sprint that is currently listed in the tab. Above the table on the right, the search box filters the sprints by name. The ",[18,129,110],{}," tab also has a dropdown that chooses how many of the most recent closed sprints to show: 3, 6, or 9. The default is 3. The choice is remembered in this browser tab.",[11,132,133,134,137],{},"Sprints that are already in the planning session appear checked and cannot be selected again. ",[18,135,136],{},"Add"," is enabled only when at least one active sprint is selected. Past sprints are optional.",[84,139,141],{"id":140},"read-the-sprints","Read the sprints",[11,143,144],{},"The left side shows the combined sprint table. Sprint rows and work item rows share the same columns, so every value lines up vertically:",[146,147],"docs-figure",{"alt":49,"caption":49,"stem":148},"guide-capacity",[26,150,151,157,163,172,181,187,192],{},[29,152,153,156],{},[18,154,155],{},"Type"," shows the sprint icon on a sprint row and the work item type icon on a work item row. The column header uses the work-item icon.",[29,158,159,162],{},[18,160,161],{},"Priority"," shows the work item's Jira priority icon in its Jira color. Sprint rows leave it empty. The column header uses the priority-medium icon.",[29,164,165,168,169,171],{},[18,166,167],{},"Sprint \u002F Work item"," shows the sprint name in bold, which opens the sprint in Jira in a new tab, or the work item key. A sprint goal appears in small text below the sprint name and stays on one line: a goal that is too long is shortened with an ellipsis. Moderators edit the goal in the ",[18,170,123],{}," tab.",[29,173,174,177,178,180],{},[18,175,176],{},"Rank"," shows the saved ordinal rank of each work item in its sprint. Current and future sprint rows show a moderator-only customize button instead, and a work item without a rank shows 0. The column appears only when you select ",[18,179,176],{}," in the columns dropdown. Everyone sees the saved numbers read only.",[29,182,183,186],{},[18,184,185],{},"Status"," shows the sprint state on a sprint row. On a work item row it shows the work item's Jira status until the work item starts. An In Progress work item shows its completion percentage instead. On a story point board moderators edit it. On a time board it is read only and derived from the time spent divided by the original time estimate. A Done work item shows a read-only 100%. To Do work items keep their Jira status.",[29,188,189,191],{},[18,190,20],{}," shows values only on sprint rows that have a deviation. Work item rows and sprints without a deviation leave it empty.",[29,193,194,197,198,201,202,205],{},[18,195,196],{},"SP"," on a story point board and ",[18,199,200],{},"Time"," on a time board shows the allocated estimate on a sprint row and the estimate on a work item row. Story point values end with ",[18,203,204],{},"sp",". Time values are original time estimates shown as work-day durations such as 2 days, 4 hours. A work item with no estimate leaves the cell empty.",[11,207,208,209,211,212,214,215,217],{},"The ",[18,210,176],{},", ",[18,213,185],{},", and ",[18,216,20],{}," columns are centered, and the estimate column is right aligned. These columns take only the width their content needs. Scrumpy reads the estimate through Jira's board estimation, so the value and the timeline appear even when the estimation field is hidden from the work item screen. A work item saved in a sprint plan but hidden from you by Jira issue-level security stays out of the table, the rank list, and the removed list, so the plan never reveals it. Only the sprint row whose radio button is selected is highlighted, and this includes a selected closed sprint. Work item rows are highlighted the same way: only the work item whose radio button is selected is highlighted, and no work item row is highlighted while none is selected. Selecting a work item also selects its parent sprint row, so the team table and the right side follow that sprint.",[11,219,220],{},"Moderators see the capacity timeline in the first column and the bulk selection checkboxes in the second column. Non-moderators see the moderator selection column first, with the capacity timeline second. Each active or future sprint row starts the timeline with a hollow circle, each work item row has a circle, and the last work item row in the sprint ends it with a hollow circle. Closed sprints have no timeline, and the table header has no line. The line and circles use the cumulative estimate from the first work item through the current row, with the estimate total and both range bounds rounded to whole story points, or to the nearest hour on a time board: green below the rounded target capacity minus the deviation, yellow inside the rounded range including both ends, and red above the rounded target capacity plus the deviation. The target capacity is the per-member velocity multiplied by the selected team's size and adjusted by its capacity for that sprint.",[11,222,223],{},"Active and future sprint rows show their allocated estimate as a colored badge using the same rounded bands. Closed sprint rows show their completed estimate with the completion bands described below.",[11,225,226],{},"A current or future sprint row is followed directly by that sprint's work items, so every work item stays grouped under its sprint. A closed sprint row has no work items below it.",[11,228,229,230,58,232,234],{},"When a moderator accepts an estimate in a perspective tab, the ",[18,231,196],{},[18,233,200],{}," value changes right away on the work item row and on its sprint row. Everyone with the tab open sees the new value without reloading. If the accepted work item belongs to a closed sprint, that sprint's totals and the velocity used for the targets are recalculated.",[11,236,237,238,211,241,244,245,248],{},"Each sprint row shows its state: ",[18,239,240],{},"Closed",[18,242,243],{},"Current"," for the sprint that is running now, or ",[18,246,247],{},"Future",". Select a sprint name to open that sprint in Jira in a new tab. A past sprint opens its sprint report, and the current or a future sprint opens the board backlog.",[11,250,251],{},"Use the radio button beside any sprint, including a closed one, to select it. The selected sprint drives the team table. Selecting a work item selects its parent sprint too.",[11,253,254,255,258],{},"Use the checkbox on a sprint row to select the whole sprint. When at least one sprint is checked, ",[18,256,257],{},"Remove"," asks you to confirm before it removes the sprints, together with their work items, from this capacity plan. Jira is not changed. Their draft plans and team settings stay with the planning session and come back if you add the sprint again. The header checkbox still selects work items only. Bulk selection checkboxes are available to moderators only, and checking a row is never shared with other participants or saved with the planning session.",[11,260,261,262,265],{},"Non-moderators see a yellow ",[18,263,264],{},"M"," badge in that first column instead. It marks the sprint and the work item that the moderator has selected. The badge stays visible whether you follow the moderator or view another sprint or work item locally, so the moderator's place is always clear.",[11,267,268,269,271,272,274,275,277,278,281,282,211,285,214,287,290,291,293],{},"Above the combined table, the Scrum board selector sits at the top left, while the columns and ",[18,270,20],{}," dropdowns sit at the top right. The columns dropdown is available to everyone. It starts with ",[18,273,20],{}," selected. Select ",[18,276,176],{}," to add the Rank column before Status, select ",[18,279,280],{},"Utilization"," to show the Utilization column in the team capacity table, and clear an option to hide its column. A moderator shares the visible columns with everyone who is locked to the moderator. If you pick another selection while you are locked, you detach and keep your own choice in this browser tab. Moderators can change the board and deviation, and non-moderators see the same values read only. The board choice is remembered with the planning session. Selecting another board applies that board and its saved view at once, and the table shows the new board's sprints or its loading state instead of the previous board's rows. Each board keeps its own sprint selection. The board list groups boards under ",[18,283,284],{},"Story points",[18,286,200],{},[18,288,289],{},"No estimation",". Boards without an estimation field appear under ",[18,292,289],{}," and are disabled. The sprint table lists the selected sprints by their start date, oldest first.",[11,295,296,297,299,300,303,304,77],{},"To the right of the ",[18,298,20],{}," dropdown, the app switcher button opens ",[18,301,302],{},"Refinement\u002Fgrooming"," on the same planning session tab. Its tooltip says ",[18,305,306],{},"Switch to refinement\u002Fgrooming",[11,308,309],{},"The velocity is the average completed estimate per team member across the selected closed sprints that have a saved team. On a time board the completed estimate is the original time estimate of the Done work items. Each closed sprint contributes its completed estimate divided by its effective team size: two people at 50% count as one person, and a 2-person team that completed 10 points contributes 5 points per member. The per-member values are then averaged, so a sprint with a bigger team does not outweigh a sprint with a smaller team. A closed sprint with no saved team shows 0% in the Team column and does not count towards the velocity until you populate its team. Adjusting a closed sprint's team size or team capacity changes its contribution and the velocity. The table updates the closed sprint's Team value, the velocity, and every future target as soon as you change a team member's capacity or membership, before the save finishes. If the save fails, the previous values return. The target for an active or future sprint is the per-member velocity multiplied by that sprint's effective team size, which is its headcount adjusted by utilization and time off. For example, 10 points with 2 people and 15 points with 4 people average 4.375 points per member, so a sprint with 3 people at full capacity targets 13.125 points. The timeline and the allocated estimate badges compare the planned estimate with that target, not with the velocity.",[11,311,208,312,314],{},[18,313,20],{}," column shows only a signed estimate badge, rounded to whole story points, or to the nearest hour on a time board. For a closed sprint, the value is the difference between completed and allocated estimate: negative when less was completed and positive when more was completed. For an active or future sprint, it compares the target capacity with the remaining estimate after completion instead: positive when the remaining estimate is below the target and negative when it is above it. The percentage is not displayed.",[11,316,317,318,197,320,322,323,325],{},"The estimate column is ",[18,319,196],{},[18,321,200],{}," on a time board. It shows the completed estimate on a closed sprint row, the allocated estimate on an active or future sprint row, and the estimate of the work item on a work item row. Story point values end with ",[18,324,204],{},". Time values are original time estimates shown as work-day durations such as 2 days, 4 hours. Work item estimates use the same green, yellow, and red bands as the timeline, calculated from the rounded cumulative remaining estimate through that row. Active and future sprint badges use the same rounded target bands from the remaining estimate: green below the range, yellow inside it, and red above it. Closed sprint badges compare the rounded completed estimate with the rounded allocation range: red below it, yellow inside it up to but not including the upper bound, and green at or above the upper bound. All three uses derive their lower and upper bounds from the same rounded healthy-range calculation. Active and future sprint rows show only that one estimate badge in the column.",[11,327,328,329,331,332,334],{},"For an active or future sprint, an In Progress work item shows its completion percentage in the ",[18,330,185],{}," column. On a story point board moderators can change it and everyone else sees it read only. On a time board it is always read only and derived from the time spent divided by the original time estimate. The derived value is rounded to a whole percent and stays between 0 and 100, so time spent above the original estimate counts as 100% and a missing original estimate counts as 0%. A Done work item shows a read-only 100%. To Do work items have no completion field. On a story point board the percentage is saved with the planning session and is never written to Jira. The remaining estimate is the item estimate reduced by its completion, so 2 sp at 50% counts as 1 sp, and on a time board 2 days at 50% counts as 1 day. A Done item counts as 0 remaining. The estimate column still shows the original allocated estimate on sprint and work item rows, while the ",[18,333,20],{}," and timeline use the remaining estimate. Manual completion does not change the velocity.",[11,336,208,337,340],{},[18,338,339],{},"Team"," column after the estimate column shows the team capacity percentage used for the sprint. Active and future sprints, and closed sprints with team members, show the capacity calculated from those members' working time and utilization. The value is read only. A closed sprint with no saved team shows 0% and does not count towards the velocity, and a saved team with no effective capacity also shows 0%. Work item rows leave the Team cell empty.",[11,342,343,344,346],{},"Use the ",[18,345,20],{}," dropdown to allow 0%, 5%, 10%, 15%, 20%, or 25% deviation from the target. The deviation badge uses the regular style when the absolute deviation percentage is within that tolerance. Above the tolerance, a positive deviation is green and a negative deviation is red. The chosen deviation is saved with the planning session's capacity data.",[11,348,349,350,354,355,358,359,362,363,366],{},"Below the table, a right-aligned summary reads \"Team is at ",[351,352,353],"span",{},"capacity"," capacity and velocity of ",[351,356,357],{},"velocity",", aiming to complete ",[351,360,361],{},"target"," at healthy range of ",[351,364,365],{},"range","\", with the capacity and velocity shown as information badges. The capacity is the selected team's capacity percentage rounded to a whole number, and the velocity is the per-member velocity multiplied by the selected sprint's team size, so it is the full-capacity velocity of that team. The target appears as an information badge with the target capacity rounded to whole story points, or to the nearest hour on a time board. The healthy range uses two information badges, one for the lower bound and one for the upper bound, separated by a dash. Both bounds are the same rounded values used by the timeline and the estimate badges. For example, a 10% deviation around 20.4 sp shows 18 sp - 22 sp, and around 2 days, 4 hours shows 2 days, 2 hours - 2 days, 6 hours. When both ends round to the same value, a single badge shows that value.",[84,368,370],{"id":369},"work-items-and-drag-and-drop","Work items and drag and drop",[11,372,373,374,376],{},"The work item rows below a sprint use the same columns as the sprint rows. The ",[18,375,185],{}," column shows the work item's own Jira status.",[26,378,379,382,388,391,394],{},[29,380,381],{},"Use the radio button on a work item to select it. The selection is remembered with the planning session. Its parent sprint row is selected with it.",[29,383,384,385,387],{},"Use the checkboxes to select work items for ",[18,386,257],{},". The header checkbox selects every work item in the table, across every sprint.",[29,389,390],{},"Use the checkbox on a sprint row to remove that sprint from the planning session, as described above. Sprint checkboxes are separate from the work item header checkbox.",[29,392,393],{},"Drag a work item to reorder it inside its sprint, or drag it onto another sprint row to move it into that sprint.",[29,395,396],{},"Closed sprints are history only, so they have no work items to drag.",[11,398,399],{},"The selection controls store their choice with the selected board's view. Only moderators can change the shared selections. The selected sprint, work item, team member, and right-side tab are remembered with the board view.",[11,401,402,403,406,407,211,409,211,411,214,413,415],{},"Non-moderators see a ",[18,404,405],{},"Lock to moderator"," checkbox below the table. It is checked by default, so your view follows the moderator's sprint, work item, team member, visible columns, and right-side tab. It follows the moderator between ",[18,408,302],{},[18,410,49],{},[18,412,65],{},[18,414,69],{}," for the same planning session. It applies to the planning tab you are on: switching to another planning tab yourself clears it, so you start detached on the new tab. Clear the checkbox to stay on the current view, then choose a sprint, work item, team member, column selection, or tab to look at without changing what anyone else sees. Choosing one clears the lock automatically. Select the checkbox again to return to the moderator's view. The lock is remembered in this browser tab while you stay on the tab. Your local choices stay with the tab where you made them, and they never change what the moderator or other participants see.",[84,417,419],{"id":418},"rank-the-work-items","Rank the work items",[11,421,422,423,425],{},"Select ",[18,424,176],{}," in the columns dropdown to show the Rank column. The column sits before Status and uses only the width its numbers need. A work item without a rank shows 0. Each planning session you open loads its capacity data. Switching to another planning session loads it once, and returning to one you already opened shows its data right away.",[11,427,428],{},"On every current or future sprint row, moderators see a customize button in the Rank cell. Select it to open the ranking dialog for that sprint. Closed sprint rows and the view that non-moderators see have no button.",[11,430,431],{},"The dialog explains that it sets the order of the sprint's work items from the selected ranking. Choose a ranking:",[26,433,434,440,446,452],{},[29,435,436,439],{},[18,437,438],{},"Board rank"," uses the work item's position in the Jira sprint order.",[29,441,442,445],{},[18,443,444],{},"Votes"," uses the number of Jira votes on the work item.",[29,447,448,451],{},[18,449,450],{},"Affinity rank"," uses the selected perspective's affinity ranking from the planning session.",[29,453,454,457],{},[18,455,456],{},"Dot rank"," uses the selected perspective's dot ranking from the planning session.",[11,459,460],{},"A ranking that has no values for the sprint is shown in the dropdown but cannot be selected. This happens when Jira returns no board rank or vote counts, or when the selected perspective has no affinity or dot ranking yet. Nothing in the dialog warns you about it: choose another ranking, or add the missing data in the planning session. When you change the perspective, the ranking falls back to the first option that has values if the current one does not.",[11,462,463,464,58,467,470],{},"Choose ",[18,465,466],{},"Ascending",[18,468,469],{},"Descending"," for the sort order. For Affinity rank and Dot rank, a Perspective dropdown appears beside the other two so you can choose which perspective's ranking to use. The Default perspective is selected first.",[11,472,473],{},"Below the dropdowns, a preview table lists the work items in their new order. It shows the work item type icon, the work item key, and the Rank number in a neutral badge. The Type column header uses the work-item icon. The Rank column uses 10 percent of the preview width, and the Rank header and its cells are right aligned. Rank numbers are bound to the work items, not to their row position. Each source has a natural order: lower Board rank and lower Affinity position are better, while higher Votes and higher Dot counts are better. Ordinal numbers are assigned once in that order, so changing between Ascending and Descending reverses both the rows and the displayed numbers. For Dot rank, Ascending shows the most-dotted work item first, and Descending reverses the whole list, including the work items with 0 dots. With Votes, the Rank cell shows the work item's vote count, including 0, instead of an ordinal position. With Dot rank, a work item with no dots shows 0. A work item with no value for the selected ranking shows 0 and follows the ranked work items. Apply saves a number for every work item in the sprint.",[11,475,422,476,479],{},[18,477,478],{},"Apply"," to save the new order and the rank numbers for the sprint. The dialog closes and the Rank column shows the numbers. If the save fails, the dialog stays open with an error message, and the previous order stays in place.",[11,481,482],{},"Non-moderators see the saved rank numbers read only. Dragging a work item, adding work items, or removing work items keeps the saved numbers attached to the work items. A work item moved to another sprint or removed from the plan loses its number, and a moved or newly added work item shows 0 until you apply a ranking again. Applying the capacity plan to Jira keeps the rank numbers.",[84,484,486],{"id":485},"plan-the-team","Plan the team",[11,488,489,490,211,493,495,496,499,500,502,503,505,506,508,509,511,512,514,515,66,517,519,520,522],{},"The right side has ",[18,491,492],{},"Team capacity",[18,494,123],{},", a tab for each perspective that estimates with the same board you selected, and ",[18,497,498],{},"Chat",". The perspective tabs appear only when a work item is selected in the combined table. Their titles stay on one line and are not shortened with an ellipsis. The selected tab is shared with the planning session, so participants who are locked to the moderator follow the moderator's tab. Choosing another tab while locked keeps that tab for you only and clears the lock. A yellow ",[18,501,264],{}," badge marks the tab the moderator is viewing. Every non-moderator sees it, whether or not ",[18,504,405],{}," is checked, and it stays on the moderator's tab while you look at another tab locally. ",[18,507,492],{}," shows the team for the selected sprint. ",[18,510,123],{}," shows the selected active or future sprint's Jira fields. Each perspective tab shows the voting panel for the selected work item. The ",[18,513,498],{}," tab at the right end of the tab bar always shows the full session conversation: every message sent from the planning session, plus messages sent from outside the session for the work items in the capacity plan, ordered by publish time. Selecting a work item, selecting no work item, or selecting a closed sprint does not change the conversation. A selected work item only chooses where a new message is sent: the work item chat. With no selection or a closed sprint, a new message goes to the planning session chat. Every work item message keeps its work item key link, in every chat panel. Your own messages sit on the right side of the conversation, and messages from other participants sit on the left. When you select a closed sprint, only ",[18,516,492],{},[18,518,498],{}," stay visible, and the ",[18,521,123],{}," and perspective tabs are hidden. Your role badge and the sound bell always sit at the right end of the tab bar. The badge opens the Permissions settings, and the bell turns sound notifications on or off. When an active or future sprint has no stored team, Scrumpy fills its team from the people assigned to that sprint's work items while those items were In Progress, then stores it for that sprint. A moderator who selects a past sprint with no team is asked first because reading its history can take a while; a non-moderator sees the empty team read only. Cancel selects the sprint without populating its team. If you accept, the dialog stays open with a spinner and a message to wait until population finishes. If nobody was assigned while an item was In Progress, the team stays empty, and selecting the sprint again offers to populate it again. After that, moderators manage the list from the bulk action bar below the table. New assignees are not added automatically once a team is stored. Each sprint keeps its own team list.",[11,524,525,526,528],{},"The team table follows the sprint selected in the combined table. The checkboxes select team members for the bulk actions. The checkbox in the table header selects everyone at once. The member checkboxes are available to moderators only, are used only for the bulk actions, and are never shared with other participants. Non-moderators see a narrow first column with no header that shows a yellow ",[18,527,264],{}," badge on the team member whose calendar the moderator has open. The badge stays on that member while you open another member's calendar yourself.",[11,530,531],{},"A moderator can change every team member's utilization and working hours. A team member can change their own utilization and working hours for a sprint where they are on the team. This also works for a closed sprint that has a recorded team, so you can correct the team size and team capacity used for the velocity. If the closed sprint has no team yet, you can add members and set their capacity; the sprint starts counting towards the velocity as soon as it has a saved team. Adding or removing a team member updates the team table and every calculated value right away, before the save finishes. If the save fails, the previous team and values return. You can open any team member's calendar. A calendar you cannot change opens read only, and its hours of work and utilization are shown as disabled fields, so the values line up with the editable view.",[11,533,534],{},"For each team member:",[26,536,537,540,543,553,561,564,567],{},[29,538,539],{},"Change the overall utilization percentage to show part-time availability. The default is 100%.",[29,541,542],{},"Select the radio button next to the team member to open their calendar, then select the days they cannot work a full day. Select a highlighted day again to remove it. The calendar only shows dates inside the selected sprint, and it opens on the month of the sprint start date instead of the current month. The weekend days chosen in the space's Working week settings are disabled and do not count as working days.",[29,544,208,545,548,549,552],{},[18,546,547],{},"Hours of work"," column shows the hours the team member can work out of the sprint's total working hours, for example 72h out of 80h. Both values appear as badges. When the calendar is open, each marked day shows a small cross-circle button, its date in a read-only date picker, and an hours field next to it. The hours field accepts 0 to the ",[18,550,551],{},"Maximum daily hours"," set in the space's Working week settings (13h by default). A newly marked day starts at 0 hours. Select the cross-circle button to remove that day from the team member's calendar.",[29,554,208,555,557,558,560],{},[18,556,280],{}," column shows the overall utilization. When the calendar is open, a utilization field for every marked day sits next to it. A day with no hours of work keeps its utilization field disabled, because that day adds no capacity. The reverse also holds: a day at 0% utilization keeps its hours of work field disabled, because those hours would be multiplied by zero. When both values are 0, the hours field stays editable so the day can be corrected. The column is hidden until you select ",[18,559,280],{}," in the columns dropdown, and hiding it also hides the per-day utilization fields of an open calendar.",[29,562,563],{},"A marked day starts at 0h. Raise the hours for a partial day, for example 6h. Days you do not mark count as a full working day at 100%, using the work hours from the space's working week settings (8h by default).",[29,565,566],{},"A marked day can also be longer than the regular work hours, for example 10h when the work hours are 8h. The extra hours raise that team member's total available hours above the sprint's regular total, for example 44h out of 40h, and increase their share of the team capacity and every target that uses it.",[29,568,569],{},"The overall utilization applies on top of each day. With 90% overall utilization, a day with 6h at 60% counts as 3.24h of a normal working day.",[11,571,572],{},"Below the team table, moderators see a small note on the right. It explains that to record time off or another deviation from the regular working hours per day, you open the team member's calendar and then select a date during the sprint. It also explains that the team member's sprint utilization is applied on top of each exception day's utilization.",[11,574,575,576,579,580,582,583,585],{},"Below the table, moderators see the team bulk action bar. Select ",[18,577,578],{},"Add team members"," to open a dialog, choose one or more people, and select ",[18,581,136],{},". The selected people join the team for the selected planned sprint and start with 100% utilization and full working hours. To remove team members, check them in the table and select ",[18,584,257],{},". If any selected team member has time off records in that sprint, a confirmation dialog explains that their time off records will be lost. Confirm the removal to continue; if there are no time off records, the members are removed immediately. Removing a team member deletes their saved utilization and time off for that sprint only. Other planned sprints keep their own team lists. Only moderators can add or remove team members.",[11,587,588,589,592],{},"To clear time off in that sprint, check the members and select ",[18,590,591],{},"Clear time off",". A confirmation dialog explains that their time off (Hours of work) entries will be deleted and their utilization reset to 100%. Confirm to continue. Each selected member returns to the regular working hours and full utilization. The clear control stays disabled when no selected member has something to clear.",[11,594,595],{},"The selected team member is remembered with the board view. The target updates as you change these values. The leftover value is negative when less was completed than was allocated and positive when more was completed. The leftover badges use the regular style when the absolute leftover percentage is at or below the deviation. Above the deviation, positive is green and negative is red.",[84,597,599],{"id":598},"the-selected-sprint","The selected sprint",[11,601,208,602,604],{},[18,603,123],{}," tab edits the sprint selected in the combined table. It is available for active and future sprints only. When a closed sprint is selected, the tab is hidden.",[26,606,607,624,630],{},[29,608,609,211,612,211,615,214,618,621,622,77],{},[18,610,611],{},"Sprint name",[18,613,614],{},"Sprint goal",[18,616,617],{},"Start date",[18,619,620],{},"End date"," are kept in the plan as you edit them. The table shows the new name right away and recalculates the sprint target and team day range from the new dates. Jira is not changed until you select ",[18,623,478],{},[29,625,626,627,629],{},"Below the ",[18,628,614],{}," field, a square thumbs up button and a square thumbs down button let voters agree or disagree with the text. The number of votes appears beside each button. A voter can vote, select a button again to remove the vote, and the counts update for everyone. Guests see the counts but cannot vote. Votes reset when the goal text changes.",[29,631,632,633,636],{},"Sprint state changes happen in Jira, not in this tab. To start or complete a sprint, use the Jira backlog or the active sprints page, then select ",[18,634,635],{},"Refresh"," in the capacity toolbar to reload the plan. A started sprint shows as the current sprint, and a completed sprint leaves the plan.",[11,638,639],{},"Moderators can edit these fields. Non-moderators see the same values read only.",[84,641,643],{"id":642},"vote-on-work-items-from-capacity-planning","Vote on work items from capacity planning",[11,645,646],{},"A perspective appears as a tab in the team section when its estimation target is the board and its estimation board is the same board you selected above the combined table. A perspective that writes estimates to Jira fields instead, or estimates with another board, does not appear.",[11,648,649,650,653,654,211,657,214,660,663,664,666],{},"Select a work item in the combined table, then open its perspective tab to vote. The perspective tabs appear only after a work item is selected. The tab shows the same voting panel as the Refinement\u002Fgrooming tab: the perspective header, the voting cards, the participant list, the session controls, and the final result with ",[18,651,652],{},"Accept",". While a session runs, the ",[18,655,656],{},"Vote",[18,658,659],{},"Results",[18,661,662],{},"Details"," sub-tabs stay inside the perspective tab. The ",[18,665,662],{}," sub-tab shows the summary and description of the selected work item, and moderators can edit both there. An edit saves when you click away, switch to another sub-tab, or close the panel, even if the short description pause has not finished. If no work item is selected, the perspective tabs are hidden. When you select a closed sprint, the perspective tabs are hidden.",[11,668,669,670,672],{},"The summary you edit in the voting panel's ",[18,671,662],{}," sub-tab also updates the work item tooltip in the combined table.",[84,674,676],{"id":675},"the-capacity-toolbar","The capacity toolbar",[11,678,679,680,682,683,685,686,66,689,692,693,695,696,66,699,701,702,704],{},"Below the table, moderators see the same style of toolbar as the Refinement\u002Fgrooming tab. The board selector sits above the top left corner of the combined table, while the ",[18,681,20],{}," dropdown and the columns control sit above the top right corner. ",[18,684,478],{}," uses the warning colour. ",[18,687,688],{},"Edit",[18,690,691],{},"Delete"," sit in the row above the session tabs, beside ",[18,694,53],{},", and they appear only while a session is open. ",[18,697,698],{},"Archive",[18,700,478],{}," follow ",[18,703,635],{}," in the toolbar with a gap; they do not sit at the right edge:",[26,706,707,715,729,734,739,744,749,754],{},[29,708,709,711,712,714],{},[18,710,688],{},", beside ",[18,713,53],{},", changes the planning session title, description, and dates. The new title and description appear on the tab, in the planning header, and in the progress bar right away, and they return to the saved values if the save fails. A message then tells you that the planning session could not be saved.",[29,716,717,719,720,722,723,725,726,728],{},[18,718,96],{}," adds work items from a saved Jira filter, a sprint, a Refinement\u002Fgrooming planning session, or a retrospective to the selected sprint plan. The picker starts with a ",[18,721,302],{}," group that lists the planning sessions with work items; selecting one previews that session's work items. A ",[18,724,69],{}," group follows it and lists the planning sessions whose retrospective action items are linked to Jira work items. Select one to preview the linked work items. The ",[18,727,69],{}," group is hidden when no action item is linked to a work item. It only offers work items from the current space that are not already in the selected sprint plan. To start over, clear the picker: the chosen source is dropped, the search box empties, and the first 100 shared filters return.",[29,730,731,733],{},[18,732,76],{}," opens the sprint picker described above.",[29,735,736,738],{},[18,737,257],{}," removes the checked work items from the selected sprint plan, or the checked sprints from the planning session after you confirm. It does not change Jira immediately.",[29,740,741,743],{},[18,742,635],{}," reads the sprints and work items from Jira again, including their priorities, summaries, and descriptions. It does not change the plan or Jira.",[29,745,746,748],{},[18,747,698],{}," creates a Confluence page for the sprint currently selected in the combined table. It is available only when a Confluence space is configured, and it is disabled when a past sprint is selected. The page records the planning session window and duration, the selected sprint and goal, the goal votes, the capacity decision, the velocity summary, the team's hours of work, and the ordered work items with their estimates.",[29,750,751,753],{},[18,752,478],{}," updates Jira with the plan and the sprint name, goal, and dates you changed.",[29,755,756,711,758,760],{},[18,757,691],{},[18,759,688],{}," above the tabs, closes the planning session. It asks for confirmation, then permanently removes the planning session with its capacity data, votes, notes, action items, standup, and chat.",[11,762,763,764,766],{},"The planning session progress bar appears below the toolbar. Non-moderators see the ",[18,765,405],{}," checkbox in the space where the toolbar appears.",[84,768,770],{"id":769},"sprint-goals","Sprint goals",[11,772,773,774,776,777,779],{},"Every sprint goal appears in small text below the sprint name in the table and stays on one line, and a goal that does not fit is shortened with an ellipsis. A sprint without a goal keeps an empty goal line in the table, so the sprint rows and the timeline stay aligned. Moderators edit an active or future sprint goal in the ",[18,775,123],{}," tab. The goal under the sprint name follows your typing before the draft is saved, and the goal votes reset to 0 as soon as the text changes. The vote buttons stay read only until the goal draft is saved, because the votes always describe the saved goal. A goal change appears for everyone without a reload and reaches Jira when you select ",[18,778,478],{},". A closed sprint goal is read only. If a goal in Jira contains line breaks, the table shows them as spaces.",[11,781,782,783,785],{},"The sprint name and dates you change in the ",[18,784,123],{}," tab also appear in the combined table, the team calendar, and the target as you change them, before the draft is saved. The date fields stay editable while a change is saved, so you can set the start and end dates without waiting, and an older save never rewinds a newer date you picked. A failed save restores the saved name, goal, and dates.",[84,787,789],{"id":788},"move-work-into-the-selected-sprint","Move work into the selected sprint",[11,791,792,793,795,796,77],{},"Work items are planned per sprint. Use ",[18,794,96],{}," to add a work item from a filter, a sprint, a Refinement\u002Fgrooming session, or a retrospective to the selected sprint, drag a work item onto another sprint row to move it into that sprint, or drag within a sprint to reorder its items. The order and sprint membership are saved as a draft. They do not change Jira until you select ",[18,797,478],{},[84,799,801],{"id":800},"apply-the-plan","Apply the plan",[11,803,422,804,806,807,809],{},[18,805,478],{}," after ",[18,808,635],{}," in the toolbar and confirm the change in the dialog. Scrumpy then:",[26,811,812,815,818,821,824,827],{},[29,813,814],{},"Saves the sprint names, goals, and start and end dates you changed.",[29,816,817],{},"Moves the planned work items into the selected sprints.",[29,819,820],{},"Updates their order inside each sprint using the board's rank field.",[29,822,823],{},"Moves work items you removed from a sprint plan to the backlog, but only when they are currently in that sprint. Work items that are in another sprint or already in the backlog stay where they are.",[29,825,826],{},"Leaves closed sprints and their estimates unchanged.",[29,828,829],{},"Saves a team capacity snapshot for every selected sprint that has a team. The snapshot holds the team members, their working hours, and their utilization, is kept for 12 months, and is not tied to this planning session.",[11,831,832],{},"When the update finishes, the page reloads the current Jira data. If Jira refuses part of the change, the page tells you that some sprints could not be updated and keeps the draft so you can try again. A sprint name, goal, or date you have not applied yet is part of the plan, so it also appears in the combined table and in an archive page.",[84,834,836],{"id":835},"archive-the-capacity-plan","Archive the capacity plan",[11,838,839],{},"You can save a sprint's capacity plan as a Confluence page, so the team keeps a record of what was planned and why. Only a moderator can archive, and the action is available only after a Confluence space has been configured for the space.",[841,842,843,849,854,857],"ol",{},[29,844,845,846,848],{},"Select an active or future sprint in the combined table. ",[18,847,698],{}," is disabled for a closed sprint, because a closed sprint is history only.",[29,850,422,851,853],{},[18,852,698],{}," in the capacity toolbar.",[29,855,856],{},"Review the preview. It shows the sprint and its dates, the sprint goal, the up and down votes, the capacity decision, and the velocity summary. The team and work item tables are written to the Confluence page but are not shown in the dialog.",[29,858,422,859,861,862,865],{},[18,860,698],{}," to create the page, or ",[18,863,864],{},"Close"," to leave the capacity plan unchanged.",[11,867,868,869,871],{},"While the preview loads, ",[18,870,698],{}," stays disabled. If the preview cannot load, the dialog explains why, and you can close it and try again. When the page is ready, the dialog shows a link to it. If Confluence refuses the page, the dialog shows the reason and your capacity plan is not changed.",[11,873,874,875,878,879,883,884,887],{},"The page is written under the ",[18,876,877],{},"Plannings"," parent page in the configured Confluence space, in a child page named ",[880,881,882],"code",{},"\u003Cspace name> - Capacity planning",". Planning-session archives stay under the separate ",[18,885,886],{},"Estimations"," parent, so the two kinds of page never overwrite each other. The page title starts with the planning session title, then the sprint name, and the planning start time with the timezone.",[11,889,890],{},"The page contains:",[26,892,893,896,899,902,905,908,911,914],{},[29,894,895],{},"The planning session title, description, start and end time, and timezone, in the same header as the planning archive page",[29,897,898],{},"The planning session duration, as a plain line below that header",[29,900,901],{},"The selected sprint name, state, dates, and goal",[29,903,904],{},"The up and down votes for the goal",[29,906,907],{},"A decision line for the target capacity range",[29,909,910],{},"The velocity summary: velocity per member, team velocity, team size, effective team size, team capacity, target capacity, healthy range, planned estimate, remaining estimate, and deviation from target",[29,912,913],{},"Every team member in the selected sprint, with their utilization and their hours of work out of the sprint working hours",[29,915,916],{},"The work items in their saved order, with their status and estimate",[11,918,919],{},"The header is the same one the planning archive page uses: the planning title and description, then the start and end on separate lines, with each date shown as a Confluence date chip and each time highlighted in a blue badge, and the timezone the dates are valid in. The planning duration follows the header as a plain line. The sprint goal and its up and down votes appear centered directly below the sprint name. The team and work item tables use a wider layout, and the Work item column leaves room for a longer summary.",[11,921,922],{},"The page shows the capacity plan as it currently appears, including draft changes that you have not applied to Jira yet. On a story point board the values use story points, and on a time board they use work-day durations. Re-archiving the same sprint updates the existing page instead of creating a duplicate.",[84,924,926],{"id":925},"notes","Notes",[26,928,929,932,938,941,947,950,953],{},[29,930,931],{},"Velocity uses the current completion state of the work items in the closed sprints. A work item that was reopened after its sprint closed counts as not completed. Manual completion percentages on active or future work items do not change the velocity.",[29,933,934,935,937],{},"The manual completion percentage is saved with the planning session and never written to Jira. ",[18,936,478],{}," keeps it. On a time board the percentage is not manual: it is recalculated from the current time spent and original time estimate each time the plan loads or refreshes.",[29,939,940],{},"Working days exclude Saturdays and Sundays unless you change the weekend days in the space's Working week settings. Mark public holidays as 0h days for each team member.",[29,942,943,944,946],{},"Velocity uses the saved team size and team capacity of the selected closed sprints. If you select no closed sprints, or none of them has a saved team, the velocity is zero. Before asking you to populate a past sprint that has no saved team, Scrumpy loads the most recent team capacity snapshot from an earlier Apply when one is still available. A past sprint with no saved team and no snapshot shows 0% and does not count. Select it to open its ",[18,945,492],{}," tab, populate its team, and then correct its size and capacity. A team member who never had a work item In Progress in a sprint does not appear in that sprint's team list.",[29,948,949],{},"Removing a sprint from the capacity plan does not delete its saved draft work item order or team settings. Those come back if you add the sprint to the planning session again.",[29,951,952],{},"Each planning session has its own capacity data. Switching planning tabs does not change another planning session.",[29,954,955],{},"A non-moderator can edit only their own utilization and time off, and only for a sprint where they are on the team. The change is saved for everyone who views that sprint.",[11,957,958],{},"Capacity planning data is kept for 90 days after the last change, matching the planning session. Older capacity data is removed automatically. Team capacity snapshots are separate records kept for 12 months after the last Apply that refreshed them.",{"title":960,"searchDepth":961,"depth":961,"links":962},"",2,[963,964,965,966,967,968,969,970,971,972,973,974,975],{"id":86,"depth":961,"text":87},{"id":140,"depth":961,"text":141},{"id":369,"depth":961,"text":370},{"id":418,"depth":961,"text":419},{"id":485,"depth":961,"text":486},{"id":598,"depth":961,"text":599},{"id":642,"depth":961,"text":643},{"id":675,"depth":961,"text":676},{"id":769,"depth":961,"text":770},{"id":788,"depth":961,"text":789},{"id":800,"depth":961,"text":801},{"id":835,"depth":961,"text":836},{"id":925,"depth":961,"text":926},"2026-11-21","2026-11-08","Plan sprint capacity from recent velocity, drag work into sprints and let the team vote on what fits.","md","\u002Fog\u002Fguide-capacity-planning.jpg",[982,983,357,984],"capacity planning","sprint capacity","agile planning","en",{},true,13,"\u002Fgetting-started\u002Fcapacity-planning","guide",{"title":6,"description":978},{"loc":989,"lastmod":976},"capacity-planning","guide\u002Fen\u002Fcapacity-planning","guide\u002Fcapacity-planning","o18flU9NCXI_8Fri7sepAw5oIlAYzvcI-Fp5yw9pXO0",{"id":998,"title":999,"body":1000,"dateModified":976,"datePublished":1331,"description":1332,"extension":979,"heading":1044,"image":1333,"imageAlt":1044,"keywords":1334,"locale":985,"meta":1338,"navigation":987,"order":1339,"path":1340,"section":990,"seo":1341,"sitemap":1342,"slug":1343,"stem":1344,"translationKey":1345,"__hash__":1346},"guide\u002Fguide\u002Fen\u002Farchiving-to-confluence.md","Archiving to Confluence | Scrumpy Planning Poker",{"type":8,"value":1001,"toc":1321},[1002,1005,1009,1020,1026,1030,1042,1046,1063,1072,1078,1082,1093,1097,1105,1117,1120,1147,1154,1157,1161,1175,1178,1180,1201,1214,1218,1230,1236,1248,1252,1255,1283,1286,1290,1296,1315],[11,1003,1004],{},"A moderator can archive a planning session to a Confluence page, giving the team a permanent record of the accepted estimates. Archiving is optional and only available after a Confluence space has been configured for the Jira space.",[84,1006,1008],{"id":1007},"configuring-the-confluence-space","Configuring the Confluence Space",[11,1010,1011,1012,1015,1016,1019],{},"In space settings, open the ",[18,1013,1014],{},"Permissions"," tab and find ",[18,1017,1018],{},"Confluence space",", below the roles. Use the search box to find a space by name or key and select it; only the space key is stored. Leave it empty to disable archiving. Only a space administrator can change this setting. The search shows only Confluence spaces your account can access.",[11,1021,1022,1023,1025],{},"If Scrumpy is not installed on Confluence for your site, the ",[18,1024,1018],{}," field is disabled and a note explains that Confluence export is available only after the app is installed on Confluence.",[84,1027,1029],{"id":1028},"archiving-a-planning-session","Archiving a Planning Session",[11,1031,1032,1033,1035,1036,1038,1039,1041],{},"On the ",[18,1034,302],{}," tab, the ",[18,1037,698],{}," button sits at the end of the action bar below the planning table and appears only when a Confluence space is configured. Clicking ",[18,1040,698],{}," opens a dialog that previews exactly what will be written:",[146,1043],{"alt":1044,"caption":1044,"stem":1045},"Archiving to Confluence","guide-archive",[26,1047,1048,1051,1054,1057,1060],{},[29,1049,1050],{},"When the planning session has a timer, the window is shown as a start badge and an end badge",[29,1052,1053],{},"The preview table lists the work items that have an accepted estimate inside the window, with Type, Work item, Perspective, and Estimate columns, and can be sorted",[29,1055,1056],{},"A planning session without a timer has no window, so its preview lists every work item with an accepted estimate",[29,1058,1059],{},"Work items you cannot open in Jira are omitted, including work items hidden by Jira issue-level security",[29,1061,1062],{},"When nothing is listed, the dialog explains why: no estimates have been accepted for this session yet, or the session has accepted estimates but none fall inside the planning window",[11,1064,1065,1066,1068,1069,1071],{},"Confirm with ",[18,1067,698],{},". On success the dialog shows a link to the created page. The ",[18,1070,698],{}," button is disabled whenever the preview lists no work items (while it is loading, when none have been accepted, when they all fall outside the planning window, or when the preview fails to load). Only moderators can archive.",[11,1073,1074,1075,1077],{},"When Scrumpy is not installed on Confluence, the ",[18,1076,698],{}," button is disabled and explains why. The Delete dialogs then do not offer the archive option.",[84,1079,1081],{"id":1080},"archiving-while-deleting","Archiving While Deleting",[11,1083,1084,1085,1088,1089,1092],{},"When a Confluence space is configured, both Delete dialogs offer a ",[18,1086,1087],{},"Create a Confluence archive page"," checkbox. When checked, the archive runs after any chosen accept or cancel action and before the planning session is removed. The resulting page link, or the failure message, is shown as a banner in the Refinement\u002Fgrooming tab. The banner offers a ",[18,1090,1091],{},"Dismiss"," action that hides it.",[84,1094,1096],{"id":1095},"archiving-a-capacity-plan","Archiving a Capacity Plan",[11,1098,1032,1099,1101,1102,1104],{},[18,1100,49],{}," tab, select an active or future sprint in the combined table, then select ",[18,1103,698],{}," in the capacity toolbar. The button is disabled when a closed sprint is selected, because a closed sprint is history only. Only a moderator can archive, and the action is available only after a Confluence space has been configured for the space.",[11,1106,1107,1108,1110,1111,1113,1114,1116],{},"The dialog previews the sprint, the goal and its votes, the decision, and the velocity summary before anything is written. The team and work item tables are written to the page only. While the preview loads, ",[18,1109,698],{}," stays disabled. If the preview cannot load, the dialog says so, and you can close it and try again. Confirm with ",[18,1112,698],{}," to create the page, or select ",[18,1115,864],{}," to leave the capacity plan unchanged. When the page is ready, the dialog shows a link to it. If Confluence refuses the page, the dialog shows the reason and the capacity plan is not changed.",[11,1118,1119],{},"The page records:",[26,1121,1122,1125,1128,1131,1138,1141,1144],{},[29,1123,1124],{},"The planning session title, description, start and end time, and timezone, in the same header as the planning archive page, followed by the planning duration",[29,1126,1127],{},"The selected sprint name, state, start and end dates, and sprint goal",[29,1129,1130],{},"The up and down votes for the sprint goal",[29,1132,1133,1134,1137],{},"A ",[18,1135,1136],{},"Decision"," section that says whether the remaining estimate is below, within, or above the target capacity range",[29,1139,1140],{},"A velocity summary with the velocity per member, team velocity, team size, effective team size, team capacity, target capacity, healthy range, planned estimate, remaining estimate, and deviation from target",[29,1142,1143],{},"A team table with every member of the selected sprint, their utilization, and their hours of work out of the sprint working hours",[29,1145,1146],{},"The planned work items in their saved order, with their status and estimate. An estimate is shown in green while the running total stays below the healthy range, in yellow inside the range, and in red above it, matching the capacity table.",[11,1148,1149,1150,1153],{},"The header is the same one the planning archive page uses: the planning title and description, then the start and end on separate lines, with each date shown as a Confluence date chip and each time highlighted in a blue badge, and the timezone the dates are valid in. The planning duration follows the header as a plain line. The sprint goal and its up and down votes appear centered directly below the sprint name, and the sprint goal is shown without a label. The sprint start and end dates share one line and are separated by a dash, for example ",[18,1151,1152],{},"Oct 7, 2026 - Oct 15, 2026",". The team and work item tables use a wider layout, and the Work item column leaves room for a longer summary.",[11,1155,1156],{},"The page reflects the capacity plan as it currently appears, including changes that are still saved as a draft and have not been applied to Jira. Story point boards show story points, and time boards show work-day durations.",[84,1158,1160],{"id":1159},"archiving-a-retrospective","Archiving a Retrospective",[11,1162,1032,1163,1035,1165,1167,1168,1170,1171,1174],{},[18,1164,69],{},[18,1166,698],{}," button sits before ",[18,1169,478],{},". It is available to moderators in the ",[18,1172,1173],{},"Actions"," stage. In Feedback and Vote it stays disabled with an explanation, because the notes of other participants are still hidden until the team reveals them. Archiving creates or updates the Confluence page and does not close the planning session.",[11,1176,1177],{},"The dialog previews the archive for the selected sprint before anything is written. It shows the planning window, the board and sprint name, the sprint goal, the sprint state, how many notes each column contributes, and the action items with their work item type icon, their linked Jira work item or summary, and their hearts. The confirmation button stays disabled while the preview loads, when the preview cannot load, and when the sprint has neither notes nor action items. Only a moderator can archive.",[11,1179,1119],{},[26,1181,1182,1185,1188,1191,1194],{},[29,1183,1184],{},"The planning title, description, start and end time, and timezone",[29,1186,1187],{},"The board name, sprint name, sprint goal, sprint dates, and sprint state",[29,1189,1190],{},"A notes table with one column per retrospective column, such as Good, Bad, and Ugly. Each note sits in its own cell, and notes that the team grouped together share one cell. Authors, hearts, and votes are not written to the page.",[29,1192,1193],{},"A participants table with every note author, everyone who gave a heart, and every action item author, showing the number of notes and hearts for each person. The hearts column is headed with a heart icon.",[29,1195,1196,1197,1200],{},"An action items table with a ",[18,1198,1199],{},"Summary"," first column that is twice as wide as before. A linked action item shows its Jira work item link; an action item without a link shows its summary as text. The rows keep the order the moderator set in the retrospective. The narrow last column is headed with a heart icon and shows the number of hearts in a colored badge. The number is the total hearts of the notes the action item came from, the same number the retrospective shows.",[11,1202,1203,1204,1207,1208,1210,1211,1213],{},"Retrospective archives use their own hierarchy: a root ",[18,1205,1206],{},"Retrospectives"," parent page, then a child page named after the space with a ",[18,1209,1206],{}," suffix, then the archive page. The page title carries the planning name, the sprint name, and the word ",[18,1212,69],{},", so it never collides with planning or capacity archives. Re-archiving the same sprint updates the existing page.",[84,1215,1217],{"id":1216},"archiving-a-standup","Archiving a Standup",[11,1219,1032,1220,1035,1222,1167,1224,1226,1227,1229],{},[18,1221,65],{},[18,1223,698],{},[18,1225,478],{}," and is available to moderators when a Confluence space is configured. Archiving never applies, discards, or completes the standup and never changes Jira. The dialog previews the planning window, the scope and space name, the participants with their presentation time, and the work items with their changes. Confirm with ",[18,1228,698],{}," to create or update the page.",[11,1231,1232,1233,77],{},"The page records the planning header, the sprint, board, or filter name, the space name, the sprint goal and state, every assignee with presence, item count, and presentation time, and every work item with its status, presentation time, and changes. Presentation time is the countdown time the work item spent on screen, credited to its assignee. A staged change is marked ",[18,1234,1235],{},"Pending",[11,1237,1238,1239,1241,1242,1244,1245,1247],{},"Standup archives use the ",[18,1240,877],{}," root. The child page is named after the space with a ",[18,1243,65],{}," suffix, and the page title carries the planning name, the scope name, the word ",[18,1246,65],{},", and the planning start time.",[84,1249,1251],{"id":1250},"the-archive-page","The Archive Page",[11,1253,1254],{},"Planning, capacity, retrospective, and standup archives all start with the same planning session header. The generated planning page contains:",[26,1256,1257,1264,1267,1270,1276],{},[29,1258,1259,1260,1263],{},"The planning title, followed by the start date, time, and timezone (for example ",[18,1261,1262],{},"Sprint 42 - 2025-06-01 09:00 (Europe\u002FBerlin)",")",[29,1265,1266],{},"The description, then the start and end on separate lines, with each date shown as a Confluence date chip and each time highlighted in a blue badge",[29,1268,1269],{},"The timezone the dates are valid in",[29,1271,1133,1272,1275],{},[18,1273,1274],{},"Participants"," section listing every voter who actually voted, with their number of votes, as a small table with a Votes column and a Participant column (each voter is one row)",[29,1277,1278,1279,1282],{},"An ",[18,1280,1281],{},"Estimated work items"," table of the accepted estimates, with columns Work item, Perspective, Duration, Votes (each given vote as a badge), Participants (the voters shown as a group of users), Estimate (a badge that is green when the computed average was chosen and yellow when the moderator set a different value), and Moderated by (the user who started the voting session)",[11,1284,1285],{},"The page includes only the accepted estimates that fall between the planning session's start and end. A planning session without a timer has no window, so its page includes every accepted estimate, has no start, end, or timezone line, and its title carries only the planning name. All dates and times are rendered in the archiver's preferred timezone.",[84,1287,1289],{"id":1288},"page-hierarchy-and-re-archiving","Page Hierarchy and Re-Archiving",[11,1291,1292,1293,1295],{},"Planning-session archives are written under a fixed hierarchy: a root ",[18,1294,886],{}," parent page, then a child page named after the Jira space, then the archive page.",[11,1297,1298,1299,1301,1302,1304,1305,1307,1308,1311,1312,1314],{},"Capacity-plan archives use a separate hierarchy at the same level: a root ",[18,1300,877],{}," parent page, then a child page named ",[880,1303,882],{},", then the archive page. Standup archives share the ",[18,1306,877],{}," root but use a child page named ",[880,1309,1310],{},"\u003Cspace name> - Standup",", and their page titles carry the word ",[18,1313,65],{},". The distinct page titles keep the four archive kinds apart and stop one from overwriting another.",[11,1316,1317,1318,1320],{},"Re-archiving the same sprint updates the existing capacity or standup page (matched by exact title inside the ",[18,1319,877],{}," area) instead of creating a duplicate. The created page is a normal Confluence page and is not removed when Scrumpy purges estimation data after its 90-day retention window.",{"title":960,"searchDepth":961,"depth":961,"links":1322},[1323,1324,1325,1326,1327,1328,1329,1330],{"id":1007,"depth":961,"text":1008},{"id":1028,"depth":961,"text":1029},{"id":1080,"depth":961,"text":1081},{"id":1095,"depth":961,"text":1096},{"id":1159,"depth":961,"text":1160},{"id":1216,"depth":961,"text":1217},{"id":1250,"depth":961,"text":1251},{"id":1288,"depth":961,"text":1289},"2026-10-11","Archive planning sessions, capacity plans, stand-ups and retrospectives to Confluence pages that stay with your team.","\u002Fog\u002Fguide-archiving-to-confluence.jpg",[1335,1336,1337],"confluence archiving","sprint retrospective archive","jira confluence",{},12,"\u002Fgetting-started\u002Farchiving-to-confluence",{"title":999,"description":1332},{"loc":1340,"lastmod":976},"archiving-to-confluence","guide\u002Fen\u002Farchiving-to-confluence","guide\u002Farchiving-to-confluence","frifiz6pWms7zEA57HRYz7R6D-Pf8PEpSyY6kbkapIc",{"id":1348,"title":1349,"body":1350,"dateModified":976,"datePublished":1953,"description":1954,"extension":979,"heading":1955,"image":1956,"imageAlt":1955,"keywords":1957,"locale":985,"meta":1961,"navigation":987,"order":1962,"path":1963,"section":990,"seo":1964,"sitemap":1965,"slug":1966,"stem":1967,"translationKey":1968,"__hash__":1969},"guide\u002Fguide\u002Fen\u002Fsprint-retrospectives.md","Sprint retrospectives | Scrumpy Planning Poker",{"type":8,"value":1351,"toc":1937},[1352,1357,1362,1366,1389,1393,1419,1423,1426,1485,1488,1494,1498,1509,1512,1516,1530,1535,1539,1542,1552,1555,1586,1589,1592,1605,1609,1618,1630,1633,1642,1645,1651,1655,1665,1690,1699,1709,1712,1725,1728,1732,1735,1764,1767,1771,1780,1798,1801,1804,1807,1810,1814,1823,1832,1836,1839,1848,1860,1877,1880,1884,1896,1921,1925,1928,1931,1934],[11,1353,208,1354,1356],{},[18,1355,69],{}," tab runs a retrospective for a sprint, for a board without sprints, or for the space when it has no board, inside a planning session. You and the other participants add notes to three columns, like the notes you agree with, group related notes, and turn notes into action items. The notes stay face down during Feedback, which is the first stage, and are revealed in the Vote stage, except your own notes, which only you can see.",[11,1358,1359],{},[18,1360,1361],{},"The retrospective is virtual: notes, groups, stages, and the timer stay in Scrumpy. Jira changes only when you select Apply, which creates or updates the Jira work items for your action items.",[84,1363,1365],{"id":1364},"before-you-start","Before you start",[26,1367,1368,1371,1383,1386],{},[29,1369,1370],{},"The space does not need a board. A Scrum board with sprints, a Kanban board, or a Scrum board without sprints works too. With no board at all, the retrospective saves its notes, timer, action items, and type for the planning session itself.",[29,1372,1373,1374,1035,1376,1035,1378,1380,1381,171],{},"A planning session must exist. Create one from the ",[18,1375,302],{},[18,1377,49],{},[18,1379,65],{}," tab, or the ",[18,1382,69],{},[29,1384,1385],{},"Each sprint of a board, each board without sprints, and a planning session without a board has its own retrospective: its own notes, timer, action items, stage, and type. A change in one never reaches another.",[29,1387,1388],{},"Moderators choose the shared board, retrospective type, and sprint when the board has one. Locked participants follow that selection.",[84,1390,1392],{"id":1391},"choose-the-board-and-sprint","Choose the board and sprint",[841,1394,1395,1400,1403,1410,1416],{},[29,1396,1397,1398,171],{},"Open the ",[18,1399,69],{},[29,1401,1402],{},"Pick a planning session from the tabs above the retrospective board. When the session you last opened is no longer available, the first planning session opens instead.",[29,1404,1405,1406,1409],{},"Pick a ",[18,1407,1408],{},"board"," in the top left corner.",[29,1411,1405,1412,1415],{},[18,1413,1414],{},"sprint"," next to the board. The list shows the six most recently started sprints of that board. A sprint that has not started yet is not listed. If the board has no started sprint, the sprint selector is hidden and the retrospective works for the board. A voter or guest can pick another sprint locally; that detaches the viewer from the moderator. Every sprint opens its own retrospective.",[29,1417,1418],{},"The sprint name appears in the center, with its goal underneath. Use the link icon next to the goal to open the sprint in the Jira backlog in a new browser tab. A board without sprints hides the sprint name, the goal, and the link. A space without a board shows an empty disabled board selector and hides the sprint selector, and the retrospective works for the planning session.",[84,1420,1422],{"id":1421},"choose-the-retrospective-type","Choose the retrospective type",[11,1424,1425],{},"Use the dropdown in the top right corner. The three columns change with the type:",[1427,1428,1429,1441],"table",{},[1430,1431,1432],"thead",{},[1433,1434,1435,1438],"tr",{},[1436,1437,155],"th",{},[1436,1439,1440],{},"Columns",[1442,1443,1444,1453,1461,1469,1477],"tbody",{},[1433,1445,1446,1450],{},[1447,1448,1449],"td",{},"The good \u002F The bad \u002F The ugly",[1447,1451,1452],{},"The good, The bad, The ugly",[1433,1454,1455,1458],{},[1447,1456,1457],{},"Start \u002F Stop \u002F Continue",[1447,1459,1460],{},"Start, Stop, Continue",[1433,1462,1463,1466],{},[1447,1464,1465],{},"Mad \u002F Glad \u002F Sad",[1447,1467,1468],{},"Mad, Glad, Sad",[1433,1470,1471,1474],{},[1447,1472,1473],{},"Sunny skies \u002F Hot air \u002F Storm clouds",[1447,1475,1476],{},"Sunny skies, Hot air, Storm clouds",[1433,1478,1479,1482],{},[1447,1480,1481],{},"What worked well? \u002F What didn't go well? \u002F What should we try next?",[1447,1483,1484],{},"The three questions",[11,1486,1487],{},"Switching the type only changes the column names. The notes stay in their columns. The new column names appear right away, and you can keep adding notes and using the actions while the change saves. If the change cannot be saved, the previous type returns.",[11,1489,1490,1491,1493],{},"The type belongs to the retrospective you are looking at. Each sprint keeps its own type, and so does a board without sprints and a planning session without a board. Switching the sprint or the board shows that retrospective's own type, or the default ",[18,1492,1449],{}," when it never had one. Changing the type on one sprint never changes another sprint's columns.",[84,1495,1497],{"id":1496},"add-a-note","Add a note",[841,1499,1500,1503,1506],{},[29,1501,1502],{},"Find the column you want. Its name sits above the retrospective board, centered over the lane.",[29,1504,1505],{},"Select the add button with the plus icon under the column name.",[29,1507,1508],{},"An empty note appears in the column and its editor is ready. Type your note.",[11,1510,1511],{},"Your own notes are always visible to you, even during Feedback. Notes from other participants stay hidden during Feedback and are revealed in the Vote stage. The note sits in the retrospective board as a sticky card with the same layout as a chat message. Your own notes sit on the right of the column, and notes from other participants sit on the left. Each card shows the author and the author's role (Moderator or Voter), the time, the note text, and the actions you can use on that note. The role uses the same label as a chat message. A single note has no separate accent line inside the card; the card's rounded border is the only accent border, in blue for your notes and purple for notes from other participants. The cards use the same 8px vertical spacing as the standup work item cards. Notes in a group have a 20px gap before and after the group. Guests can read the notes but cannot add or edit them.",[84,1513,1515],{"id":1514},"read-edit-and-like-a-note","Read, edit, and like a note",[26,1517,1518,1521,1524,1527],{},[29,1519,1520],{},"If you wrote the note, the card itself contains an editor. Change the text directly on the card and it is saved shortly after you stop typing. Only the author or a moderator can edit a note.",[29,1522,1523],{},"Select the like button on a card to like a note. Select it again to remove your like. The button shows how many likes the note has. You can like notes in the Vote stage. In the Actions stage the like button and its count stay on the card but are read-only, so you can still see the totals. The like button, and the delete button on notes you wrote, sit at the right edge of the action row for every participant, close together.",[29,1525,1526],{},"A group shows one like button with the sum of its notes' likes. A new like is added to the first note in the group. If you already liked a note in the group, selecting the group like removes your like from the first note you liked.",[29,1528,1529],{},"The delete button on a card asks for confirmation, then removes that note, only if you wrote it. A group has one delete action that removes every note in the group, and only a participant who wrote every note in the group can use it. A note that belongs to an action item keeps its text and editor, but its like is disabled until the action item is removed. Grouping is still available; grouping linked notes adds the whole group to their action items.",[146,1531],{"alt":1532,"caption":1533,"stem":1534},"The retrospective board with notes in the three columns, the stage selector, and the shared countdown","The retrospective board","guide-retrospective",[84,1536,1538],{"id":1537},"select-several-notes","Select several notes",[11,1540,1541],{},"Each card has a checkbox at the start of its action row. A moderator sees one on every card. A voter sees one on every card during the Vote stage, so they can like several notes at once, including notes written by other people, and only on their own notes in the other stages. A group has one checkbox in its action bar, and it selects every note in the group; it appears to a moderator, to a voter during the Vote stage, and to a participant who wrote every note in the group. Checking a note ticks its checkbox. The moderator's checked notes are filled with the light accent colour that matches their border, and every participant sees the same fill, even when they browse the retrospective locally. A voter's own checkbox only ticks, because the fill always shows the moderator's shared selection. A group is filled as one card when any of its notes is checked. The fill is stored with the retrospective, survives a reload, and is cleared when the sprint changes.",[11,1543,1544,1545,1547,1548,1551],{},"A moderator also has an ",[18,1546,688],{}," button at the start of the action bar, before ",[18,1549,1550],{},"Group notes",". It opens the Edit planning session dialog, where you can change the title, description, and schedule of the planning session. The new values show on the planning tab and the progress bar right away. If the save fails, the previous values come back and a message tells you that the planning session could not be saved.",[11,1553,1554],{},"Select the checkboxes of the notes you want, then use the action bar below the notes and action items:",[26,1556,1557,1562,1568,1574,1580],{},[29,1558,1559,1561],{},[18,1560,1550],{}," is available to moderators. The selected notes in each column join one group. The button is enabled from the Vote stage on, when at least two selected notes are in the same column and at least one of them is not already in a group. If a selected note already belongs to an action item, that action item takes on the whole group's notes, authors, and likes.",[29,1563,1564,1567],{},[18,1565,1566],{},"Ungroup notes"," is available to moderators. The selected notes in each column leave their group. The button is enabled from the Vote stage on, when at least one selected note belongs to a group.",[29,1569,1570,1573],{},[18,1571,1572],{},"Like notes"," adds your like to every selected note. It is enabled in the Vote stage, including when the selection contains another participant's notes.",[29,1575,1576,1579],{},[18,1577,1578],{},"Create action items"," uses the tasks icon and is available to moderators. It creates one action item for each selected note and one for each selected group. Notes that already belong to an action item, and groups containing one, are skipped. The action is enabled when at least one selected note or group is not already linked.",[29,1581,1582,1585],{},[18,1583,1584],{},"Delete notes"," removes the selected notes you wrote. The action is disabled when the selection includes a note written by someone else, so a mixed selection is for liking only. The checked action items are removed with the separate action item delete action. A confirmation dialog appears before anything is deleted.",[11,1587,1588],{},"Grouped notes stay together and are separated from the rest of the column by a 20px gap. The whole group shares one comment card, one pair of left and right borders, one author header, and one action bar. The author header shows the first note's author and time. Each grouped note has its own editor inside the card; your own notes are editable and the other notes are read-only. Each note except the last is separated from the next by a 1px dashed bottom border in the group card's accent colour. The last note has no bottom border, so the group keeps one clean end, and a single note has no separator. The group action bar has one selection checkbox that selects every note in the group, one like button with the summed like count, and one delete action. The delete action appears only when you wrote every note in the group, and it removes every note in the group after confirmation. The group like and delete buttons sit at the right edge of the group action row, close together.",[11,1590,1591],{},"Deleting a note is disabled while the note belongs to an action item. Remove the action item first if you need to delete its source notes. Removing the action item leaves the source notes in the retrospective.",[11,1593,1594,1595,1598,1599,1601,1602,1604],{},"A moderator also has a ",[18,1596,1597],{},"Discard changes"," text button immediately after the delete actions, the same action the Standup offers. It asks for confirmation and deletes every note, action item, and the timer of the retrospective on screen, returning it to its initial state with its chosen type. Other sprints, other boards, and the planning session's other retrospectives keep their notes, action items, and timer. The ",[18,1600,698],{}," action sits after Discard changes with spacing before it, and ",[18,1603,478],{}," follows it and creates or updates Jira work items for every action item in the selected sprint that has a work item type other than None. Only a moderator sees Discard changes and Apply. Discard changes is disabled when the retrospective on screen has no notes, no action items, and an untouched timer, and it stays disabled while the discard is being saved. Apply is available when at least one action item has a work item type other than None and is new or has changed since the last Apply, even when no rows are checked. After a successful Apply it is disabled until an action item changes.",[84,1606,1608],{"id":1607},"see-your-notes-in-the-status-and-assignee-tables","See your notes in the Status and Assignee tables",[11,1610,1611,1612,66,1614,1617],{},"From the Vote stage on, the right side panel has two more tabs, ",[18,1613,185],{},[18,1615,1616],{},"Assignee",". Both tables list the notes of the retrospective. A group is one row, with the first line of each note shown one under the other and separated by a dashed line. A row shows a checkbox, the author, and the first line of the note, cut with an ellipsis when it is longer.",[26,1619,1620,1625],{},[29,1621,1622,1624],{},[18,1623,185],{}," groups the notes by the three columns of the retrospective type.",[29,1626,1627,1629],{},[18,1628,1616],{}," groups the notes by the person who wrote them. A group sits under the author of its first note.",[11,1631,1632],{},"A checkbox in a table is the same checkbox as on the note. Selecting a row selects the note on the board, and selecting a note on the board selects its row. A group row selects every note in the group. A voter can select their own notes outside the Vote stage and any note in the Vote stage.",[11,1634,1635,1636,1638,1639,1641],{},"Drag a row into another section to move it. In ",[18,1637,185],{},", a section is a column, so the note moves to that column; inside its own section it changes only the order. In ",[18,1640,1616],{},", a section is one author, so this makes that person the note's author. Grouped notes move together. Only a moderator or the note's author can drag a row; another row returns to its place with a message. A column can hold at most 200 notes, so a move into a full column is refused.",[11,1643,1644],{},"The tables appear in the Vote and Actions stages. During Feedback they are hidden, because another participant's note is still face down.",[11,1646,1647,1648,1650],{},"Changing a note's author also changes the role shown on the note and the Authors column of every action item built from it. The move saves right away, so there is nothing to Apply. When you are ready, ",[18,1649,1578],{}," in the action bar is the blue primary action.",[84,1652,1654],{"id":1653},"turn-notes-into-action-items","Turn notes into action items",[11,1656,1657,1658,1660,1661,1664],{},"A moderator selects one or more notes or groups, then selects ",[18,1659,1578],{}," in the note action bar. The button is enabled when at least one selected note or group has no action item yet. Only those unlinked notes and groups create rows; the ones that already have an action item are skipped. The action items appear in a table above the action bar. A centered ",[18,1662,1663],{},"Action items"," heading sits above the table, with a short line below it that reads \"Follow-up action items based on the team retrospective notes.\" The heading is smaller than the sprint or board name and is hidden when the table has no rows. The table stretches across the left content, and the selected action item's details are in the Details tab of the right side panel when the action item has no voting tab. While no action item is selected, the side panel has no Details tab. A moderator can drag a row to change the order of the action items. Everyone sees the new order right away, and the Confluence archive writes the action items in that order.",[26,1666,1667,1670,1673,1680,1687],{},[29,1668,1669],{},"One selected single note creates one row.",[29,1671,1672],{},"One selected group creates one row. The row uses the group's first note as its summary and lists every author in the group.",[29,1674,1675,1676,1679],{},"The Type column header is the work-item icon, and the next column is headed ",[18,1677,1678],{},"Work item",". Its cells show the same issue key link as the planning session tables, with the action item summary on hover. For a moderator, the matching work item type icon comes before the compact dropdown, and the header icon and the type icon are left aligned. The dropdown starts with None, which is not the default. When None is selected, the icon becomes an empty space of the same width so the cell does not resize. For a voter or guest, the Type column shows only the work item type icon and uses the minimum width, and their first column is a new empty column that marks the action item the moderator selected. The remaining columns show the summary, the authors, the total likes of the source notes, and the estimate. The Summary column cells show the summary without a Summary label.",[29,1681,1682,1683,1686],{},"The last column is headed ",[18,1684,1685],{},"Estimate",". It shows the linked work item's current estimate in the selected board's unit: story points for a numeric board and a work-day duration for a time board. The cell stays empty for an action item without a Jira link or without an estimate. The column is hidden when the board has no estimation field.",[29,1688,1689],{},"For everyone else the type cell shows only the work item type icon, with an empty space of the same width when the type is None, and the header icon and the type icon are centered in their column. The Type column for a voter or guest uses the minimum width. A moderator changes the type in the dropdown; the icon updates immediately, and if the change cannot be saved, the previous type returns.",[11,1691,1692,1693,1695,1696,1698],{},"A moderator sees a checkbox column for selection and a radio column for choosing the shared row shown in the Details tab of the side panel. The radio column header uses the same presenter mode icon as the single selection column of the Refinement and grooming tab. Everyone else sees the same radio column, and their first column is an empty column of the minimum width that shows a warning ",[18,1694,264],{}," badge on the action item the moderator selected, with a tooltip that names it, like the Refinement and grooming table. The badge follows the moderator's current selection even while you browse the retrospective locally. While you are locked to the moderator, your radio follows the moderator's row. Select another row's radio to browse that action item yourself: the choice detaches you from the moderator, appears only in this browser tab, and leaves the moderator's shared row unchanged. Selecting another action item by the moderator does not replace your local row while you stay detached. Selecting an action item with its checkbox also selects the notes that were used to create it. Choosing another radio button replaces the summary and description in the Details tab with the newly selected action item. The like count in the table is shown in a purple lozenge with no icon. The ",[18,1697,1199],{}," column in the table shows plain text. Edit the summary in the Details tab while no voting tab is shown; only a moderator can change it there.",[11,1700,1701,1702,1704,1705,1708],{},"The action item details show a ",[18,1703,1199],{}," label and a ",[18,1706,1707],{},"Description"," label above the two fields. Only a moderator can edit the summary, the description, and the work item type. The summary uses the same inline text field as a work item summary in the Details tab. The description uses the same editor as a work item description. Voters and guests see the action item details read-only. The type dropdown starts with None, then lists the work item types of the board's project, without subtasks. The first Jira work item type remains the default.",[11,1710,1711],{},"The action bar below the action item table controls both kinds of selection:",[26,1713,1714,1720],{},[29,1715,1716,1719],{},[18,1717,1718],{},"Delete action items"," uses the table-row-delete icon and removes only the checked action items after a confirmation dialog. It is available to moderators. The source notes stay in the retrospective when you remove an action item. A Jira work item that was already created stays in Jira.",[29,1721,1722,1724],{},[18,1723,478],{}," creates a work item for every action item in the selected sprint that has a work item type other than None and no Jira link, and updates the linked work item for every action item that has a type and a link. It is available to moderators. Action items with None are skipped entirely, so no Jira work item is created or updated for them. The checked rows do not limit it. It is a text button immediately after Archive, and it is available only when at least one action item has a work item type other than None and is new or has changed since the last Apply, so a second Apply without an edit stays disabled. New work items are added to the project backlog. If some rows fail, the retrospective shows a warning and the successful rows keep their links. A small hint below the action item table explains that Apply creates or updates Jira work items from the action items and that estimation becomes available once a Jira work item is created from an action item. The hint appears to moderators only, when at least one action item has a work item type other than None.",[11,1726,1727],{},"The action bar sits directly below the action item table, with the planning progress bar directly below it and a space.200 vertical gap between them. This is the same placement as the action toolbar in the capacity planning tab.",[84,1729,1731],{"id":1730},"the-timer","The timer",[11,1733,1734],{},"The countdown clock sits at the right of the action bar below the retrospective board. A moderator also sees the controls there, with the clock to the right of the fast-forward button. Everyone sees the clock.",[26,1736,1737,1740,1743,1746,1749,1752,1755,1758,1761],{},[29,1738,1739],{},"A moderator chooses 1, 3, 5, 10, or 15 minutes. Choosing a duration resets the countdown.",[29,1741,1742],{},"The first note you add in Feedback starts the countdown automatically with the selected duration. Anyone in the team can start it this way. The stage then locks until the countdown ends or a moderator fast-forwards it. If the countdown was already started or paused, adding a note does not restart or resume it.",[29,1744,1745],{},"The play button starts the timer, pauses it while it runs, and resumes it when paused. Only a moderator sees the duration selector, the play button, and the fast-forward button.",[29,1747,1748],{},"A moderator can use the fast-forward button to end the countdown and move to the next stage right away.",[29,1750,1751],{},"The remaining time is shown in a large rounded box. When the countdown ends, the same box shows that time is up.",[29,1753,1754],{},"The clock updates every second.",[29,1756,1757],{},"While the stage is Feedback, the cards written by other participants keep their layout but hide the note text and the like button. Your own note keeps its text and editor. Grouping and ungrouping are disabled in Feedback; creating action items is enabled only in the Actions stage. Delete stays available.",[29,1759,1760],{},"When the countdown reaches zero, the stage moves to Vote and the note text is revealed. The text appears for everyone at the same time, including the person who changes the stage. Your own notes stay visible all the time.",[29,1762,1763],{},"In the Vote and Actions stages the timer is just a timer. A moderator can start it again at any time to timebox the discussion without hiding the notes, except in the Actions stage where the timer controls are disabled.",[11,1765,1766],{},"The progress bar under the action bar shows how far the planning session is from its start and end dates. It ends to the left of the side panel.",[84,1768,1770],{"id":1769},"stages","Stages",[11,1772,208,1773,1776,1777,1779],{},[18,1774,1775],{},"Stage"," dropdown sits after the timer controls in the action bar. Its three stages are grouped under the ",[18,1778,1775],{}," label inside the menu:",[26,1781,1782,1788,1793],{},[29,1783,1784,1787],{},[18,1785,1786],{},"Feedback"," is the default. You can add notes. Grouping, ungrouping, likes, and creating action items are disabled.",[29,1789,1790,1792],{},[18,1791,656],{}," disables new notes. You can like notes. Creating action items is disabled.",[29,1794,1795,1797],{},[18,1796,1173],{}," disables new notes and likes. Like buttons and counts stay visible but cannot be selected. A moderator can create action items. The countdown controls are disabled.",[11,1799,1800],{},"A small line below the notes explains the current stage. Everyone sees it. In Feedback it invites the team to add sticky notes with their feedback. In Vote it explains that this is the time to collect which notes are worth creating action items from. In Actions it explains that notes can be grouped by common meaning and action items created from the most-voted notes.",[11,1802,1803],{},"A moderator switches the stage. Everyone else sees the current stage in the dropdown but cannot change it. The stage is remembered with the retrospective and survives a reload.",[11,1805,1806],{},"While a countdown has started and has not ended, the stage is locked. When the countdown ends or is fast-forwarded, the next stage is selected automatically. The notes are revealed when you leave Feedback, and they are hidden again if you go back to Feedback.",[11,1808,1809],{},"An action item shows the total likes of all its source notes. When the action item comes from a group, this includes every note in the group. Grouping notes later also adds the whole group's notes, authors, and likes to every action item already linked to a note in the group. Ungrouping keeps the action item linked to the notes and keeps the total.",[84,1811,1813],{"id":1812},"archive-and-complete","Archive and complete",[11,1815,1816,1817,1819,1820,1822],{},"A moderator can archive the retrospective to Confluence with the ",[18,1818,698],{}," button before Apply in the action bar. It is available in the ",[18,1821,1173],{}," stage, because the notes stay hidden from everyone until the team reveals them. The archive writes the notes, the participants, and the action items of the selected sprint to the page, and it creates or updates the page. It does not close the planning session. See Archiving to Confluence for the page contents.",[11,1824,1825,1826,1828,1829,1831],{},"The danger-colored ",[18,1827,691],{}," button, above the session tabs beside ",[18,1830,53],{},", closes the planning session. It asks for confirmation, then permanently removes the planning session and its notes, action items, standup, and chat.",[84,1833,1835],{"id":1834},"details-and-chat","Details and chat",[11,1837,1838],{},"The right side panel has a Chat tab on the right. When an action item is selected and it has no voting tab, a Details tab appears on the left. The Details tab shows the selected action item. While no action item is selected, the panel shows only the Chat tab. The Chat tab holds the full session conversation: every message sent from the planning session, plus messages sent from outside the session for the work items the retrospective shows, including the work items linked from action items, ordered by time. A work item message shows its work item key as a small link at the start of its action row; select it to open the work item in Jira. When you select an action item that is linked to a Jira work item, the messages you send go to that work item chat, and the message shows the work item key as a small link. With no action item selected, with an action item that has no Jira link, or when you cannot open the linked work item, the messages go to the planning-session chat. The planning conversation belongs to the planning session, so it is the same chat in every tab that opens that planning session.",[11,1840,1841,1842,1844,1845,1847],{},"When the selected action item is linked to a Jira work item, the side panel also shows a voting tab for every perspective whose estimation uses the board in the board selector. The voting tabs appear before ",[18,1843,498],{},". Each tab opens the voting panel for the linked Jira work item. A voting tab already shows the linked work item details, so the Details tab is hidden while at least one voting tab is shown. An action item without a Jira link shows no voting tabs. Changing the board selector changes the voting tabs to that board's matching perspectives. When you accept an estimate in a voting tab, the linked action item's ",[18,1846,1685],{}," cell shows the new value right away, and every other participant sees it as soon as the accepted estimate reaches them.",[11,1849,1850,1851,1853,1854,1856,1857,1859],{},"The side panel is 400px wide and starts at the top of the planning session content, level with the board and sprint selectors. The Details tab is selected by default when it is shown. When a voting tab is shown, the panel opens on the first voting tab. The moderator's chosen tab is part of the shared retrospective data, so locked participants follow it. A yellow ",[18,1852,264],{}," badge marks the tab the moderator has open: ",[18,1855,662],{},", a voting tab, or ",[18,1858,498],{},". Every non-moderator sees it, whether they follow the moderator or browse on their own. The retrospective type selector sits at the end of the board and sprint row, immediately left of the side panel.",[26,1861,1862,1865,1868,1871,1874],{},[29,1863,1864],{},"Moderators and voters can send public or private messages. Guests can send public messages and cannot see private messages.",[29,1866,1867],{},"Work item messages appear next to planning messages by their sent time. They stay available for 72 hours and are hidden when you cannot open that work item in Jira.",[29,1869,1870],{},"When you send a message right after your own previous message, the new text is added to that message after a single newline. The combined message keeps one author header, one time, and one action row. Editing it edits the combined text. A message from another participant, a private or public change, or a role change starts a new message.",[29,1872,1873],{},"Messages can be edited or deleted by their author, and can be reacted to with thumbs up or thumbs down.",[29,1875,1876],{},"The side panel stretches to the height of the retrospective content. The note columns, action item table, and progress bar stay to its left.",[11,1878,1879],{},"The bell at the right of the Details and Chat tabs, after your role badge, controls sound notifications for the timer and the chat. Select it once to turn sound on. The bell starts muted.",[84,1881,1883],{"id":1882},"follow-the-moderator","Follow the moderator",[11,1885,1886,1887,211,1889,211,1891,214,1893,1895],{},"Voters and guests start locked to the moderator. While locked, you follow the moderator's action item, sprint, retrospective type, and side panel tab. The checked-note highlight is always shared, even while you browse locally. The moderator's changes arrive right away. You also follow the moderator's space page tab, so the page moves between ",[18,1888,302],{},[18,1890,49],{},[18,1892,65],{},[18,1894,69],{}," for the same planning session.",[26,1897,1898,1903,1909,1912,1918],{},[29,1899,1900,1902],{},[18,1901,405],{}," applies to the planning tab you are on. Switching to another planning tab yourself clears it, so you start detached on the new tab. A move caused by the moderator's tab change keeps it checked.",[29,1904,1905,1906,1908],{},"Clear ",[18,1907,405],{}," to browse on your own. You can pick another tab, pick another sprint, or pick another action item. Your action item choice applies only to you and is not shared with the team. Your choices stay with this tab. The shared board and retrospective type stay moderator controlled.",[29,1910,1911],{},"Picking another tab, sprint, or action item while locked also detaches you.",[29,1913,1914,1915,1917],{},"Check ",[18,1916,405],{}," again to discard your local choices and follow the moderator. The sprint and board return to the moderator's shared choice.",[29,1919,1920],{},"The lock is remembered in this browser tab while you stay on the tab.",[84,1922,1924],{"id":1923},"changes-appear-for-everyone","Changes appear for everyone",[11,1926,1927],{},"Every note, like, group, action item, and timer change is saved for the planning session and appears for the other participants right away. If the connection drops, the tab reloads the current state when the connection returns.",[11,1929,1930],{},"Most changes appear in your own view immediately, before the server answers. This includes the timer duration and controls, the Stage, adding and deleting notes, likes, groups, action items, and Discard changes. Confirmation dialogs close as soon as you confirm. If a change cannot be saved, the previous state is restored and a warning appears. The controls stay available while the change is being saved.",[11,1932,1933],{},"A like you give or take back stays as you left it. A slower copy of your earlier like never adds it back, and other people's likes still appear as they give them. If a like cannot be saved, only the likes from that click go back to how they were, and your other notes stay as you left them.",[11,1935,1936],{},"Retrospective data is kept for 72 hours after the last change. Older retrospective data is removed automatically.",{"title":960,"searchDepth":961,"depth":961,"links":1938},[1939,1940,1941,1942,1943,1944,1945,1946,1947,1948,1949,1950,1951,1952],{"id":1364,"depth":961,"text":1365},{"id":1391,"depth":961,"text":1392},{"id":1421,"depth":961,"text":1422},{"id":1496,"depth":961,"text":1497},{"id":1514,"depth":961,"text":1515},{"id":1537,"depth":961,"text":1538},{"id":1607,"depth":961,"text":1608},{"id":1653,"depth":961,"text":1654},{"id":1730,"depth":961,"text":1731},{"id":1769,"depth":961,"text":1770},{"id":1812,"depth":961,"text":1813},{"id":1834,"depth":961,"text":1835},{"id":1882,"depth":961,"text":1883},{"id":1923,"depth":961,"text":1924},"2026-11-13","Run a sprint retrospective in Jira: collect notes, group them, vote and turn the result into action items.","Sprint retrospectives","\u002Fog\u002Fguide-sprint-retrospectives.jpg",[1958,1959,1960],"sprint retrospective","agile retrospective","jira retrospective",{},14,"\u002Fgetting-started\u002Fsprint-retrospectives",{"title":1349,"description":1954},{"loc":1963,"lastmod":976},"sprint-retrospectives","guide\u002Fen\u002Fsprint-retrospectives","guide\u002Fsprint-retrospectives","ybCpunharAAtUbt5ZQmwP9arm2Kx-gjKWlDo-VcdhwU",{"id":1971,"title":1972,"body":1973,"dateModified":2106,"datePublished":2106,"description":2107,"extension":979,"heading":49,"image":2108,"imageAlt":49,"keywords":2109,"locale":985,"meta":2110,"navigation":987,"order":1962,"path":2111,"section":2112,"seo":2113,"sitemap":2114,"slug":993,"stem":2115,"translationKey":2116,"__hash__":2117},"tutorials\u002Ftutorials\u002Fen\u002Fcapacity-planning.md","Capacity planning | Tutorials | Scrumpy Planning Poker",{"type":8,"value":1974,"toc":2096},[1975,1978,1982,1994,1998,2001,2005,2012,2017,2021,2024,2029,2033,2044,2048,2051,2054,2059,2063,2068,2072,2076,2081,2085,2091],[11,1976,1977],{},"Capacity planning helps your team see how much work fits into the next sprints before you commit to it. Scrumpy compares the work you plan with the capacity your team really has, so the conversation starts from numbers instead of guesses.",[84,1979,1981],{"id":1980},"start-with-the-sprints-you-finished","Start with the sprints you finished",[11,1983,1984,1985,1987,1988,1990,1991,1993],{},"Open the space page and choose the ",[18,1986,49],{}," tab. Select your planning session, then select ",[18,1989,76],{},". In the ",[18,1992,110],{}," tab, tick the closed sprints that should set your team's velocity. Three past sprints give a steady average. Each past sprint should include the work the team completed, and its team should be filled in.",[146,1995],{"alt":1996,"caption":110,"stem":1997},"The Plan sprint dialog with three past sprints selected","tutorial-capacity-plan-sprint-past",[11,1999,2000],{},"If you are starting for the first time and there are no past sprints, you can still plan. Add the team to the sprint you want to plan, set each person's utilization and hours of work, and Scrumpy calculates the target from that team. Add past sprints later to get a velocity.",[84,2002,2004],{"id":2003},"add-the-active-and-future-sprints-you-want-to-plan","Add the active and future sprints you want to plan",[11,2006,1397,2007,2009,2010,77],{},[18,2008,116],{}," tab in the same dialog and tick the active or future sprints you want to include. You can plan several sprints at once, so the team can compare the next few weeks in one view. Select ",[18,2011,136],{},[146,2013],{"alt":2014,"caption":2015,"stem":2016},"The Sprints tab of the Plan sprint dialog with an active sprint selected","Active and future sprints","tutorial-capacity-plan-sprint-future",[84,2018,2020],{"id":2019},"the-board-selector-decides-which-sprints-you-can-plan","The board selector decides which sprints you can plan",[11,2022,2023],{},"This part is important. The sprint picker only lists sprints that originated from the board currently chosen in the board selector at the top left of the capacity table. Switch the board and the list changes. Each board keeps its own plan, so choose the board first, then add its sprints.",[146,2025],{"alt":2026,"caption":2027,"stem":2028},"The board selector at the top left of the capacity planning page","Board selector","tutorial-capacity-board-selector",[84,2030,2032],{"id":2031},"add-and-remove-work-items","Add and remove work items",[11,2034,2035,2036,2038,2039,2041,2042,77],{},"With a sprint selected in the table, use ",[18,2037,96],{}," to bring in work items from a saved Jira filter, a sprint, or a Refinement\u002Fgrooming session. Drag a work item to reorder it inside its sprint, or drag it onto another sprint row to move it. To remove items, tick them and select ",[18,2040,257],{},". Removing an item changes the plan, not Jira, until you select ",[18,2043,478],{},[84,2045,2047],{"id":2046},"read-the-capacity-timeline","Read the capacity timeline",[11,2049,2050],{},"In this example the planned sprint has seven work items. Their estimates are 1, 2, 3, 5, 8, 5, and 3 story points. The timeline adds them up as you read down the table. Green means there is room, yellow means you are close to the healthy range, and red means the running total is above the capacity your team has.",[11,2052,2053],{},"If the later work items sit behind a red line, the plan is too big for this team. Remove an item, lower an estimate, or add capacity before you start the sprint.",[146,2055],{"alt":2056,"caption":2057,"stem":2058},"The capacity table with seven work items and the timeline turning red above capacity","Capacity timeline","tutorial-capacity-timeline",[84,2060,2062],{"id":2061},"set-up-the-team","Set up the team",[11,2064,1397,2065,2067],{},[18,2066,492],{}," tab. This example has three team members. Each person has a utilization percentage and hours of work for the sprint. Time off is added in the person's calendar. When you change a value, the target and the timeline update right away.",[146,2069],{"alt":2070,"caption":492,"stem":2071},"The Team capacity table with three team members and their hours","tutorial-capacity-team",[84,2073,2075],{"id":2074},"agree-on-the-sprint-goal","Agree on the sprint goal",[11,2077,1397,2078,2080],{},[18,2079,123],{}," tab to write the sprint goal. Everyone can vote with the thumbs up and thumbs down buttons, and the counts update for the whole team. A clear goal helps the team agree on what the sprint is for before voting starts.",[84,2082,2084],{"id":2083},"vote-on-a-work-item-and-chat","Vote on a work item and chat",[11,2086,2087,2088,2090],{},"Select a work item in the table, then open a perspective tab to vote with the same cards you use in Refinement\u002Fgrooming. A ",[18,2089,498],{}," tab appears for the selected work item, so the team can discuss that item without leaving the capacity plan.",[146,2092],{"alt":2093,"caption":2094,"stem":2095},"The perspective voting panel and the Chat tab for a planned work item","Vote and chat","tutorial-capacity-voting-chat",{"title":960,"searchDepth":961,"depth":961,"links":2097},[2098,2099,2100,2101,2102,2103,2104,2105],{"id":1980,"depth":961,"text":1981},{"id":2003,"depth":961,"text":2004},{"id":2019,"depth":961,"text":2020},{"id":2031,"depth":961,"text":2032},{"id":2046,"depth":961,"text":2047},{"id":2061,"depth":961,"text":2062},{"id":2074,"depth":961,"text":2075},{"id":2083,"depth":961,"text":2084},"2026-11-10","Plan the next sprints from recent velocity, read the capacity timeline and apply the plan to Jira.","\u002Fog\u002Ftutorial-capacity-planning.jpg",[982,983,357],{},"\u002Ftutorials\u002Fcapacity-planning","tutorial",{"title":1972,"description":2107},{"loc":2111,"lastmod":2106},"tutorials\u002Fen\u002Fcapacity-planning","tutorial\u002Fcapacity-planning","dXqFjEQiGF7gHvaxbkFg7mAJK_PdEsz8aLt9oMCwdxI",[2119,2123],{"heading":2120,"description":2121,"path":2122},"The 10% Scrumban rule for every sprint","Committing to full capacity makes every sprint fragile. A 10% Scrumban buffer absorbs risk, protects the sprint goal and lets velocity grow naturally.","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"heading":2124,"description":2125,"path":2126},"How to estimate a release deadline","Time estimates fail when complexity and availability shift. Learn how story points, shared estimates and velocity make release dates predictable.","\u002Fblog\u002Fcorrectly-estimating-release-deadline",1795345556938]