[{"data":1,"prerenderedAt":977},["ShallowReactive",2],{"blog-index-cs":3},[4,204,346,511,607,810],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fcs\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Závislosti ve sprintu a zřetězené pull requesty | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Kovový řetěz, karty planning pokeru a hrnek kávy na stole",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprinty často obsahují závislé tikety, ať už v rámci jednoho týmu, nebo mezi několika Scrum týmy. V dokonalém světě by závislosti neexistovaly; v praxi vyhrávají potřeby byznysu a závislosti se přidávají, aby se zkrátil cyklus vydání. Tento článek popisuje jeden způsob, jak závislé úkoly v softwarových týmech řídit.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Závislosti mezi úkoly",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"starý-způsob","Starý způsob",[12,46,47,48,53],{},"Přímočarý přístup je začít s úkolem, jakmile je jeho závislost sloučená do hlavní větve. Při tomto přístupu někteří členové týmu sedí bez práce, dokud úkol není připravený. Nakonec na zbývající závislé úkoly nezbývá téměř žádný čas, nebo už vůbec žádný. Poslední úkoly se přesouvají do dalšího sprintu a ",[49,50,52],"a",{"href":51},"\u002Fcs\u002Fblog\u002Fcomparison-metrics-for-agile-teams","tým není spokojený",".",[12,55,56],{},"Proč se to děje, i když je kapacita správně odhadnutá? Většinou kvůli prostojům při čekání na kolegy. I malá zpoždění se sčítají, zvlášť v krátkých sprintech.",[41,58,60],{"id":59},"souběžná-práce-na-závislých-úkolech","Souběžná práce na závislých úkolech",[12,62,63],{},"Existuje způsob, jak to udělat s malou režií. Když členové týmu pracují na úkolech souběžně, má to několik výhod.",[65,66,68],"h3",{"id":67},"lepší-spolupráce","Lepší spolupráce",[12,70,71],{},"Když členové týmu pracují souběžně na závislých úkolech, připomíná to párové programování. Jeden člověk musí rozumět nadřazenému úkolu, druhý podřízenému. Tým získá širší znalost řešených problémů.",[65,73,75],{"id":74},"vyhnutí-se-prostojům","Vyhnutí se prostojům",[12,77,78],{},"Když úkoly běží souběžně, nikdo nečeká, až přistane oprava. Všichni mohou pracovat najednou a otázky se řeší operativněji.",[65,80,82],{"id":81},"pull-requesty-připravené-k-revizi-kódu-dřív","Pull requesty připravené k revizi kódu dřív",[12,84,85],{},"Když vaše větev vychází z větve kolegy, schválení původního pull requestu je snazší. Už rozumíte tomu, jak byl nadřazený tiket implementovaný, a původní větev byla během implementace testovaná a revidovaná. Už to není neznámé území.",[41,87,89],{"id":88},"používání-zřetězených-vrstvených-pull-requestů","Používání zřetězených (vrstvených) pull requestů",[12,91,92],{},"Tato míra souběžnosti vyžaduje správné nástroje. S verzovacím systémem založeným na Gitu je to přímočaré. Následující kroky proces popisují.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Strom závislostí",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Strom závislostí (souběžná práce na 6 závislých úkolech)",[65,107,109],{"id":108},"jasně-načrtněte-závislosti","Jasně načrtněte závislosti",[12,111,112],{},"Řetěz závislostí definujte při plánování sprintu. Řetěz pull requestů pak tuto definici přesně dodržuje. Měnit řetěz uprostřed vývoje je drahé kvůli rebase.",[65,114,116],{"id":115},"začněte-kořenovými-úkoly","Začněte kořenovými úkoly",[12,118,119],{},"Každý řetěz závislostí má kořenové úkoly, které nezávisí na ničem jiném. Práce na nich může začít hned první den.",[65,121,123],{"id":122},"nejdřív-udělejte-jádro-implementace","Nejdřív udělejte jádro implementace",[12,125,126],{},"To může být v rozporu s vývojem řízeným testy, kde testy přicházejí první. Aby řetěz pull requestů zůstal zvládnutelný, implementujte nejdřív jádro. Členové týmu, jejichž úkoly na něm závisí, se tak dostanou k práci dřív.",[65,128,130],{"id":129},"organizujte-a-revidujte-ve-frontě-fifo","Organizujte a revidujte ve frontě FIFO",[12,132,133],{},"První vytvořená větev by měla být revidovaná a sloučená první. Každé sloučení spustí CI; pokud rozbije hlavní build, problém se opraví, dokud je ještě malý.",[41,135,137],{"id":136},"režie-navíc","Režie navíc",[12,139,140],{},"Udržovat řetěz závislých větví má výhody, ale i některé nevýhody.",[65,142,144],{"id":143},"rebase-nebo-slučování","Rebase nebo slučování",[12,146,147],{},"Řetěz je třeba udržovat v synchronizaci, což vyžaduje úsilí. Moderní nástroje nabízejí synchronizaci se základní větví jedním klikem, když nejsou konflikty. Používejte ji podle potřeby, když je bezpečné načíst změny z nadřazené větve. Když je build zelený a funkce funguje, synchronizujte.",[65,149,151],{"id":150},"týmová-práce","Týmová práce",[12,153,154],{},"Řetěz závislostí potřebuje spolupracující tým, jehož členové jsou ochotní se spolu bavit. Nemůže fungovat, když lidé pracují izolovaně.",[12,156,157],{},"Závislé tikety je nejlepší držet mimo aktuální sprint. Když potřeby byznysu vyžadují jejich paralelní běh, řetěz odvozených větví je praktický způsob, jak zvládnout režii spojenou se závislostmi.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Závislé tikety zdržují sprint, zatímco lidé čekají. Jak zřetězené pull requesty udrží práci v pohybu a sníží prostoje.","md","Řízení závislostí ve sprintu pomocí zřetězených pull requestů","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"závislosti ve sprintu","zřetězené pull requesty","vrstvené pull requesty","revize kódu","agilní dodávání","cs",{},true,"\u002Fblog\u002Fcs\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fcs\u002Fmanage-sprint-dependencies-with-chained-pull-requests","j-Zng8Y67qqJWb6jVmr5hg8_Eb540n8Y5axPlL8slhg",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":325,"description":326,"extension":182,"heading":327,"image":328,"imageAlt":213,"keywords":329,"locale":191,"meta":335,"navigation":193,"path":336,"reviewed":193,"seo":337,"sitemap":338,"slug":343,"stem":344,"translationKey":343,"__hash__":345},"blog\u002Fblog\u002Fcs\u002Fcomparison-metrics-for-agile-teams.md","Srovnávací metriky pro agilní týmy | AELBOX",{"type":9,"value":208,"toc":316},[209,216,219,223,226,234,238,242,245,249,252,260,264,272,276,279,282,289,293,296,303,306,310,313],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Pravítko, karty planning pokeru a hrnek kávy na stole",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Srovnávat agilní týmy je obtížné a stojí za to se ptát, proč je vůbec srovnáváme. Jak vlastně pomáhá srovnávání týmů z různých oblastí?",[41,220,222],{"id":221},"vytvoření-soutěže","Vytvoření soutěže",[12,224,225],{},"Týmy by se neměly stavět proti sobě podle libovolných metrik. To lidi jen demotivuje. Metriky mají místo toho dát každému týmu stejnou příležitost soutěžit. Výkon se pak zlepšuje proto, že týmy chtějí, ne proto, že je někdo tlačí.",[12,227,228],{},[15,229],{"alt":230,"height":231,"loading":32,"src":232,"width":233,"decoding":34},"Vytvořte soutěž",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,235,236],{},[38,237,230],{},[41,239,241],{"id":240},"metriky-pro-rovné-příležitosti","Metriky pro rovné příležitosti",[12,243,244],{},"Tady jsou čtyři základní metriky pro srovnávání týmů. Měří jen schopnost každého týmu soutěžit za rovných podmínek, nic víc. Srovnatelné metriky vytvářejí rovné příležitosti.",[65,246,248],{"id":247},"úspěšné-sprinty","Úspěšné sprinty",[12,250,251],{},"Kdyby byl sprint jen časovým rámcem, neměl by žádný smysl. Sprint je milník a potřebuje cíl. Cíl sprintu (nejdůležitější sada příběhů) je větší milník; dokončení každého příběhu je ten menší. Na konci každého sprintu uspořádejte demo napříč týmy, kde týmy předvedou, co dodaly. Ta zdravá soutěživost týmy povzbuzuje, aby své cíle sprintu dokončily. Lidé potřebují viditelný cíl, aby byli motivovaní.",[12,253,254],{},[15,255],{"alt":256,"height":257,"loading":32,"src":258,"width":259,"decoding":34},"Sprint za cílem",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,261,262],{},[38,263,256],{},[12,265,266,267,271],{},"Nemůže se z toho stát hra na přehnané a podceněné závazky? Když tým podcení závazek, demo to ukáže: je toho méně k předvedení. Když to přežene, demo se stane ",[268,269,270],"strong",{},"dalším neúspěšným sprintem",". Dodání toho, k čemu se tým zavázal, buduje motivaci dělat víc. Týmy cítí uspokojení z práce.",[65,273,275],{"id":274},"stabilita-rychlosti-a-poctivé-odhadování","Stabilita rychlosti a poctivé odhadování",[12,277,278],{},"Tohle je duševní práce, ne práce u montážní linky. Když nikdo v týmu problému nerozumí natolik, aby odhadl jeho řešení, problém nebyl předem prozkoumaný.",[12,280,281],{},"Časově ohraničený spike v předchozím sprintu a následná revize zjištění s týmem usnadní rozdělit implementaci na menší příběhy a řádně je odhadnout. U složité práce napište podrobnější dokument technického designu, který implementační příběhy vypíše.",[12,283,284,285,53],{},"Spike i práce na designu jsou samy o sobě příběhy, které lze odhadnout. Klíčem je definovat strukturu a sled práce u složitého řešení. Místo závazku k příběhu, kterému tým nerozumí, vytvořte výzkumný úkol, který mezeru zaplní. Odhad pak ",[49,286,288],{"href":287},"\u002Fcs\u002Fblog\u002Fsheepherding-story-points","stojí na důkazech",[65,290,292],{"id":291},"předvídatelnost-kapacity-vyhýbání-se-nečekané-práci","Předvídatelnost kapacity (vyhýbání se nečekané práci)",[12,294,295],{},"Nejdřív je výzkum, potom implementace. Jak výzkum odhaluje problémy, vznikají nové tikety a ty se odhadují. Pak máte o dalším sprintu mnohem jasnější představu. Známou práci lze odhadnout a naplánovat; neznámá práce dostane časově ohraničený výzkumný tiket, než se odhadne. Disciplína spočívá v dělení velké práce na malé, odhadnutelné kousky.",[12,297,298,299,53],{},"Složitá práce může začít dřív, i kdyby jen proto, aby se zjistilo, že potřebuje vlastní sadu příběhů. I to snižuje ",[49,300,302],{"href":301},"\u002Fcs\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","riziko neznámého",[12,304,305],{},"Podpora a hašení produkčních problémů obvykle běží v časově ohraničeném kanbanovém toku mimo sprint. Tam se srovnávacími metrikami stávají doba do první reakce a porušení SLA.",[65,307,309],{"id":308},"dostupnost-týmu-čas-strávený-na-úkolech-dělený-celkovým-časem-ve-sprintu","Dostupnost týmu (čas strávený na úkolech dělený celkovým časem ve sprintu)",[12,311,312],{},"Dostupnost je podíl času, který členové týmu věnují odhadnuté práci. Pokud jeden tým odchází na školení, sdílení znalostí nebo jinou interní práci častěji než ostatní, nerovnováhu napravte. Jediný způsob, jak udržet stabilní rychlost, je udržet stabilní dostupnost. Když je dostupnost mezi týmy stejná, ostatní srovnávací metriky budou fungovat.",[12,314,315],{},"Srovnávání týmů nemá trestat slabý výkon, ale zvyšovat motivaci a chuť soutěžit a dodat víc. Proto by tyto metriky neměly být viditelné jednotlivým členům týmu: jsou nástrojem koučinku, ne veřejného žebříčku. Když tyto metriky sledujete a Scrum Mastery vedete nepřímo, dáváte týmům rovné podmínky pro soutěž.",{"title":159,"searchDepth":160,"depth":160,"links":317},[318,319],{"id":221,"depth":160,"text":222},{"id":240,"depth":160,"text":241,"children":320},[321,322,323,324],{"id":247,"depth":166,"text":248},{"id":274,"depth":166,"text":275},{"id":291,"depth":166,"text":292},{"id":308,"depth":166,"text":309},"2018-05-04","Metriky mají vytvářet rovné podmínky, ne žebříček. Čtyři srovnávací metriky, které agilní týmy motivují, aniž by je trestaly.","Srovnávací metriky pro agilní týmy","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[330,331,332,333,334],"agilní metriky","rychlost týmu","agilní týmy","scrum","kapacita",{},"\u002Fblog\u002Fcs\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":326},{"loc":336,"images":339,"lastmod":179},[340,341,342],{"loc":215},{"loc":232},{"loc":258},"comparison-metrics-for-agile-teams","blog\u002Fcs\u002Fcomparison-metrics-for-agile-teams","2y2zT2ZsbxK_FjTGAGAMac5AxDIrnp7HafVmvzT391Y",{"id":347,"title":348,"author":7,"body":349,"dateModified":179,"datePublished":487,"description":488,"extension":182,"heading":489,"image":490,"imageAlt":355,"keywords":491,"locale":191,"meta":497,"navigation":193,"path":498,"reviewed":193,"seo":499,"sitemap":500,"slug":508,"stem":509,"translationKey":508,"__hash__":510},"blog\u002Fblog\u002Fcs\u002Fsheepherding-story-points.md","Efekt stáda ve story pointech: ukotvení | AELBOX",{"type":9,"value":350,"toc":478},[351,357,360,364,371,379,383,387,390,393,400,404,407,411,414,419,423,427,430,437,441,445,448,453,457,461,472,475],[12,352,353],{},[15,354],{"alt":355,"height":18,"loading":19,"src":356,"width":21,"fetchPriority":22},"Stádo ovcí a karty planning pokeru na konferenčním stolku","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,358,359],{},"Odhadování story pointů se často odbývá, nebo probíhá v chatovacích místnostech a otevřených schůzkách, kde všichni vidí nebo slyší každý hlas. Když člověk ví, jak hlasovali ostatní, výsledek se zkreslí a odhady jsou nepřesné. Opakované nepřesné odhady vedou k chybným plánům a zpožděným nebo zrušeným dodávkám. Tady je, co se při otevřeném hlasování děje.",[41,361,363],{"id":362},"postavy-hlasování","Postavy hlasování",[12,365,366,367,370],{},"Při otevřeném hlasování o odhadu se objevuje několik postav. Odhad závisí na tom, kdo hlasuje první, a obvykle má k poctivosti daleko. Proč na pořadí při otevřeném hlasování tolik záleží? Kvůli ",[268,368,369],{},"efektu stáda",": zkreslení ukotvením, které nutí ostatní členy týmu opsat první odhad.",[12,372,373],{},[15,374],{"alt":375,"height":376,"loading":32,"src":377,"width":378,"decoding":34},"Efekt stáda",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,380,381],{},[38,382,375],{},[65,384,386],{"id":385},"příliš-sebejistý-hlasující","Příliš sebejistý hlasující",[12,388,389],{},"V každém týmu je aspoň jeden člověk, který věří, že systému rozumí nejlépe. Obvykle hlasuje první, protože mu odpovědi připadají zřejmé. Často přehlédne detaily, které mohou odhad zbořit. Ty detaily jde odhalit předem, ale jen když někdo otevře diskusi. Při otevřeném hlasování k tomu nedojde.",[12,391,392],{},"Ten člověk obvykle hlasuje níž, než by byl poctivý odhad. Možná by ten příběh tak rychle zvládl jen on, a jen se štěstím.",[12,394,395],{},[15,396],{"alt":386,"height":397,"loading":32,"src":398,"width":399,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,401,402],{},[38,403,386],{},[12,405,406],{},"Všichni ostatní se přidají, takže úkol vypadá snadno a zvládnutelně pro kohokoli v daném čase. V praxi ho pak obvykle dělá někdo jiný.",[65,408,410],{"id":409},"tichý-hlasující","Tichý hlasující",[12,412,413],{},"Tichých hlasujících je obvykle víc než jeden a bojí se hlasovat první. Čekají, až zahlasuje někdo jiný, aby to mohli opsat. Do diskuse se zapojují zřídka a odpovídají jen na vyzvání. Hlasují druzí, těsně před nezúčastněnými.",[12,415,416],{},[15,417],{"alt":410,"height":397,"loading":32,"src":418,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,420,421],{},[38,422,410],{},[65,424,426],{"id":425},"nezúčastněný-hlasující","Nezúčastněný hlasující",[12,428,429],{},"Během implementace je těžké je zastihnout, ale při hlasování je jejich chování zřejmé. Vždy hlasují poslední a opisují odhad někoho jiného. Když se odhady liší, vyberou ten nejčastější. Nechtějí vysvětlovat, proč zvolili nižší nebo vyšší číslo, takže se vyhýbají spolupráci při vylaďování a uhýbají před otázkami.",[12,431,432],{},[15,433],{"alt":426,"height":434,"loading":32,"src":435,"width":436,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,438,439],{},[38,440,426],{},[65,442,444],{"id":443},"unavený-hlasující","Unavený hlasující",[12,446,447],{},"Někteří členové týmu se nedokážou dlouho soustředit a propásnou klíčové části diskuse. Ztratí kontext a pak buď hádají, nebo pátrají po nejčastějším hlasu, který by opsali.",[12,449,450],{},[15,451],{"alt":444,"height":397,"loading":32,"src":452,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,454,455],{},[38,456,444],{},[41,458,460],{"id":459},"jak-udržet-pozornost-při-odhadování","Jak udržet pozornost při odhadování",[12,462,463,464,468,469,471],{},"Odhady jsou důležité, protože jen poctivé story pointy dokážou ",[49,465,467],{"href":466},"\u002Fcs\u002Fblog\u002Fcorrectly-estimating-release-deadline","udržet projekt na cestě k termínu vydání",". Klíčem k poctivému odhadu je jít proti ",[268,470,369],{},", ať už používáte papírové karty, nebo software.",[12,473,474],{},"Členové týmu by nikdy neměli vidět odhady ostatních, dokud je moderátor neodhalí. Tak se tichý hlasující začne zamýšlet, nezúčastněný se zapojí a unavený se probudí. Nejlepší otázka, zvlášť když někdo nesouhlasí se skupinou, je „proč jste hlasoval X story pointů?“ Ta spustí rozhovor o skutečných implementačních problémech. Uzavřené otázky typu „souhlasil byste s X story pointy?“ zvou jen bezvýznamné „ano“.",[12,476,477],{},"Dobrý nástroj pro odhadování dělá vylaďování zajímavějším a udržuje všechny v pozoru a připravené diskutovat, takže i složité příběhy dostanou lepší odhady.",{"title":159,"searchDepth":160,"depth":160,"links":479},[480,486],{"id":362,"depth":160,"text":363,"children":481},[482,483,484,485],{"id":385,"depth":166,"text":386},{"id":409,"depth":166,"text":410},{"id":425,"depth":166,"text":426},{"id":443,"depth":166,"text":444},{"id":459,"depth":160,"text":460},"2018-04-30","Otevřené hlasování nechává první odhad ukotvit celou místnost. Jak efekt stáda zkresluje story pointy a jak vést planning poker poctivě.","Efekt stáda ve story pointech","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[492,493,494,495,496],"story pointy","planning poker","efekt ukotvení","efekt stáda","agilní odhadování",{},"\u002Fblog\u002Fcs\u002Fsheepherding-story-points",{"title":348,"description":488},{"loc":498,"images":501,"lastmod":179},[502,503,504,505,506,507],{"loc":356},{"loc":377},{"loc":398},{"loc":418},{"loc":435},{"loc":452},"sheepherding-story-points","blog\u002Fcs\u002Fsheepherding-story-points","bqc5y44U7MIw2PrlxklVWsUaSzXIrgLu0aJa9ckxxgo",{"id":512,"title":513,"author":7,"body":514,"dateModified":179,"datePublished":587,"description":588,"extension":182,"heading":589,"image":590,"imageAlt":520,"keywords":591,"locale":191,"meta":596,"navigation":193,"path":597,"reviewed":193,"seo":598,"sitemap":599,"slug":604,"stem":605,"translationKey":604,"__hash__":606},"blog\u002Fblog\u002Fcs\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","Pravidlo 10 % Scrumban pro každý sprint | AELBOX",{"type":9,"value":515,"toc":582},[516,523,531,535,538,546,550,554,557,561,564,567,575,579],[12,517,518],{},[15,519],{"alt":520,"height":521,"loading":19,"src":522,"width":21,"fetchPriority":22},"Karty planning pokeru a kanbanová tabule na konferenčním stolku",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,524,525,526,530],{},"Mnoho týmů plánuje přesně tu kapacitu, kterou ukazuje plán v Jira. To je často chyba a vede k neúspěšným sprintům. Proč se to děje, když ",[49,527,529],{"href":528},"\u002Fcs\u002Fblog\u002Fthe-importance-of-predictable-velocity","výpočty kapacity"," vypadají tak přesně?",[41,532,534],{"id":533},"honba-za-větším-výkonem","Honba za větším výkonem",[12,536,537],{},"Product Owner se po každém úspěšném sprintu snaží tlačit na vyšší rychlost, což je přirozená reakce na poslední výsledky. Když tým minulý sprint zvládl určitý počet story pointů, očekává se, že příští sprint zvládne víc. To se opakuje, dokud nějaký sprint neselže. Tlak je snahou otestovat limity týmu. Podle našich zkušeností je kontraproduktivní. Nakonec tým demotivuje, protože začne každý další sprint považovat za předem prohraný.",[12,539,540],{},[15,541],{"alt":542,"height":543,"loading":32,"src":544,"width":545,"decoding":34},"Sprint odsouzený k neúspěchu",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,547,548],{},[38,549,542],{},[41,551,553],{"id":552},"hektický-konec-sprintu-při-honbě-za-dodáním","Hektický konec sprintu při honbě za dodáním",[12,555,556],{},"Když je kapacita naplánovaná tak, aby sprint zaplnila přesně, každé zpoždění nebo naplněné riziko vytváří tlak na zběsilé tempo na konci. Tým pak dodá méně, než slíbil, protože ho přemůže stres. Ten závěrečný spěch by měl zmizet.",[41,558,560],{"id":559},"nechte-tým-dodat-víc-z-vlastní-vůle","Nechte tým dodat víc z vlastní vůle",[12,562,563],{},"Plánujte jen 90 % kapacity týmu a zbývajících 10 % si nechte na neplánovanou práci z backlogu. Tyto úkoly se během sprintu vytahují z backlogu po vzoru Scrumbanu. Rezerva pohltí riziko a umožní týmu dokončit sprint (nebo aspoň cíl sprintu) o pár dní dřív. Když sprint ohrozí vnější závislost, úkol z rezervy může nahradit ten problematický.",[12,565,566],{},"Těch 10 % není součástí závazku sprintu. Pokud se riziko nenaplní, tým je dodá jako práci navíc; když se něco pokazí, rezerva se spotřebuje, ale cíl sprintu i závazek zůstanou splněné. Sledujte, kolik rezervy se využívá: pokud pravidelně dosahuje třeba 20 %, je čas zvýšit rychlost týmu o 10 % a rezervu 10 % si ponechat.",[12,568,569],{},[15,570],{"alt":571,"height":572,"loading":32,"src":573,"width":574,"decoding":34},"Dodat dřív, dodat navíc",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,576,577],{},[38,578,571],{},[12,580,581],{},"Naše zkušenosti ukazují, že právě tehdy lidé pracují bez tlaku a přispívají nejvíc. Rychlost pak může růst vlastním tempem týmu, bez vnějšího tlaku a s menším stresem. Růst působí přirozeně a udržitelně.",{"title":159,"searchDepth":160,"depth":160,"links":583},[584,585,586],{"id":533,"depth":160,"text":534},{"id":552,"depth":160,"text":553},{"id":559,"depth":160,"text":560},"2018-04-28","Závazek na plnou kapacitu dělá každý sprint křehkým. Desetiprocentní rezerva Scrumban pohltí riziko, ochrání cíl sprintu a nechá rychlost růst přirozeně.","Pravidlo 10 % Scrumban pro každý sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[592,593,594,595,333],"scrumban","kapacita sprintu","agilní rezerva","rychlost",{},"\u002Fblog\u002Fcs\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":513,"description":588},{"loc":597,"images":600,"lastmod":179},[601,602,603],{"loc":522},{"loc":544},{"loc":573},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fcs\u002Fthe-10-percent-scrumban-rule-for-every-sprint","Adqs9rxGSA0yyezn2zEW4QhkhLmWeS3IGZhSYxZVb50",{"id":608,"title":609,"author":7,"body":610,"dateModified":179,"datePublished":788,"description":789,"extension":182,"heading":790,"image":791,"imageAlt":616,"keywords":792,"locale":191,"meta":796,"navigation":193,"path":797,"reviewed":193,"seo":798,"sitemap":799,"slug":807,"stem":808,"translationKey":807,"__hash__":809},"blog\u002Fblog\u002Fcs\u002Fcorrectly-estimating-release-deadline.md","Jak odhadnout termín vydání pomocí story pointů | AELBOX",{"type":9,"value":611,"toc":774},[612,618,621,625,632,636,639,647,651,655,658,661,665,668,676,681,685,688,692,695,699,702,709,714,718,721,725,728,736,740,744,747,752,759,767,771],[12,613,614],{},[15,615],{"alt":616,"height":18,"loading":19,"src":617,"width":21,"fetchPriority":22},"Karty planning pokeru, Ganttův diagram a hrnek kávy na stole","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,619,620],{},"Důležitou součástí projektového řízení je odhad termínu vydání projektu. Jak ale předpovědět, kdy bude velký a složitý systém dodán?",[41,622,624],{"id":623},"problémy-s-odhadováním","Problémy s odhadováním",[12,626,627,628,631],{},"Abyste dodali včas, potřebujete spolehlivý odhad práce. ",[49,629,630],{"href":528},"Odhadování úkolů je obvykle obtížné",", zvlášť když se musíte zavázat k časovému odhadu u každého úkolu. Psychologicky je závazek na čas dokončení těžký a takové závazky často selhávají.",[65,633,635],{"id":634},"problém-s-časem","Problém s časem",[12,637,638],{},"Odhadovat čas je problematické z jednoduchého důvodu: čím složitější úkol, tím větší šance, že termín nestihnete. Záleží také na tom, kdo úkol dostane. Členové týmu pracují různým tempem a odvedou různé množství práce. Protože se dostupnost mění s dovolenými a školením, úkol odhadnutý nejrychlejším členem týmu může skončit u nejpomalejšího. Úhledný Ganttův diagram se změní v chaos: úkoly se opožďují a manažeři se neustále obávají, zda projekt skončí včas.",[12,640,641],{},[15,642],{"alt":643,"height":644,"loading":32,"src":645,"width":646,"decoding":34},"Rozbitý Ganttův diagram",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,648,649],{},[38,650,643],{},[65,652,654],{"id":653},"odpor-k-časovým-odhadům","Odpor k časovým odhadům",[12,656,657],{},"Když se implementátorů někdo ptá na odhad, často se brání: pokud odhad nesedí, kdo za to může? A když úkol odhadnutý jedním člověkem dostane někdo jiný, kdo je na vině, když se skutečný čas liší?",[12,659,660],{},"Výsledkem je nechuť odhadovat vůbec, což vedení ztěžuje správný odhad termínů dodání.",[41,662,664],{"id":663},"používání-story-pointů","Používání story pointů",[12,666,667],{},"Story pointy nabízejí alternativu k časovým odhadům. Story point není pevná jednotka práce; je to relativní odhad, který roste exponenciálně. Celý tým odhaduje společně při vylaďování.",[12,669,670],{},[15,671],{"alt":672,"height":673,"loading":32,"src":674,"width":675,"decoding":34},"Příklad story pointů",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,677,678],{},[38,679,680],{},"Příklad odhadů",[65,682,684],{"id":683},"sdílená-odpovědnost","Sdílená odpovědnost",[12,686,687],{},"U story pointů odhaduje každý úkol celý tým. Odhad je přijat, když s ním všichni souhlasí. Tím se vyhnete pozdějším dohadům o tom, kdo úkol odhadoval a jak dlouho opravdu trval. Tým se dohodl předem, takže odpovědnost je sdílená.",[65,689,691],{"id":690},"odhadování-složitosti","Odhadování složitosti",[12,693,694],{},"Story pointy zachycují složitost úkolu včetně vnějších závislostí a rizika, že se něco pokazí. Protože nejde o závazek k fyzické metrice, jako je čas, dává je tým snáz.",[65,696,698],{"id":697},"nejmenší-odhad","Nejmenší odhad",[12,700,701],{},"Protože jsou story pointy relativní, potřebujete kotvu, od které začnete. Kotvou je nejmenší jednotka práce, která vyžaduje nějaké implementační úsilí. Je to nejmenší množství práce, které tým dokáže odhadnout.",[12,703,704],{},[15,705],{"alt":698,"height":706,"loading":32,"src":707,"width":708,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,710,711],{},[38,712,713],{},"Nejnižší odhad",[65,715,717],{"id":716},"největší-odhad","Největší odhad",[12,719,720],{},"Story pointy rostou exponenciálně, aby ukázaly, že čím složitější úkol je, tím obtížněji se odhaduje. Škála může sahat do nekonečna (∞), i když se tento odhad používá zřídka. Největší odhad by měl odpovídat největšímu množství práce, které jeden člověk v průměru zvládne za sprint. Délka sprintu by měla odpovídat největšímu množství práce, které jeden člověk zvládne, aniž by ztratil kontrolu nad úkolem.",[65,722,724],{"id":723},"příběhy-větší-než-největší-odhad","Příběhy větší než největší odhad",[12,726,727],{},"Některé úkoly dostanou víc story pointů, než jeden člověk za sprint zvládne. Když je dáte do sprintu, vznikne přesah. Přesah dělá sprint neúplným a práci nedokončenou. Úkoly odhadnuté nad tímto limitem je třeba rozdělit na menší jednotky a odhadnout znovu.",[12,729,730],{},[15,731],{"alt":732,"height":733,"loading":32,"src":734,"width":735,"decoding":34},"Rozdělení 13 story pointů",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,737,738],{},[38,739,732],{},[41,741,743],{"id":742},"rychlost-ve-story-pointech","Rychlost ve story pointech",[12,745,746],{},"Rychlost je průměrný počet story pointů, které tým za sprint zvládne při plné dostupnosti. Dostupnost je podíl sprintu, který tým po odečtení dovolených, školení a podpory skutečně může věnovat projektové práci. Kapacita je rychlost vynásobená dostupností.",[12,748,749],{},[38,750,751],{},"kapacita = rychlost × dostupnost",[12,753,754,755,758],{},"Protože je kapacita vyjádřená ve story pointech, lze ji na čas převést pomocí poměru, který tým používá mezi story pointy a časem. Když je ",[49,756,757],{"href":528},"rychlost předvídatelná",", termín vydání lze odhadnout přesně. Výsledný Ganttův diagram postavený na story pointech a sprintech je stabilní a předvídatelný:",[12,760,761],{},[15,762],{"alt":763,"height":764,"loading":32,"src":765,"width":766,"decoding":34},"Opravený Ganttův diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,768,769],{},[38,770,763],{},[12,772,773],{},"To je ten posun: jakmile je rychlost stabilní, termín vydání se počítá, místo aby se hádal.",{"title":159,"searchDepth":160,"depth":160,"links":775},[776,780,787],{"id":623,"depth":160,"text":624,"children":777},[778,779],{"id":634,"depth":166,"text":635},{"id":653,"depth":166,"text":654},{"id":663,"depth":160,"text":664,"children":781},[782,783,784,785,786],{"id":683,"depth":166,"text":684},{"id":690,"depth":166,"text":691},{"id":697,"depth":166,"text":698},{"id":716,"depth":166,"text":717},{"id":723,"depth":166,"text":724},{"id":742,"depth":160,"text":743},"2018-04-14","Časové odhady selhávají, když se mění složitost a dostupnost. Jak story pointy, společné odhady a rychlost dělají termíny vydání předvídatelnými.","Jak odhadnout termín vydání","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[793,492,496,794,795],"termín vydání","rychlost sprintu","plánování kapacity",{},"\u002Fblog\u002Fcs\u002Fcorrectly-estimating-release-deadline",{"title":609,"description":789},{"loc":797,"images":800,"lastmod":179},[801,802,803,804,805,806],{"loc":617},{"loc":645},{"loc":674},{"loc":707},{"loc":734},{"loc":765},"correctly-estimating-release-deadline","blog\u002Fcs\u002Fcorrectly-estimating-release-deadline","b2TTDp0y82LszfWWyjGjctNe9Xbb97OrExYhvfeMgGg",{"id":811,"title":812,"author":7,"body":813,"dateModified":179,"datePublished":788,"description":959,"extension":182,"heading":960,"image":961,"imageAlt":819,"keywords":962,"locale":191,"meta":965,"navigation":193,"path":966,"reviewed":193,"seo":967,"sitemap":968,"slug":974,"stem":975,"translationKey":974,"__hash__":976},"blog\u002Fblog\u002Fcs\u002Fthe-importance-of-predictable-velocity.md","Předvídatelná rychlost: spolehlivé závazky sprintu | AELBOX",{"type":9,"value":814,"toc":949},[815,821,824,828,831,834,837,845,849,853,856,860,863,866,873,880,884,888,891,894,897,900,904,907,910,917,921,925,933,936,940,946],[12,816,817],{},[15,818],{"alt":819,"height":18,"loading":19,"src":820,"width":21,"fetchPriority":22},"Karty planning pokeru a stopky na konferenčním stolku","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,822,823],{},"Předvídatelná rychlost znamená vědět předem, kolik práce tým v daném období zvládne, a to na základě své dostupnosti.",[41,825,827],{"id":826},"problém-kolísající-rychlosti","Problém kolísající rychlosti",[12,829,830],{},"Když rychlost mezi sprinty kolísá, plánování vydání je obtížné. Nikdo neví, kdy bude práce dodaná, a celý proces Scrumu se hroutí. Nastoupí chaos, který morálce týmu zrovna nepomůže.",[12,832,833],{},"Kolísající rychlost obvykle vzniká proto, že se členové týmu snaží udělat maximum a zavazují se k víc, než dokážou dodat. V prostředí spolupráce s dobře nastaveným vývojovým procesem toho úkol obnáší víc než jen samotnou implementaci. Některým členům týmu se poštěstí a dostanou úkoly, které se implementují poměrně snadno, jiní narazí na problém, který nikdo nečekal. V jednom sprintu vypadá rychlost vysoko, protože tým dohání nedokončené položky; v dalším klesne, protože se objeví nové.",[12,835,836],{},"Nedokončené položky vzbuzují dojem, že tým podává slabší výkon: mohl by zvládnout víc, ale vždycky se objeví něco nepředvídatelného. Vedení si problému všimne, vidí zmeškané termíny a v týmu roste napětí.",[12,838,839],{},[15,840],{"alt":841,"height":842,"loading":32,"src":843,"width":844,"decoding":34},"Běžný sprint s nedokončenými položkami",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,846,847],{},[38,848,841],{},[41,850,852],{"id":851},"časté-problémy-s-udržením-předvídatelnosti","Časté problémy s udržením předvídatelnosti",[12,854,855],{},"Problémy se liší projekt od projektu, ale mnohé jsou společné všem typům projektů. Tady jsou ty obvyklé, včetně praktických řešení.",[65,857,859],{"id":858},"počítejte-s-neočekávaným","Počítejte s neočekávaným",[12,861,862],{},"Některé úkoly potřebují výzkum, než mohou začít. Představte si funkci, která závisí na třetí straně, jež nemusí odpovědět, když ji potřebujete. Nebo funkci, kterou nelze implementovat podle plánu, protože tým při zadání úkolu nepochopil technologii, na které stojí.",[12,864,865],{},"Když se takový úkol dostane do sprintu bez potřebného výzkumu, pravděpodobně potrvá déle, než se čekalo, a odhad bude na vině. Někdo by namítl, že je potřeba nejdřív udělat spike a téma prozkoumat. Ale jak poznáte, které úkoly ho potřebují?",[12,867,868,869,872],{},"Jediná cesta je ",[49,870,871],{"href":301},"začít na úkolu pracovat dopředu",". Když se začne dřív, než je úkol naplánovaný, jde problémy najít ještě předtím, než nastanou. S tímto přístupem se úkol dostane do sprintu až ve chvíli, kdy je jasný a část práce je hotová.",[12,874,875],{},[15,876],{"alt":877,"height":842,"loading":32,"src":878,"width":879,"decoding":34},"Sprinty s úkoly zahájenými dopředu","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,881,882],{},[38,883,877],{},[65,885,887],{"id":886},"vyhněte-se-mlhavým-zadáním","Vyhněte se mlhavým zadáním",[12,889,890],{},"Některá zadání vypadají pro svého autora přijatelně, ale vynechávají důležité detaily. Některé implementační detaily mohou dodání vážně ovlivnit.",[12,892,893],{},"Lidé z byznysu mohou namítat, že zadání úkolu nemá obsahovat technické detaily, jenže ti, kdo ho implementují, často považují požadavky za příliš vágní na to, aby podle nich mohli pracovat.",[12,895,896],{},"Řešením je dokument technického designu, na který se implementační úkol odkazuje. Tím je jasné, co přesně se má postavit.",[12,898,899],{},"Pomáhá také uvést technické detaily přímo v popisu úkolu, aby implementátoři věděli, co je potřeba udělat, a mohli případné problémy odhalit včas.",[65,901,903],{"id":902},"snižte-kapacitu-podle-fibonacciho-posloupnosti","Snižte kapacitu podle Fibonacciho posloupnosti",[12,905,906],{},"Někdy si členové týmu berou dovolenou nebo do sprintu spadne státní svátek. Dostupnost snižují i školení a interní akce: čas, který tým může věnovat projektové práci. V takovém případě je třeba kapacitu snížit podle chybějících lidí.",[12,908,909],{},"Předpokládá se, že rychlost je konstantní, ale počítá se z průměrné rychlosti všech v týmu. Pro zjednodušení předpokládejme, že jeden člověk zvládne jeden story point za den. Pokud jeden člověk chybí jeden den, snižte kapacitu sprintu o jeden story point. Pokud dva lidé chybí dva dny (čtyři story pointy), snižte kapacitu o pět story pointů (další Fibonacciho číslo), ne o čtyři. Pokud dva lidé chybí tři dny, snižte kapacitu o osm bodů, ne o šest, abyste zohlednili riziko závislostí.",[12,911,912],{},[15,913],{"alt":914,"height":842,"loading":32,"src":915,"width":916,"decoding":34},"Závazek na menší kapacitu, než jaká byla spočítána","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,918,919],{},[38,920,914],{},[65,922,924],{"id":923},"vyhněte-se-závislým-úkolům","Vyhněte se závislým úkolům",[12,926,927,928,932],{},"Často jeden člověk dokončí úkol, na kterém závisí úkol jiného člena týmu. Tím vznikají ",[49,929,931],{"href":930},"\u002Fcs\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","závislosti uvnitř týmu i mezi týmy",". Když se první úkol opozdí, posune se každý závislý úkol. Členové týmu zahálí a pak spěchají, jakmile závislost zmizí, a ztrácejí cenný čas.",[12,934,935],{},"Se závislými úkoly lze začít dřív, takže do dalšího sprintu jsou kritické nadřazené úkoly téměř hotové. Tím se dopad závislosti na rychlost v aktuálním sprintu sníží.",[65,937,939],{"id":938},"odhadejte-poctivě","Odhadejte poctivě",[12,941,942,945],{},[49,943,944],{"href":287},"Poctivé odhadování úkolů"," je obtížné a vyžaduje pozornost celého týmu. Každý by měl odhadovat bez vlivu odhadů ostatních. Jen poctivé odhady ukážou, jak dlouho epic opravdu potrvá, a udrží termíny vydání realistické.",[12,947,948],{},"Předvídatelná rychlost není nástroj ani metrika, kterou týmu nařídíte; je to výsledek postupného odstraňování překvapení. Začněte pěti kroky výše a termín vydání přestane být hádankou.",{"title":159,"searchDepth":160,"depth":160,"links":950},[951,952],{"id":826,"depth":160,"text":827},{"id":851,"depth":160,"text":852,"children":953},[954,955,956,957,958],{"id":858,"depth":166,"text":859},{"id":886,"depth":166,"text":887},{"id":902,"depth":166,"text":903},{"id":923,"depth":166,"text":924},{"id":938,"depth":166,"text":939},"Proč se rychlost mezi sprinty mění a jak udělat závazky předvídatelnými: pět praktických kroků pro plánování, kapacitu a závislosti.","Význam předvídatelné rychlosti","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[963,794,496,492,964],"předvídatelná rychlost","plánování vydání",{},"\u002Fblog\u002Fcs\u002Fthe-importance-of-predictable-velocity",{"title":812,"description":959},{"loc":966,"images":969,"lastmod":179},[970,971,972,973],{"loc":820},{"loc":843},{"loc":878},{"loc":915},"the-importance-of-predictable-velocity","blog\u002Fcs\u002Fthe-importance-of-predictable-velocity","cxFWDc5JYwhQ91I0dM5v-VSUWW3vFP0vf6hyscJOhh0",1795345546449]