[{"data":1,"prerenderedAt":977},["ShallowReactive",2],{"blog-index-fi":3},[4,204,346,512,608,810],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Ffi\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprintin riippuvuudet ja ketjutetut pull requestit | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Metallinen ketju, planning poker -kortteja ja kahvikuppi pöydällä",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprinteissä on usein riippuvaisia työtehtäviä, joko yhden tiimin sisällä tai useiden Scrum-tiimien välillä. Täydellisessä maailmassa riippuvuuksia ei olisi; käytännössä liiketoiminnan tarpeet voittavat ja riippuvuuksia lisätään julkaisusyklin lyhentämiseksi. Tämä artikkeli kuvaa yhden tavan hallita riippuvaisia tehtäviä ohjelmistotiimeissä.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Tehtävien väliset riippuvuudet",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"vanhanaikainen-tapa","Vanhanaikainen tapa",[12,46,47,48,53],{},"Suoraviivainen lähestymistapa on aloittaa tehtävä heti, kun sen riippuvuus on yhdistetty päähaaraan. Tällä tavalla jotkut tiimin jäsenet istuvat toimettomina, kunnes tehtävä on valmis. Lopulta jäljellä oleviin riippuvaisiin tehtäviin ei jää juuri lainkaan aikaa. Viimeiset tehtävät siirtyvät seuraavalle sprintille, ja ",[49,50,52],"a",{"href":51},"\u002Ffi\u002Fblog\u002Fcomparison-metrics-for-agile-teams","tiimi on tyytymätön",".",[12,55,56],{},"Miksi näin käy, vaikka kapasiteetti on arvioitu oikein? Useimmiten siksi, että aikaa kuluu kollegoiden valmistumisen odottamiseen. Pienetkin viivästykset kertautuvat, erityisesti lyhyissä sprinteissä.",[41,58,60],{"id":59},"riippuvaisten-tehtävien-työstäminen-samanaikaisesti","Riippuvaisten tehtävien työstäminen samanaikaisesti",[12,62,63],{},"Tämä on mahdollista pienellä ylimääräisellä työllä. Kun tiimin jäsenet työstävät tehtäviä samanaikaisesti, on useita etuja.",[65,66,68],"h3",{"id":67},"parempi-yhteistyö","Parempi yhteistyö",[12,70,71],{},"Kun tiimin jäsenet työstävät riippuvaisia tehtäviä samanaikaisesti, se muistuttaa pariohjelmointia. Yhden pitää ymmärtää alkupään tehtävä ja toisen siitä riippuva tehtävä. Tiimi saa laajemman käsityksen ratkaistavista ongelmista.",[65,73,75],{"id":74},"odotusajan-välttäminen","Odotusajan välttäminen",[12,77,78],{},"Kun tehtävät etenevät rinnakkain, kukaan ei odota korjauksen saapumista. Kaikki voivat työskennellä yhtä aikaa, ja kysymysten ilmetessä keskustelua syntyy spontaanimmin.",[65,80,82],{"id":81},"pull-requestit-valmiina-koodikatselmukseen-aikaisemmin","Pull requestit valmiina koodikatselmukseen aikaisemmin",[12,84,85],{},"Kun haarasi perustuu kollegan haaraan, alkuperäisen pull requestin hyväksyminen on helpompaa. Ymmärrät jo, miten alkupään työtehtävä toteutettiin, ja alkuperäinen haara on testattu ja katselmoitu koko toteutuksen ajan. Se ei ole enää tuntematonta aluetta.",[41,87,89],{"id":88},"ketjutettujen-pinottujen-pull-requestien-käyttö","Ketjutettujen (pinottujen) pull requestien käyttö",[12,91,92],{},"Tämä rinnakkaisuuden taso vaatii oikeat työkalut. Git-pohjaisella versionhallinnalla se on suoraviivaista. Seuraavat vaiheet kuvaavat prosessin.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Riippuvuuspuu",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Riippuvuuspuu (kuuden riippuvaisen tehtävän työstäminen samanaikaisesti)",[65,107,109],{"id":108},"määrittele-riippuvuudet-selvästi","Määrittele riippuvuudet selvästi",[12,111,112],{},"Määrittele riippuvuusketju sprintin suunnittelun aikana. Pull request -ketju seuraa sitten tätä määritelmää tarkasti. Ketjun muuttaminen kesken kehityksen on kallista rebasen vuoksi.",[65,114,116],{"id":115},"aloita-juuritehtävistä","Aloita juuritehtävistä",[12,118,119],{},"Jokaisessa riippuvuusketjussa on juuritehtäviä, jotka eivät riipu mistään muusta. Niiden työstäminen voi alkaa ensimmäisenä päivänä.",[65,121,123],{"id":122},"toteuta-ydin-ensin","Toteuta ydin ensin",[12,125,126],{},"Tämä voi olla ristiriidassa testivetoisen kehityksen (TDD) kanssa, jossa testit kirjoitetaan ensin. Jotta pull request -ketju pysyy hallittavana, toteuta ydin ensin. Näin riippuvaiset tiimin jäsenet pääsevät siihen käsiksi aikaisemmin.",[65,128,130],{"id":129},"järjestä-ja-katselmoi-koodi-fifo-jonossa","Järjestä ja katselmoi koodi FIFO-jonossa",[12,132,133],{},"Ensimmäisenä luotu haara pitäisi katselmoida ja yhdistää ensimmäisenä. Jokainen yhdistäminen käynnistää CI:n; jos se rikkoo päähaaran koontiversion, ongelma korjataan vielä pienenä.",[41,135,137],{"id":136},"ylimääräinen-työ","Ylimääräinen työ",[12,139,140],{},"Riippuvaisten haarojen ketjun ylläpitämisessä on hyötyjä mutta myös haittoja.",[65,142,144],{"id":143},"rebase-tai-yhdistäminen","Rebase tai yhdistäminen",[12,146,147],{},"Ketju on pidettävä synkronissa, ja se vaatii vaivaa. Nykyaikaiset työkalut tarjoavat yhden napsautuksen synkronoinnin perushaaran kanssa, kun konflikteja ei ole. Käytä sitä tarvittaessa, kun ylävirran muutosten hakeminen on turvallista. Kun koontiversio menee läpi ja ominaisuus toimii, synkronoi.",[65,149,151],{"id":150},"tiimityö","Tiimityö",[12,153,154],{},"Riippuvuusketju vaatii yhteistyöhaluisen tiimin, jonka jäsenet ovat valmiita puhumaan toisilleen. Se ei toimi, jos ihmiset työskentelevät eristyksissä.",[12,156,157],{},"Riippuvaiset työtehtävät kannattaa pitää poissa kuluvasta sprintistä. Kun liiketoiminnan tarpeet vaativat niiden etenemistä rinnakkain, johdettujen haarojen ketju on käytännöllinen tapa hallita riippuvuuksien ylimääräistä työtä.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Riippuvaiset työtehtävät pysäyttävät sprintin, kun ihmiset odottavat. Näin pinotut pull requestit pitävät työn liikkeessä ja vähentävät odotusaikaa.","md","Sprintin riippuvuuksien hallinta ketjutettujen pull requestien avulla","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"sprintin riippuvuudet","pinotut pull requestit","ketjutetut pull requestit","koodikatselmus","ketterä toimitus","fi",{},true,"\u002Fblog\u002Ffi\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Ffi\u002Fmanage-sprint-dependencies-with-chained-pull-requests","M9hY2_18VNw7iMF_eBoyw_TaX5CTbZyCpdMenaUqPGw",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":325,"description":326,"extension":182,"heading":327,"image":328,"imageAlt":213,"keywords":329,"locale":191,"meta":335,"navigation":193,"path":336,"reviewed":193,"seo":337,"sitemap":338,"slug":343,"stem":344,"translationKey":343,"__hash__":345},"blog\u002Fblog\u002Ffi\u002Fcomparison-metrics-for-agile-teams.md","Vertailumittarit ketterille tiimeille | AELBOX",{"type":9,"value":208,"toc":316},[209,216,219,223,226,234,238,242,245,249,252,260,264,272,276,279,282,289,293,296,303,306,310,313],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Viivain, planning poker -kortteja ja kahvikuppi pöydällä",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Ketterien tiimien vertaileminen on vaikeaa, ja on syytä kysyä, miksi ylipäätään vertailemme niitä. Miten eri alojen tiimien vertaileminen oikeastaan auttaa?",[41,220,222],{"id":221},"kilpailun-luominen","Kilpailun luominen",[12,224,225],{},"Tiimejä ei pitäisi asettaa paremmuusjärjestykseen mielivaltaisilla mittareilla. Se vain heikentää motivaatiota. Sen sijaan mittareiden pitäisi antaa jokaiselle tiimille yhtäläinen mahdollisuus kilpailla. Suorituskyky paranee silloin siksi, että tiimit haluavat sitä, ei siksi, että joku painostaa.",[12,227,228],{},[15,229],{"alt":230,"height":231,"loading":32,"src":232,"width":233,"decoding":34},"Luo kilpailu",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,235,236],{},[38,237,230],{},[41,239,241],{"id":240},"mittarit-yhtäläisten-mahdollisuuksien-luomiseen","Mittarit yhtäläisten mahdollisuuksien luomiseen",[12,243,244],{},"Tässä on neljä perusmittaria tiimien vertailuun. Ne mittaavat vain kunkin tiimin kykyä kilpailla yhtäläisin edellytyksin, ei muuta. Vertailukelpoiset mittarit luovat yhtäläisiä mahdollisuuksia.",[65,246,248],{"id":247},"onnistuneet-sprintit","Onnistuneet sprintit",[12,250,251],{},"Jos sprint olisi vain aikaraja, sillä ei olisi mitään tarkoitusta. Sprint on etappi ja tarvitsee tavoitteen. Sprintin tavoite (tärkein storykokonaisuus) on suurempi etappi; kaikkien storyjen valmiiksi saaminen on pienempi. Järjestä jokaisen sprintin lopussa tiimien välinen demo, jossa tiimit esittelevät, mitä ne toimittivat. Terve kilpailu kannustaa tiimejä saamaan sprintin tavoitteensa valmiiksi. Ihmiset tarvitsevat näkyvän tavoitteen motivoituakseen.",[12,253,254],{},[15,255],{"alt":256,"height":257,"loading":32,"src":258,"width":259,"decoding":34},"Sprintti kohti tavoitetta",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,261,262],{},[38,263,256],{},[12,265,266,267,271],{},"Voisiko tästä tulla yli- ja alisitoutumisen peli? Jos tiimi sitoutuu liian vähään, demo paljastaa sen: näytettävää on vähemmän. Jos se sitoutuu liikaa, demosta tulee ",[268,269,270],"strong",{},"jälleen yksi epäonnistunut sprintti",". Sen toimittaminen, mihin tiimi sitoutui, rakentaa motivaatiota tehdä enemmän. Tiimit tuntevat tyytyväisyyttä työhönsä.",[65,273,275],{"id":274},"nopeuden-vakaus-ja-rehellinen-estimointi","Nopeuden vakaus ja rehellinen estimointi",[12,277,278],{},"Tämä on tietotyötä, ei liukuhihnatyötä. Jos kukaan tiimissä ei ymmärrä ongelmaa riittävän hyvin arvioidakseen sen ratkaisun, ongelmaa ei tutkittu etukäteen.",[12,280,281],{},"Edellisessä sprintissä tehty aikarajattu spike ja sitä seuraava tiimin katselmus löydöksistä helpottavat toteutuksen pilkkomista pienempiin storyihin ja niiden kunnollista arviointia. Monimutkaisessa työssä kirjoita täydempi tekninen suunnitteludokumentti, joka luettelee toteutusstoryt.",[12,283,284,285,53],{},"Spike ja suunnittelutyö ovat itse storyja, jotka voi arvioida. Avain on määritellä monimutkaisen ratkaisun työn rakenne ja järjestys. Sen sijaan että tiimi sitoutuisi storyyn, jota se ei ymmärrä, luo tutkimustehtävä täyttämään aukko. Silloin estimointi ",[49,286,288],{"href":287},"\u002Ffi\u002Fblog\u002Fsheepherding-story-points","perustuu näyttöön",[65,290,292],{"id":291},"kapasiteetin-ennustettavuus-odottamattoman-työn-välttäminen","Kapasiteetin ennustettavuus (odottamattoman työn välttäminen)",[12,294,295],{},"Tutkimus tulee ensin; toteutus seuraa. Kun tutkimus paljastaa ongelmia, uusia työtehtäviä luodaan ja arvioidaan. Silloin sinulla on paljon selkeämpi kuva seuraavasta sprintistä. Tunnettu työ voidaan arvioida ja suunnitella; tuntematon työ saa aikarajatun tutkimustehtävän ennen arviointia. Kurinalaisuus tarkoittaa suuren työn pilkkomista pieniin, arvioitaviin osiin.",[12,297,298,299,53],{},"Monimutkainen työ voidaan aloittaa aikaisin, vaikka vain sen selvittämiseksi, että se vaatii oman storykokonaisuutensa. Sekin pienentää ",[49,300,302],{"href":301},"\u002Ffi\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","tuntemattoman riskiä",[12,304,305],{},"Tuki ja tuotannon häiriöiden selvittely hoidetaan yleensä aikarajatussa Kanban-virrassa sprintin ulkopuolella. Siellä ensimmäisen vastauksen aika ja SLA-rikkomukset ovat vertailumittarit.",[65,307,309],{"id":308},"tiimin-saatavuus-tehtäviin-käytetty-aika-jaettuna-sprintin-kokonaisajalla","Tiimin saatavuus (tehtäviin käytetty aika jaettuna sprintin kokonaisajalla)",[12,311,312],{},"Saatavuus on se osuus ajasta, jonka tiimin jäsenet käyttävät arvioituun työhön. Jos yksi tiimi vedetään koulutukseen, tiedonjakoon tai muuhun sisäiseen työhön useammin kuin muut, korjaa epätasapaino. Ainoa tapa pitää nopeus vakaana on pitää saatavuus vakaana. Kun saatavuus on tiimien välillä yhtä suuri, muut vertailumittarit toimivat.",[12,314,315],{},"Tiimien vertaileminen ei ole heikon suorituksen rankaisemista, vaan motivaation ja kilpailuhengen kasvattamista. Siksi näiden mittareiden ei pitäisi näkyä yksittäisille tiimin jäsenille: ne ovat valmentamisen työkalu, eivät julkinen paremmuusjärjestys. Seuraamalla näitä mittareita ja ohjaamalla Scrum Mastereita epäsuorasti annat tiimeille yhtäläiset lähtökohdat kilpailla.",{"title":159,"searchDepth":160,"depth":160,"links":317},[318,319],{"id":221,"depth":160,"text":222},{"id":240,"depth":160,"text":241,"children":320},[321,322,323,324],{"id":247,"depth":166,"text":248},{"id":274,"depth":166,"text":275},{"id":291,"depth":166,"text":292},{"id":308,"depth":166,"text":309},"2018-05-04","Mittareiden pitäisi luoda tasapuoliset lähtökohdat, ei tulostaulukkoa. Neljä vertailumittaria, jotka motivoivat ketteriä tiimejä ilman rangaistuksia.","Vertailumittarit ketterille tiimeille","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[330,331,332,333,334],"ketterät mittarit","tiimin nopeus","ketterät tiimit","scrum","kapasiteetti",{},"\u002Fblog\u002Ffi\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":326},{"loc":336,"images":339,"lastmod":179},[340,341,342],{"loc":215},{"loc":232},{"loc":258},"comparison-metrics-for-agile-teams","blog\u002Ffi\u002Fcomparison-metrics-for-agile-teams","Wp1JXIRlsFohzF7oPky2dYnnZ00wFjeaFt80cE-IowI",{"id":347,"title":348,"author":7,"body":349,"dateModified":179,"datePublished":488,"description":489,"extension":182,"heading":490,"image":491,"imageAlt":355,"keywords":492,"locale":191,"meta":498,"navigation":193,"path":499,"reviewed":193,"seo":500,"sitemap":501,"slug":509,"stem":510,"translationKey":509,"__hash__":511},"blog\u002Fblog\u002Ffi\u002Fsheepherding-story-points.md","Story pointtien paimentaminen: ankkurointi | AELBOX",{"type":9,"value":350,"toc":479},[351,357,360,364,371,379,383,387,390,393,400,404,407,411,414,419,423,427,430,437,441,445,448,453,457,461,473,476],[12,352,353],{},[15,354],{"alt":355,"height":18,"loading":19,"src":356,"width":21,"fetchPriority":22},"Lammaslauma ja planning poker -kortteja sohvapöydällä","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,358,359],{},"Story point -estimointi jää usein huomiotta tai tehdään chat-huoneissa ja avoimissa palavereissa, joissa jokainen näkee tai kuulee jokaisen äänen. Tieto siitä, miten muut äänestivät, vääristää lopputulosta ja tuottaa epätarkkoja arvioita. Toistuvat epätarkat arviot johtavat virheellisiin suunnitelmiin ja myöhästyneisiin tai peruttuihin toimituksiin. Näin avoimessa äänestyksessä käy.",[41,361,363],{"id":362},"äänestyksen-hahmot","Äänestyksen hahmot",[12,365,366,367,370],{},"Avoimessa estimointiäänestyksessä esiintyy useita hahmoja. Arvio riippuu siitä, kuka äänestää ensin, ja se on yleensä kaukana rehellisestä. Miksi järjestyksellä on avoimessa äänestyksessä niin suuri merkitys? ",[268,368,369],{},"Laumavaikutuksen"," vuoksi: kyse on ankkurointiharhasta, joka saa muut tiimin jäsenet kopioimaan ensimmäisen arvion.",[12,372,373],{},[15,374],{"alt":375,"height":376,"loading":32,"src":377,"width":378,"decoding":34},"Laumavaikutus",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,380,381],{},[38,382,375],{},[65,384,386],{"id":385},"yliluottavainen-äänestäjä","Yliluottavainen äänestäjä",[12,388,389],{},"Jokaisessa tiimissä on ainakin yksi jäsen, joka uskoo tuntevansa järjestelmän parhaiten. He äänestävät yleensä ensimmäisinä, koska vastaukset näyttävät heistä itsestäänselviltä. He jättävät usein huomiotta yksityiskohtia, jotka voivat kaataa arvion. Ne yksityiskohdat voi paljastaa etukäteen, mutta vain jos joku virittää keskustelun. Avoimessa äänestyksessä se ei onnistu.",[12,391,392],{},"Tämä henkilö äänestää yleensä rehellistä arviota pienemmän. Ehkä vain hän pystyisi tekemään storyn niin nopeasti, ja silloinkin vain tuurilla.",[12,394,395],{},[15,396],{"alt":386,"height":397,"loading":32,"src":398,"width":399,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,401,402],{},[38,403,386],{},[12,405,406],{},"Kaikki muut seuraavat perässä, joten tehtävä näyttää helpolta ja siltä, että kuka tahansa ehtii tehdä sen sovitussa ajassa. Käytännössä sen tekee yleensä joku muu.",[65,408,410],{"id":409},"hiljainen-äänestäjä","Hiljainen äänestäjä",[12,412,413],{},"Hiljaisia äänestäjiä on yleensä enemmän kuin yksi, ja he pelkäävät äänestää ensimmäisinä. He odottavat, että joku muu äänestää, jotta voivat kopioida tämän. He osallistuvat keskusteluun harvoin ja vastaavat vain kysyttäessä. He äänestävät toisina, juuri ennen välinpitämättömiä äänestäjiä.",[12,415,416],{},[15,417],{"alt":410,"height":397,"loading":32,"src":418,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,420,421],{},[38,422,410],{},[65,424,426],{"id":425},"välinpitämätön-äänestäjä","Välinpitämätön äänestäjä",[12,428,429],{},"Heitä on vaikea tavoittaa toteutuksen aikana, mutta äänestyksessä heidän käytöksensä on ilmeistä. He äänestävät aina viimeisinä ja kopioivat jonkun toisen arvion. Jos arviot eroavat, he valitsevat yleisimmän. He eivät halua selittää, miksi valitsivat pienemmän tai suuremman luvun, joten he välttelevät yhteistyötä tarkennuksessa ja väistelevät kysymyksiä.",[12,431,432],{},[15,433],{"alt":426,"height":434,"loading":32,"src":435,"width":436,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,438,439],{},[38,440,426],{},[65,442,444],{"id":443},"väsynyt-äänestäjä","Väsynyt äänestäjä",[12,446,447],{},"Jotkut tiimin jäsenet eivät jaksa keskittyä pitkään ja jäävät paitsi keskustelun keskeisistä kohdista. He menettävät kontekstin ja joko arvaavat tai etsivät yleisimmän äänen kopioitavaksi.",[12,449,450],{},[15,451],{"alt":444,"height":397,"loading":32,"src":452,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,454,455],{},[38,456,444],{},[41,458,460],{"id":459},"miten-keskittyminen-säilytetään-estimoinnissa","Miten keskittyminen säilytetään estimoinnissa",[12,462,463,464,468,469,472],{},"Estimoinnilla on merkitystä, koska vain rehelliset story pointit voivat ",[49,465,467],{"href":466},"\u002Ffi\u002Fblog\u002Fcorrectly-estimating-release-deadline","pitää projektin julkaisupäivän aikataulussa",". Rehellisen estimoinnin avain on ",[268,470,471],{},"laumavaikutuksen"," vastustaminen, käytitpä paperikortteja tai ohjelmistoa.",[12,474,475],{},"Tiimin jäsenten ei pitäisi koskaan nähdä toistensa arvioita ennen kuin moderaattori paljastaa ne. Näin hiljainen äänestäjä alkaa ajatella, välinpitämätön äänestäjä kiinnostuu ja väsynyt äänestäjä herää. Paras kysymys, erityisesti kun joku on eri mieltä ryhmän kanssa, on ”miksi äänestit X story pointtia?” Se käynnistää keskustelun todellisista toteutusongelmista. Suljetut kysymykset kuten ”hyväksyisitkö X story pointtia?” houkuttelevat merkityksettömään ”kyllä”-vastaukseen.",[12,477,478],{},"Hyvä estimointityökalu tekee tarkennuksesta kiinnostavampaa ja pitää kaikki valppaina ja valmiina keskustelemaan, joten myös monimutkaiset storyt saavat parempia arvioita.",{"title":159,"searchDepth":160,"depth":160,"links":480},[481,487],{"id":362,"depth":160,"text":363,"children":482},[483,484,485,486],{"id":385,"depth":166,"text":386},{"id":409,"depth":166,"text":410},{"id":425,"depth":166,"text":426},{"id":443,"depth":166,"text":444},{"id":459,"depth":160,"text":460},"2018-04-30","Avoimet äänet antavat ensimmäisen arvion ankkuroida koko tilan. Näin laumavaikutus vääristää story pointteja ja näin planning poker pysyy rehellisenä.","Story pointtien paimentaminen","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[493,494,495,496,497],"story pointit","planning poker","ankkurointiharha","laumavaikutus","ketterä estimointi",{},"\u002Fblog\u002Ffi\u002Fsheepherding-story-points",{"title":348,"description":489},{"loc":499,"images":502,"lastmod":179},[503,504,505,506,507,508],{"loc":356},{"loc":377},{"loc":398},{"loc":418},{"loc":435},{"loc":452},"sheepherding-story-points","blog\u002Ffi\u002Fsheepherding-story-points","sW8lFVHAWPqfUwtjXkaqMUVZ0xXfNeUkeDgXPMRn3_o",{"id":513,"title":514,"author":7,"body":515,"dateModified":179,"datePublished":588,"description":589,"extension":182,"heading":590,"image":591,"imageAlt":521,"keywords":592,"locale":191,"meta":597,"navigation":193,"path":598,"reviewed":193,"seo":599,"sitemap":600,"slug":605,"stem":606,"translationKey":605,"__hash__":607},"blog\u002Fblog\u002Ffi\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","10 %:n Scrumban-sääntö jokaiseen sprinttiin | AELBOX",{"type":9,"value":516,"toc":583},[517,524,532,536,539,547,551,555,558,562,565,568,576,580],[12,518,519],{},[15,520],{"alt":521,"height":522,"loading":19,"src":523,"width":21,"fetchPriority":22},"Planning poker -kortteja ja Kanban-taulu sohvapöydällä",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,525,526,527,531],{},"Monet tiimit suunnittelevat käyttävänsä täsmälleen sitä kapasiteettia, joka näkyy heidän Jira-suunnitelmassaan. Se on usein virhe ja johtaa epäonnistuneisiin sprintteihin. Miksi näin käy, vaikka ",[49,528,530],{"href":529},"\u002Ffi\u002Fblog\u002Fthe-importance-of-predictable-velocity","kapasiteettilaskelmat"," näyttävät niin tarkoilta?",[41,533,535],{"id":534},"kiire-toimittaa-enemmän","Kiire toimittaa enemmän",[12,537,538],{},"Product Ownerit pyrkivät usein korkeampaan nopeuteen jokaisen onnistuneen sprintin jälkeen, mikä on luonnollinen reaktio viimeisimpiin tuloksiin. Jos tiimi sai viime sprintissä tietyn määrän story pointteja valmiiksi, seuraavassa odotetaan enemmän. Tämä toistuu, kunnes jokin sprint epäonnistuu. Paine on yritys testata tiimin rajoja. Kokemuksemme mukaan se toimii tarkoitustaan vastaan. Lopulta se heikentää tiimin motivaatiota, ja tiimi alkaa pitää jokaista tulevaa sprinttiä tuomittuna.",[12,540,541],{},[15,542],{"alt":543,"height":544,"loading":32,"src":545,"width":546,"decoding":34},"Tuomittu sprintti",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,548,549],{},[38,550,543],{},[41,552,554],{"id":553},"sprintin-hektinen-loppu-toimitusruuhkassa","Sprintin hektinen loppu toimitusruuhkassa",[12,556,557],{},"Kun kapasiteetti suunnitellaan täyttämään sprintti täsmälleen, mikä tahansa viivästys tai toteutunut riski luo paineen työskennellä kuumeisella tahdilla lopussa. Tiimi toimittaa silloin vähemmän kuin lupasi, koska stressi ottaa vallan. Sprintin lopun kiire pitäisi poistaa.",[41,559,561],{"id":560},"anna-tiimin-toimittaa-enemmän-omasta-tahdostaan","Anna tiimin toimittaa enemmän omasta tahdostaan",[12,563,564],{},"Suunnittele vain 90 % tiimin kapasiteetista ja varaa jäljellä oleva 10 % suunnittelemattomaan backlog-työhön. Ne tehtävät vedetään backlogista Scrumban-tyyliin sprintin aikana. Puskuri imee riskit ja antaa tiimin saada sprintin (tai ainakin sprintin tavoitteen) valmiiksi muutamaa päivää aikaisemmin. Jos ulkoinen riippuvuus uhkaa sprinttiä, puskuroitu tehtävä voi korvata ongelmallisen.",[12,566,567],{},"Se 10 % ei kuulu sprintin sitoumukseen. Jos riski ei toteudu, tiimi toimittaa sen lisätyönä; jos jokin menee pieleen, puskuri kuluu, mutta sprintin tavoite ja sitoumus saavutetaan silti. Seuraa, kuinka paljon puskuria käytetään: jos se nousee säännöllisesti esimerkiksi 20 %:iin, on aika nostaa tiimin nopeutta 10 % ja pitää 10 %:n puskuri.",[12,569,570],{},[15,571],{"alt":572,"height":573,"loading":32,"src":574,"width":575,"decoding":34},"Toimita aikaisin, toimita ylimääräistä",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,577,578],{},[38,579,572],{},[12,581,582],{},"Kokemuksemme osoittaa, että silloin työntekijät työskentelevät ilman painetta ja antavat eniten. Nopeus voi silloin kasvaa tiimin omaan tahtiin, ilman ulkoista painetta ja vähemmällä stressillä. Kasvu tuntuu luonnolliselta ja kestävältä.",{"title":159,"searchDepth":160,"depth":160,"links":584},[585,586,587],{"id":534,"depth":160,"text":535},{"id":553,"depth":160,"text":554},{"id":560,"depth":160,"text":561},"2018-04-28","Koko kapasiteettiin sitoutuminen tekee jokaisesta sprintistä hauraan. 10 %:n puskuri imee riskit, suojaa sprintin tavoitteen ja antaa nopeuden kasvaa.","10 %:n Scrumban-sääntö jokaiseen sprinttiin","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[593,594,595,596,333],"scrumban","sprintin kapasiteetti","ketterä puskuri","nopeus",{},"\u002Fblog\u002Ffi\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":514,"description":589},{"loc":598,"images":601,"lastmod":179},[602,603,604],{"loc":523},{"loc":545},{"loc":574},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Ffi\u002Fthe-10-percent-scrumban-rule-for-every-sprint","3o0RdMEUVGZ9YP1-lUlVyyAz3RzIFTg1w33sYEHrmd8",{"id":609,"title":610,"author":7,"body":611,"dateModified":179,"datePublished":788,"description":789,"extension":182,"heading":790,"image":791,"imageAlt":617,"keywords":792,"locale":191,"meta":796,"navigation":193,"path":797,"reviewed":193,"seo":798,"sitemap":799,"slug":807,"stem":808,"translationKey":807,"__hash__":809},"blog\u002Fblog\u002Ffi\u002Fcorrectly-estimating-release-deadline.md","Näin arvioit julkaisupäivän story pointeilla | AELBOX",{"type":9,"value":612,"toc":774},[613,619,622,626,633,637,640,648,652,656,659,662,666,669,677,682,686,689,693,696,700,703,710,714,718,721,725,728,736,740,744,747,752,759,767,771],[12,614,615],{},[15,616],{"alt":617,"height":18,"loading":19,"src":618,"width":21,"fetchPriority":22},"Planning poker -kortteja, Gantt-kaavio ja kahvikuppi pöydällä","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,620,621],{},"Tärkeä osa projektinhallintaa on projektin julkaisupäivän arvioiminen. Mutta miten ennustat, milloin suuri ja monimutkainen järjestelmä toimitetaan?",[41,623,625],{"id":624},"arvioinnin-ongelmat","Arvioinnin ongelmat",[12,627,628,629,632],{},"Ajoissa pysyminen edellyttää luotettavaa arviota työstä. ",[49,630,631],{"href":529},"Tehtävien arvioiminen on yleensä vaikeaa",", erityisesti kun jokaisesta tehtävästä pitää sitoutua aikaperusteiseen arvioon. Psykologisesti valmistumisajan lupaaminen on vaikeaa, ja ne lupaukset epäonnistuvat usein.",[65,634,636],{"id":635},"ajan-ongelma","Ajan ongelma",[12,638,639],{},"Ajan arvioiminen on ongelmallista yksinkertaisesta syystä: mitä monimutkaisempi tehtävä, sitä suurempi mahdollisuus myöhästyä määräajasta. Se riippuu myös siitä, kuka tehtävän ottaa. Tiimin jäsenet työskentelevät eri nopeudella ja saavat aikaan eri määriä työtä. Koska saatavuus muuttuu lomien ja koulutusten myötä, nopeimman tiimin jäsenen arvioima tehtävä voi päätyä hitaimmalle. Siisti Gantt-kaavio muuttuu sotkuksi: tehtävät myöhästyvät, ja johtajat huolehtivat jatkuvasti, ehtiikö projekti valmistua ajoissa.",[12,641,642],{},[15,643],{"alt":644,"height":645,"loading":32,"src":646,"width":647,"decoding":34},"Rikkinäinen Gantt-kaavio",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,649,650],{},[38,651,644],{},[65,653,655],{"id":654},"vastustus-aika-arvioita-kohtaan","Vastustus aika-arvioita kohtaan",[12,657,658],{},"Kun toteuttajilta pyydetään arviota, he usein vastustavat: jos arvio ei pidä, ketä syytetään? Ja jos yhden henkilön arvioima tehtävä päätyy jollekin toiselle, ketä syytetään, kun todellinen aika poikkeaa?",[12,660,661],{},"Seurauksena on haluttomuus arvioida lainkaan, mikä vaikeuttaa johdon mahdollisuuksia arvioida toimituspäiviä kunnolla.",[41,663,665],{"id":664},"story-pointtien-käyttö","Story pointtien käyttö",[12,667,668],{},"Story pointit tarjoavat vaihtoehdon aikaperusteisille arvioille. Story point ei ole kiinteä työn yksikkö, vaan suhteellinen arvio, joka kasvaa eksponentiaalisesti. Koko tiimi arvioi yhdessä tarkennuksessa.",[12,670,671],{},[15,672],{"alt":673,"height":674,"loading":32,"src":675,"width":676,"decoding":34},"Esimerkki story pointeista",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,678,679],{},[38,680,681],{},"Esimerkkiarvioita",[65,683,685],{"id":684},"vastuun-jakaminen","Vastuun jakaminen",[12,687,688],{},"Story pointeilla koko tiimi arvioi jokaisen tehtävän. Arvio hyväksytään, kun kaikki ovat siitä samaa mieltä. Näin vältetään myöhemmät väittelyt siitä, kuka tehtävän arvioi ja kuinka kauan se todella kesti. Tiimi sopi asiasta etukäteen, joten vastuu on yhteinen.",[65,690,692],{"id":691},"monimutkaisuuden-arviointi","Monimutkaisuuden arviointi",[12,694,695],{},"Story pointit kuvaavat tehtävän monimutkaisuutta, mukaan lukien ulkoiset riippuvuudet ja riskin siitä, että jokin menee pieleen. Koska ne eivät ole sitoumus fyysiseen mittariin kuten aikaan, tiimin on helpompi antaa niitä.",[65,697,699],{"id":698},"pienin-arvio","Pienin arvio",[12,701,702],{},"Koska story pointit ovat suhteellisia, tarvitset lähtökohdan. Ankkuri on pienin työn yksikkö, joka vaatii jonkin verran toteutustyötä. Se on pienin työmäärä, jonka tiimi voi arvioida.",[12,704,705],{},[15,706],{"alt":699,"height":707,"loading":32,"src":708,"width":709,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,711,712],{},[38,713,699],{},[65,715,717],{"id":716},"suurin-arvio","Suurin arvio",[12,719,720],{},"Story pointit kasvavat eksponentiaalisesti osoittaakseen, että mitä monimutkaisempi tehtävä, sitä vaikeampi se on arvioida. Asteikko voi jatkua äärettömyyteen (∞), vaikka sitä arviota käytetään harvoin. Suurimman arvion pitäisi vastata suurinta työmäärää, jonka yksi henkilö saa sprintissä keskimäärin valmiiksi. Myös sprintin pituuden pitäisi vastata suurinta työmäärää, jonka yksi henkilö pystyy hoitamaan menettämättä otetta tehtävästä.",[65,722,724],{"id":723},"tehtävät-jotka-ylittävät-suurimman-arvion","Tehtävät, jotka ylittävät suurimman arvion",[12,726,727],{},"Jotkin tehtävät saavat enemmän story pointteja kuin yksi henkilö saa sprintissä valmiiksi. Niiden laittaminen sprinttiin aiheuttaa työn siirtymisen seuraavalle sprintille. Siirtyvä työ saa sprintin tuntumaan keskeneräiseltä ja työn vaikuttamaan loputtomalta. Yli tuon rajan arvioidut tehtävät pitää pilkkoa pienempiin yksiköihin ja arvioida uudelleen.",[12,729,730],{},[15,731],{"alt":732,"height":733,"loading":32,"src":734,"width":735,"decoding":34},"13 story pointin pilkkominen",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,737,738],{},[38,739,732],{},[41,741,743],{"id":742},"story-point-nopeus","Story point -nopeus",[12,745,746],{},"Nopeus on keskimääräinen story pointtien määrä, jonka tiimi saa sprintissä valmiiksi täydellä saatavuudella. Saatavuus on osuus sprintistä, jonka tiimi voi todella käyttää projektityöhön lomien, koulutusten ja tuen jälkeen. Kapasiteetti on nopeus kerrottuna saatavuudella.",[12,748,749],{},[38,750,751],{},"kapasiteetti = nopeus × saatavuus",[12,753,754,755,758],{},"Koska kapasiteetti ilmaistaan story pointteina, se voidaan muuntaa ajaksi tiimin story point -aikasuhdetta käyttäen. Kun ",[49,756,757],{"href":529},"nopeus on ennustettava",", julkaisupäivä voidaan arvioida tarkasti. Story pointteihin ja sprintteihin perustuva Gantt-kaavio on vakaa ja ennustettava:",[12,760,761],{},[15,762],{"alt":763,"height":764,"loading":32,"src":765,"width":766,"decoding":34},"Korjattu Gantt-kaavio",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,768,769],{},[38,770,763],{},[12,772,773],{},"Tässä on muutos: kun nopeus on vakaa, julkaisupäivästä tulee laskelma eikä arvaus.",{"title":159,"searchDepth":160,"depth":160,"links":775},[776,780,787],{"id":624,"depth":160,"text":625,"children":777},[778,779],{"id":635,"depth":166,"text":636},{"id":654,"depth":166,"text":655},{"id":664,"depth":160,"text":665,"children":781},[782,783,784,785,786],{"id":684,"depth":166,"text":685},{"id":691,"depth":166,"text":692},{"id":698,"depth":166,"text":699},{"id":716,"depth":166,"text":717},{"id":723,"depth":166,"text":724},{"id":742,"depth":160,"text":743},"2018-04-14","Aika-arviot pettävät, kun monimutkaisuus ja saatavuus muuttuvat. Näin story pointit, yhteiset arviot ja nopeus tekevät julkaisupäivistä ennustettavia.","Näin arvioit julkaisun määräajan","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[793,493,497,794,795],"julkaisupäivä","sprintin nopeus","kapasiteettisuunnittelu",{},"\u002Fblog\u002Ffi\u002Fcorrectly-estimating-release-deadline",{"title":610,"description":789},{"loc":797,"images":800,"lastmod":179},[801,802,803,804,805,806],{"loc":618},{"loc":646},{"loc":675},{"loc":708},{"loc":734},{"loc":765},"correctly-estimating-release-deadline","blog\u002Ffi\u002Fcorrectly-estimating-release-deadline","2vX5OXMCMgTcw8EWWQrgHucGUOm8RuvnSC817zbw51Y",{"id":811,"title":812,"author":7,"body":813,"dateModified":179,"datePublished":788,"description":959,"extension":182,"heading":960,"image":961,"imageAlt":819,"keywords":962,"locale":191,"meta":965,"navigation":193,"path":966,"reviewed":193,"seo":967,"sitemap":968,"slug":974,"stem":975,"translationKey":974,"__hash__":976},"blog\u002Fblog\u002Ffi\u002Fthe-importance-of-predictable-velocity.md","Ennustettava nopeus: luotettavat sprintit | AELBOX",{"type":9,"value":814,"toc":949},[815,821,824,828,831,834,837,845,849,853,856,860,863,866,873,880,884,888,891,894,897,900,904,907,910,917,921,925,933,936,940,946],[12,816,817],{},[15,818],{"alt":819,"height":18,"loading":19,"src":820,"width":21,"fetchPriority":22},"Planning poker -kortteja ja sekuntikello sohvapöydällä","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,822,823],{},"Ennustettava nopeus tarkoittaa kykyä tietää etukäteen, kuinka paljon työtä tiimi saa tietyssä jaksossa valmiiksi saatavuutensa perusteella.",[41,825,827],{"id":826},"vaihtelevan-nopeuden-ongelma","Vaihtelevan nopeuden ongelma",[12,829,830],{},"Kun nopeus vaihtelee sprintistä toiseen, julkaisun suunnittelusta tulee vaikeaa. Kukaan ei tiedä, milloin työ valmistuu, ja koko Scrum-prosessi hajoaa. Kaaos ottaa vallan, eikä se tee hyvää tiimin motivaatiolle.",[12,832,833],{},"Vaihteleva nopeus johtuu yleensä siitä, että tiimin jäsenet yrittävät parhaansa ja sitoutuvat enemmän kuin pystyvät toimittamaan. Yhteistyöhön perustuvassa ympäristössä, jossa kehitysprosessi on hyvin rakennettu, tehtävään kuuluu muutakin kuin suoraviivainen toteutus. Joillakin tiimin jäsenillä käy tuuri, ja he saavat tehtäviä, jotka on suhteellisen helppo toteuttaa, kun taas toiset törmäävät ongelmaan, jota kukaan ei osannut odottaa. Yhdessä sprintissä nopeus näyttää korkealta, koska tiimi saa valmiiksi edelliseltä sprintiltä siirtyneitä töitä; seuraavassa se laskee, koska uutta työtä siirtyy seuraavalle sprintille.",[12,835,836],{},"Siirtyvät työt luovat vaikutelman, että tiimi suoriutuu heikosti: se voisi tehdä enemmän, mutta aina jokin arvaamaton tulee tielle. Johto huomaa ongelman, näkee myöhästyneet määräajat, ja tiimin jäsenten välinen jännite kasvaa.",[12,838,839],{},[15,840],{"alt":841,"height":842,"loading":32,"src":843,"width":844,"decoding":34},"Tavallinen sprintti ja seuraavalle siirtyvät työt",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,846,847],{},[38,848,841],{},[41,850,852],{"id":851},"ennustettavuuden-ylläpitämisen-yleiset-ongelmat","Ennustettavuuden ylläpitämisen yleiset ongelmat",[12,854,855],{},"Ongelmat vaihtelevat projekteittain, mutta monet niistä ovat yhteisiä kaikille projektityypeille. Tässä tavallisimmat ja niihin käytännön ratkaisut.",[65,857,859],{"id":858},"varaudu-odottamattomaan","Varaudu odottamattomaan",[12,861,862],{},"Jotkin tehtävät vaativat taustatutkimusta ennen kuin ne voi aloittaa. Kuvittele ominaisuus, joka riippuu kolmannen osapuolen yrityksestä, joka ei ehkä vastaa silloin, kun tarvitset sitä. Tai ominaisuus, jota ei voi toteuttaa suunnitellusti, koska tiimi ymmärsi taustalla olevan teknologian väärin tehtävää luodessaan.",[12,864,865],{},"Jos tällainen tehtävä lisätään sprinttiin ilman tarvittavaa taustatutkimusta, se todennäköisesti kestää odotettua kauemmin, ja arviota syytetään. Joku voisi sanoa, että aihetta varten tarvitaan ensin spike. Mutta mistä tiedät, mitkä tehtävät sellaisen tarvitsevat?",[12,867,868,869,872],{},"Ainoa keino on ",[49,870,871],{"href":301},"aloittaa tehtävän työstäminen etukäteen",". Aloittaminen ennen kuin tehtävä on suunniteltu mahdollistaa ongelmien löytämisen ennen kuin ne ilmenevät. Tällä tavalla tehtävä tulee sprinttiin vasta, kun se on selkeä ja osa työstä on jo tehty.",[12,874,875],{},[15,876],{"alt":877,"height":842,"loading":32,"src":878,"width":879,"decoding":34},"Sprinttejä, joissa tehtävät on aloitettu etukäteen","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,881,882],{},[38,883,877],{},[65,885,887],{"id":886},"vältä-epämääräisiä-tehtävän-määrittelyjä","Vältä epämääräisiä tehtävän määrittelyjä",[12,889,890],{},"Jotkin tehtävät näyttävät tekijänsä mielestä hyviltä mutta jättävät pois tärkeitä yksityiskohtia. Jotkut toteutuksen yksityiskohdat voivat vaikuttaa merkittävästi toimitukseen.",[12,892,893],{},"Liiketoiminnan sidosryhmät voivat väittää, ettei tehtävän määrittelyissä pitäisi olla teknisiä yksityiskohtia, mutta toteuttajat pitävät liiketoimintavaatimuksia usein liian epämääräisinä toimiakseen niiden pohjalta.",[12,895,896],{},"Ratkaisu on tekninen suunnitteludokumentti, johon toteutustehtävä viittaa. Se tekee selväksi, mitä täsmälleen pitää rakentaa.",[12,898,899],{},"Myös teknisten yksityiskohtien lisääminen tehtävän kuvaukseen auttaa: toteuttajat tietävät, mitä pitää tehdä, ja voivat huomata mahdolliset ongelmat ajoissa.",[65,901,903],{"id":902},"pienennä-kapasiteettia-fibonacci-jonolla","Pienennä kapasiteettia Fibonacci-jonolla",[12,905,906],{},"Joskus tiimin jäsenet pitävät lomaa tai sprintin sisään osuu julkinen vapaapäivä. Koulutukset ja sisäiset tapahtumat pienentävät myös saatavuutta: sitä aikaa, jonka tiimi voi käyttää projektityöhön. Silloin kapasiteettia pitää pienentää vastaamaan puuttuvia henkilöitä.",[12,908,909],{},"Nopeuden oletetaan olevan vakio, mutta se lasketaan tiimin kaikkien jäsenten keskimääräisestä nopeudesta. Oletetaan yksinkertaisuuden vuoksi, että yksi henkilö saa valmiiksi yhden story pointin päivässä. Jos yksi henkilö on poissa yhden päivän, pienennä sprintin kapasiteettia yhdellä story pointilla. Jos kaksi henkilöä on poissa kaksi päivää (neljä story pointtia), pienennä kapasiteettia viidellä story pointilla (seuraava Fibonacci-luku) neljän sijaan. Jos kaksi henkilöä on poissa kolme päivää, pienennä kapasiteettia kahdeksalla pisteellä kuuden sijaan, jotta riippuvuusriski tulee huomioitua.",[12,911,912],{},[15,913],{"alt":914,"height":842,"loading":32,"src":915,"width":916,"decoding":34},"Sitoudutaan pienempään kapasiteettiin kuin laskettiin","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,918,919],{},[38,920,914],{},[65,922,924],{"id":923},"vältä-riippuvaisia-tehtäviä","Vältä riippuvaisia tehtäviä",[12,926,927,928,932],{},"Usein yksi henkilö tekee tehtävän, josta toisen tiimin jäsenen tehtävä riippuu. Näin syntyy ",[49,929,931],{"href":930},"\u002Ffi\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","riippuvuuksia tiimin sisällä tai tiimien välillä",". Jos ensimmäinen tehtävä myöhästyy, jokainen siitä riippuva tehtävä viivästyy. Tiimin jäsenet odottavat toimettomina ja kiirehtivät sitten, kun riippuvuus on selvitetty, mikä tuhlaa arvokasta aikaa.",[12,934,935],{},"Riippuvaiset tehtävät voi aloittaa aiemmin, niin että seuraavaan sprinttiin mennessä kriittiset alkupään tehtävät ovat lähes valmiita. Se pienentää riippuvuuden vaikutusta kuluvan sprintin nopeuteen.",[65,937,939],{"id":938},"arvioi-rehellisesti","Arvioi rehellisesti",[12,941,942,945],{},[49,943,944],{"href":287},"Tehtävien rehellinen arviointi"," on vaikeaa ja vaatii koko tiimin huomiota. Jokaisen pitäisi arvioida ilman muiden jäsenten arvioiden vaikutusta. Vain rehelliset arviot näyttävät, kuinka kauan epic todella kestää, ja pitävät julkaisupäivät realistisina.",[12,947,948],{},"Ennustettava nopeus ei ole työkalu tai mittari, jonka määräät tiimille; se on tulos siitä, että yllätykset poistetaan yksi kerrallaan. Aloita yllä olevista viidestä korjauksesta, niin julkaisupäivä lakkaa olemasta arvailua.",{"title":159,"searchDepth":160,"depth":160,"links":950},[951,952],{"id":826,"depth":160,"text":827},{"id":851,"depth":160,"text":852,"children":953},[954,955,956,957,958],{"id":858,"depth":166,"text":859},{"id":886,"depth":166,"text":887},{"id":902,"depth":166,"text":903},{"id":923,"depth":166,"text":924},{"id":938,"depth":166,"text":939},"Miksi nopeus vaihtelee sprintistä toiseen ja miten sitoumuksista tulee ennustettavia: viisi käytännön korjausta suunnitteluun, kapasiteettiin ja riippuvuuksiin.","Ennustettavan nopeuden merkitys","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[963,794,497,493,964],"ennustettava nopeus","julkaisun suunnittelu",{},"\u002Fblog\u002Ffi\u002Fthe-importance-of-predictable-velocity",{"title":812,"description":959},{"loc":966,"images":969,"lastmod":179},[970,971,972,973],{"loc":820},{"loc":843},{"loc":878},{"loc":915},"the-importance-of-predictable-velocity","blog\u002Ffi\u002Fthe-importance-of-predictable-velocity","4QV-wqOcwP6_kv168_mg_Q3jMAz7mwRgkjZKwj9_zxM",1795345548260]